Intent To Prepare an Environmental Impact Statement for the New Haven Harbor (New Haven, Connecticut) Navigation Improvement Project
Document Number: 2016-31210
Type: Notice
Date: 2016-12-27
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), New England District is conducting a feasibility study and Environmental Impact Statement (EIS) to examine navigation-improvements to the existing New Haven Harbor Federal Navigation project. The non-Federal sponsor for the study is the New Haven Port Authority in partnership with the Connecticut State Port Authority. Inadequate channel depths result in navigation inefficiencies in transporting goods into and out of the harbor. To reach the terminals, larger ships must lighter outside the breakwaters and/or experience delays while waiting for favorable tide conditions, or both. Deeper and wider navigation features (main channel, maneuvering area, and turning basin) are needed to increase the navigation efficiency and safety of New Haven Harbor.
Notice of Availability-Final Environmental Impact Statement for the Update of the Water Control Manuals and Water Supply Storage Assessment for the Apalachicola-Chattahoochee-Flint River Basin
Document Number: 2016-30295
Type: Notice
Date: 2016-12-16
Agency: Department of Defense, Department of the Army, Corps of Engineers
Notice is hereby given that the U.S. Army Corps of Engineers, Mobile District (USACE), has released the Final Environmental Impact Statement (FEIS) for the update of the Apalachicola-Chattahoochee-Flint (ACF) Water Control Master Manual (Master Manual) Alabama, Florida, and Georgia including a water supply storage assessment addressing reallocation of storage in Lake Sidney Lanier (Lake Lanier). A Notice of Availability was published by the Environmental Protection Agency on December 16, 2016. The review period will end 30 days after that date.
Implementation of Executive Orders on Floodplain Management and Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input
Document Number: 2016-30240
Type: Notice
Date: 2016-12-16
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE) has developed draft internal agency implementation guidance for the Executive Order on Floodplain Management to incorporate the new requirements of the Executive Order on Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input. USACE is seeking feedback from partners, other government and non-government stakeholders, Tribes, and members of the general public on the proposed draft guidance that has been developed.
United States Navy Restricted Area, SUPSHIP USN, Gulf Coast, Pascagoula, Mississippi
Document Number: 2016-30015
Type: Rule
Date: 2016-12-15
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps) is establishing a restricted area around the Huntington Ingalls Incorporated/Ingalls Shipbuilding and Dry Dock (HII) facility located in Pascagoula Mississippi, because of the sensitive nature of the on-going and potential future activities at that facility. The Supervisor of Shipbuilding, Conversion and Repair, Gulf Coast, located in Pascagoula, Mississippi is responsible for United States Navy shipbuilding activities at the HII facility, USA located in Pascagoula, Mississippi. The restricted area will be used for on-going construction when vessels are placed in the water. The restricted area is essential to protect persons and property from the dangers associated with the operation and safeguard the area from accidents, sabotage and other subversive acts.
East Pearl River, Within the Acoustic Buffer Area of the John C. Stennis Space Center, and Adjacent to Lands, in Hancock County, Mississippi; Danger Zone
Document Number: 2016-30013
Type: Proposed Rule
Date: 2016-12-14
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps) is proposing to revise the existing regulations for a danger zone at the Naval Special Warfare Center (NSWC) N31 Branch within the acoustic buffer of the John C. Stennis Space Center on the East Pearl River, in Hancock County, Mississippi. The Navy requested establishment of a danger zone on waterways and tributaries of the East Pearl that are used by Naval Special Warfare units to conduct riverine training. The purpose of the proposed danger zone is to ensure public safety by restricting access within the danger zone during training events. This amendment to the existing regulation is necessary to minimizing potential conflicts between local populace activities and ongoing military training in the subject area.
Record of Decision for the Trinity Parkway From IH-35/SH-183 to US-175/SH-310 Environmental Impact Statement, Dallas County, TX
Document Number: 2016-28844
Type: Notice
Date: 2016-12-01
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Fort Worth District, is issuing this notice to advise Federal, state, and local governmental agencies and the public that USACE has signed a Record of Decision (ROD) for the Trinity Parkway from Interstate Highway (IH) 35/State Highway (SH) 183 to United States (US) 175/SH 310 Environmental Impact Statement, Dallas County, TX. This ROD was rendered to declare that a USACE action, a Section 408 Permission of the City of Dallas to alter the Dallas Floodway, is in the public interest.
Intent To Prepare a Draft Environmental Impact Statement for Modification of the Bayou Lafourche and Lafourche-Jump Waterway, Louisiana, Navigation Channel Project in Lafourche Parish
Document Number: 2016-28218
Type: Notice
Date: 2016-11-23
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps), New Orleans District will be the lead agency for a draft Environmental Impact Statement (DEIS), to be integrated with a Feasibility Report (FR), for the Bayou Lafourche and Lafourche-Jump Waterway, Louisiana Project, in Lafourche Parish. The FR and DEIS will investigate channel modification to the Bayou Lafourche Waterway up to as much as 50 feet deep. The integrated document will be prepared by the Greater Lafourche Port Commission (GLPC).
Inland Waterways Users Board Meeting Notice
Document Number: 2016-27162
Type: Notice
Date: 2016-11-10
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's Web site at https:// www.iwr.usace.army.mil/Missions/Navigation/ InlandWaterwaysUsersBoard.aspx.
Notice of Intent To Prepare a Draft Environment Impact Statement and Conduct a Public Scoping Meeting for the Proposed Thousand Palms Flood Control Project Within the Thousand Palms Area of Coachella Valley, Riverside County, California (Corps File No. SPL-2014-00238-RJV)
Document Number: 2016-27063
Type: Notice
Date: 2016-11-09
Agency: Department of Defense, Department of the Army, Corps of Engineers
The purpose of this notice is to initiate a 45-day scoping process for preparation of a Draft Environmental Impact Statement (DEIS) for the Coachella Valley Water District's (CVWD) proposed Thousand Palms Flood Control Project.
Intent To Prepare a Draft Environmental Impact Statement, and Intent To Conduct Public Scoping Meetings for the Upper Susquehanna River Basin Comprehensive Flood Damage Reduction Study, New York
Document Number: 2016-26699
Type: Notice
Date: 2016-11-04
Agency: Department of Defense, Department of the Army, Corps of Engineers
In accordance with the National Environmental Policy Act (NEPA), the Baltimore District, U.S. Army Corps of Engineers (USACE), will prepare a Feasibility Report and EIS comprehensively evaluating flood-risk management (FRM) needs and opportunities in the upper Susquehanna River Basin in New York.
Intent To Prepare an Environmental Impact Statement for the Jasper Ocean Terminal in Jasper County, South Carolina
Document Number: 2016-25519
Type: Notice
Date: 2016-10-21
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps), Charleston District intends to prepare an Environmental Impact Statement (EIS) to assess the potential social, economic, and environmental effects of the proposed construction and operation of a marine container terminal by the Jasper Ocean Terminal (JOT) Joint Venture, a partnership between the Georgia Ports Authority (GPA) and the South Carolina Ports Authority (SCPA). In accordance with the National Environmental Policy Act (NEPA), the Corps is the lead Federal agency responsible for the preparation of the EIS. Information included in the EIS will serve as the basis for the Corps' evaluation of the proposed marine container terminal pursuant to Section 10 of the Rivers and Harbors Act (RHA) and Section 404 of the Clean Water Act (CWA). The EIS will assess the potential effects of the proposed project and a range of reasonable project alternatives on impacts to navigable waters and other waters of the United States. The EIS will also provide information for Federal, State, and local agencies having other jurisdictional responsibility.
Notice of Availability of the Draft Environmental Impact Statement for Millennium Bulk Terminals-Longview, LLC Shipping Terminal, in the Columbia River, Near Longview, Cowlitz County, Washington
Document Number: 2016-24312
Type: Notice
Date: 2016-10-07
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps) Seattle District has prepared a Draft Environmental Impact Statement (EIS) to analyze the direct, indirect, and cumulative effects of an action proposed by Millennium Bulk TerminalsLongview, LLC (MBTL) involving the Columbia River and adjacent waters of the United States. The Proposed Action is to construct and operate a shipping terminal to export up to 44 million metric tons of coal per year. Construction of the terminal and support facilities would result in the permanent loss of 29.3 acres of waters of the United States, consisting of 24.1 acres of wetlands and 5.2 acres of ditches and other waters. The proposed work requires Department of the Army authorization from the Corps under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The permit applicant is Millennium Bulk TerminalsLongview, LLC. This Draft EIS was prepared in accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, and Corps regulations for implementing NEPA (33 Code of Federal Regulations [CFR] Part 230 and Part 325, Appendix B). The Corps' Seattle District, is the lead federal agency, with the Environmental Protection Agency and U.S. Coast Guard participating as cooperating agencies. Information contained in this EIS will support a future decision regarding issuance of a Department of the Army permit under Sections 10 and 404. This EIS also provides information for state, local, and other Federal agencies having jurisdictional responsibility for the affected resources.
Record of Decision for the Remaining Balanced Vision Plan and Interior Drainage Plan Features Feasibility Report and Environmental Impact Statement, Dallas County, TX
Document Number: 2016-22321
Type: Notice
Date: 2016-09-16
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Fort Worth District, is issuing this notice to advise Federal, state, and local governmental agencies and the public that USACE has signed a Record of Decision (ROD) for the Remaining Balanced Vision Plan (BVP) and Interior Drainage Plan (IDP) Features Feasibility Report and Final Environmental Impact Statement, in Dallas County, TX. This ROD was rendered to declare that a USACE action, a Section 408 Permission for the City of Dallas to alter the Dallas Floodway, is in the public interest.
Meeting of the Chief of Engineers Environmental Advisory Board
Document Number: 2016-22062
Type: Notice
Date: 2016-09-15
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the Chief of Engineers, Environmental Advisory Board (EAB). This meeting is open to the public. For additional information about the EAB, please visit the committee's Web site at https://www.usace.army.mil/Missions/ Environmental/EnvironmentalAdvisoryBoard.aspx.
Notice of Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Proposed Lower Elkhorn Basin Levee Setback Project, Yolo County, CA
Document Number: 2016-21578
Type: Notice
Date: 2016-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Sacramento District, as the lead agency under the National Environmental Policy Act (NEPA), and the California Department of Water Resources (DWR), as the lead agency under the California Environmental Quality Act (CEQA), will prepare a joint Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Lower Elkhorn Setback Levee Project. DWR is the project proponent and may be referred to as the Applicant or Requester. The EIS/EIR will analyze DWR's proposed action to implement a flood risk management project in the Lower Elkhorn Basin in Yolo County, California. Because the proposed action would alter Federal levees, permission from USACE is required under Section 14 of the Rivers and Harbors Act (Section 408) (33 U.S.C. 408). The proposed action would also affect waters of the United States and require a permit from USACE under Section 404 of the Clean Water Act (33 U.S.C. 1344).
Draft Supplemental Environmental Impact Statement for the Dam Safety Modification Report, Bluestone Dam, Hinton, Summers County, WV
Document Number: 2016-21570
Type: Notice
Date: 2016-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (Corps), Huntington District prepared a Supplemental Draft Environmental Impact Statement (SDEIS) to disclose potential impacts to the natural, physical, and human environment resulting from modifications to Bluestone Dam. The original EIS was published in 1998 and a Record of Decision (ROD) was signed in 1999 concluding the NEPA process allowing the Corps to initiate implementation of the Bluestone Dam Safety Assurance (DSA) Project. When completed, the current modifications under construction will strengthen the dam's stability and allow for increased discharge capacity through the use of hydropower penstocks substantially reducing risk. However, physical modeling and expert analysis conducted during project construction indicated the downstream bedrock is vulnerable to an unacceptable degree of erosion during high flow events. The Corps has also recognized potential for unacceptable erosion associated with overtopping of areas of the dam not designed to be overtopped. After a full consideration of alternatives to achieve acceptable risk levels, this SDEIS recommends implementing modifications to the existing stilling basin to prevent scour that could result in spillway instability and thus dam failure. Modification may include alteration to the existing stilling basin to include installation of a concrete apron, larger baffles, and would also include non-structural risk management measures. This SDEIS also addresses the prolonged construction duration of modification features described in the original EIS and ROD.
Inland Waterways Users Board Meeting Notice
Document Number: 2016-21569
Type: Notice
Date: 2016-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's Web site at https:// www.iwr.usace.army.mil/Missions/Navigation/InlandWaterways UsersBoard.aspx.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Flood Risk Management Project for the Souris River Basin, North Dakota
Document Number: 2016-19738
Type: Notice
Date: 2016-08-18
Agency: Department of Defense, Department of the Army, Corps of Engineers
The St. Paul District, Army Corps of Engineers, in partnership with the Souris River Joint Water Resources Board (SRJB), is conducting a flood risk management feasibility study for the Souris River Basin within the continental United States. The feasibility study will include an Environmental Impact Statement and consider opportunities to reduce flood risk within Bonnineau, McHenry, Ward, and Renville counties, North Dakota. The study will evaluate several alternative measures, including, but not limited to: Levees and floodwalls, diversion channels, non-structural flood proofing, relocation of flood- prone structures, and flood storage.
Intent To Prepare a Draft Supplemental Environmental Impact Statement for the Springfield Supplemental Water Supply Project
Document Number: 2016-19353
Type: Notice
Date: 2016-08-15
Agency: Department of Defense, Department of the Army, Corps of Engineers
The United States Army Corps of Engineers (Corps) intends to prepare a Supplemental Environmental Impact Statement (SEIS) to address the proposed Springfield Supplemental Water Supply Project (previously referred to as the Proposed Water Supply Reservoir Hunter Lake) in Sangamon County, IL. The Corps, working in conjunction with the City of Springfield, Office of Public Utilities, also known as the City Water, Light & Power (City), prepared an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) of 1969 [42 U.S.C. 4321 et. seq.] that evaluated a range of alternatives to provide supplemental water supply to meet a projected deficit in water availability. A final EIS was prepared and published in November of 2000. The Final EIS (EIS No. 000402) was published in the Federal Register on November 24, 2000; however, no Record of Decision was issued. The City has conducted an updated water demand analysis that demonstrates a sustained need for additional water supply to meet current and future demands. In accordance with Council on Environmental Quality (CEQ) regulations specified in 40 CFR 1502.9, the Corps in conjunction with the City are initiating the preparation of an EIS supplement.
Deauthorization of Water Resources Projects
Document Number: 2016-19026
Type: Notice
Date: 2016-08-10
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers published a notice in the Federal Register, 74 FR 126 E9-15663 (July 2, 2009) announcing projects deauthorized under Section 1001(b)(2) WRDA 1986, as amended. This correction notice clarifies the deauthorization related to the Reelfoot Lake-Lake No 9 project.
Deauthorization of Water Resources Projects
Document Number: 2016-19024
Type: Notice
Date: 2016-08-10
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers is publishing the names of water resources projects that have been automatically deauthorized under the provisions of Sec. 1001(a), Public Law 99-662, as amended, 33 U.S.C. 579a(a).
United States Navy Restricted Area, Menominee River, Marinette Marine Corporation Shipyard, Marinette, Wisconsin
Document Number: 2016-19023
Type: Proposed Rule
Date: 2016-08-10
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers published a document in the Federal Register on May 24, 2011, amending its regulations to establish a restricted area in the Menominee River at the Marinette Marine Corporation Shipyard in Marinette, Wisconsin. The Corps published correcting amendments in the Federal Register on April 4, 2012, which corrected latitude and longitude coordinates and also revised administrative and enforcement responsibilities. The Corps is proposing to further amend these regulations to expand the existing restricted area to provide additional area of protection during the construction and launching of Littoral Combat Ships. The proposed expansion would result in temporary encroachment within the Menominee River Federal Navigation Channel. The regulations are necessary to provide adequate protection of U.S. Navy combat vessels, their materials, equipment to be installed therein, and crew, while located at the Marinette Marine Corporation Shipyard.
Deauthorization of Water Resources Projects
Document Number: 2016-19020
Type: Notice
Date: 2016-08-10
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers is publishing the names of water resources projects that have been automatically deauthorized under the provisions of Sec. 1001(b)(2), Public Law 99-662, as amended, 33 U.S.C 579a(b)(2).
Deauthorization of Water Resources Projects
Document Number: 2016-19016
Type: Notice
Date: 2016-08-10
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers is publishing the name of one water resources project that has been automatically deauthorized under the provisions of Sec. 350(b) of Public Law 106-541.
Intent To Prepare an Environmental Impact Statement for the Western Everglades Restoration Project, Hendry, Broward, Collier Counties, Florida
Document Number: 2016-17686
Type: Notice
Date: 2016-07-26
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Jacksonville District, U.S. Army Corps of Engineers (Corps) is beginning preparation of a National Environmental Policy Act assessment for the Western Everglades Restoration Project (WERP). The Everglades ecosystem, including Lake Okeechobee, encompasses a system of diverse wetland landscapes that are hydrologically and ecologically connected across more than 200 miles from north to south and across 18,000 square miles of southern Florida. In 2000, the U.S. Congress authorized the Federal government, in partnership with the State of Florida, to embark upon a multi-decade, multi-billion dollar Comprehensive Everglades Restoration Plan (CERP) to further protect and restore the remaining Everglades ecosystem while providing for other water-related needs of the region. CERP involves modification of the existing network of drainage canals and levees that make up the Central and Southern Florida Flood Control Project. One of the next steps for implementation of CERP is to identify opportunities within the tributary areas of Water Conservation Area (WCA) 3A to restore natural areas within the Big Cypress Seminole Indian Reservation and adjacent portions of Big Cypress National Preserve (BCNP) and the Miccosukee Indian Reservation. Encompassing approximately 440,000 acres located primarily in eastern Hendry County, WCA 3A tributary areas include the C-139, Feeder Canal and L-28 Gap Basins as well as the C-139 Annex and L-28 Interceptor. These areas are collectively called the Western Basins as they are located along the western edge of the Everglades and were historic flow ways. Both water supply and water quality of storm water runoff are challenges facing the Western Basins.
Board on Coastal Engineering Research
Document Number: 2016-16918
Type: Notice
Date: 2016-07-19
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the Board on Coastal Engineering Research. This meeting is open to the public.
Intent To Prepare an Environmental Impact Statement for the Lake Okeechobee Watershed Project, Okeechobee, Highlands, Charlotte, Glades, Martin and St. Lucie Counties, Florida
Document Number: 2016-16920
Type: Notice
Date: 2016-07-18
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Jacksonville District, U.S. Army Corps of Engineers (Corps) is beginning preparation of a National Environmental Policy Act assessment for the Lake Okeechobee Watershed Project (LOWP). The Everglades ecosystem, including Lake Okeechobee, encompasses a system of diverse wetland landscapes that are hydrologically and ecologically connected across more than 200 miles from north to south and across 18,000 square miles of southern Florida. In 2000, the U.S. Congress authorized the Federal government, in partnership with the State of Florida, to embark upon a multi-decade, multi-billion dollar Comprehensive Everglades Restoration Plan (CERP) to further protect and restore the remaining Everglades ecosystem while providing for other water-related needs of the region. CERP involves modification of the existing network of drainage canals and levees that make up the Central and Southern Florida Flood Control Project. One of the next steps for implementation of CERP is to identify opportunities to restore the quantity, quality, timing and distribution of flows into Lake Okeechobee. The LOW Project preliminary project area, where placement of features will be considered, covers a large portion of the Lake Okeechobee Watershed north of the lake. Water inflows into Lake Okeechobee greatly exceed outflow capacity, thus many times there is too much water within Lake Okeechobee that needs to be released in order to ensure integrity of the Herbert Hoover Dike. At other times, there may be too little water within Lake Okeechobee. Lake levels that are too high or too low, and inappropriate recession and ascension rates, can adversely affect native vegetation, and fish and wildlife species that depend upon the lake for foraging and reproduction. The volume and frequency of undesirable freshwater releases to the east and west lowers salinity in the estuaries, severely impacting oysters, sea grasses, and fish. Additionally, high nutrient levels adversely affect in-lake water quality, estuary habitat, and habitat throughout the Greater Everglades. The objectives of the LOW Project are to improve the quality, quantity, timing and distribution of water entering Lake Okeechobee, provide for better management of lake water levels, reduce damaging releases to the Caloosahatchee and St. Lucie estuaries downstream of the lake and improve system-wide operational flexibility.
Termination of Intent To Prepare a Draft Environmental Impact Statement for the Dam Safety Study, Lewisville Dam, Elm Fork Trinity River, Denton County, Texas
Document Number: 2016-16517
Type: Notice
Date: 2016-07-12
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Fort Worth District, is issuing this notice to advise Federal, state, and local governmental agencies and the public that USACE is withdrawing its Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement (EIS) for the Dam Safety Study, Lewisville Dam, Elm Fork Trinity River, Denton County, Texas.
Intent To Prepare an Integrated Feasibility/Environmental Impact Statement for the Proposed Rota Harbor Modifications Project, Island of Rota, Commonwealth of the Northern Mariana Islands
Document Number: 2016-16189
Type: Notice
Date: 2016-07-08
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the section 102(2) (C) of National Environmental Policy Act (NEPA) of 1969; the U.S. Army Corps of Engineers and the Commonwealth of the Northern Mariana Islands (CMNI), Municipality of Rota (Municipality)/Commonwealth Ports Authority (CPA) gives notice that an Integrated Feasibility/Environmental Impact Statement (F/EIS) report is being prepared for the Proposed Rota Harbor Modifications Project, Island of Rota, CNMI. This project is authorized under section 209 of the Rivers and Harbors Act of 1962 (Pub. L. 87-874) and will consider the implementation of navigation improvements at Rota Harbor.
Intent To Prepare an Integrated Feasibility/Environmental Impact Statement for the Proposed Tinian Harbor Modifications Project, Island of Tinian, Commonwealth of the Northern Mariana Islands
Document Number: 2016-16188
Type: Notice
Date: 2016-07-08
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the section 102(2) (C) of the National Environmental Policy Act (NEPA) of 1969; the U.S. Army Corps of Engineers and the Commonwealth of the Northern Mariana Islands (CNMI), Municipality of Tinian (Municipality)/Commonwealth Ports Authority (CPA) gives notice that an Integrated Feasibility/Environmental Impact Statement (F/EIS) is being prepared for the Proposed Tinian Harbor Modifications Project, Island of Tinian, CNMI. This project is authorized under section 209 of the Rivers and Harbors Act of 1962 (Pub. L. 87-874) and will consider the implementation of navigation improvements at Tinian Harbor.
The Release of the Final Environmental Impact Statement (FEIS) for the Figure Eight Island Shoreline Management Project, on Figure Eight Island, New Hanover County, NC
Document Number: 2016-15310
Type: Notice
Date: 2016-06-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Field Office has received a permit application for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from Figure Eight Beach Homeowners' Association Inc. (HOA) to install a terminal groin structure along Rich Inlet and to conduct a supplemental beach nourishment on approximately 4,500 linear feet of oceanfront beach and 1,400 linear feet of back barrier shoreline to protect residential homes and infrastructures along the central and northern sections of Figure Eight Island. The terminal groin structure will be placed perpendicular on the northern tip of the island along the shoulder of Rich Inlet; and the proposed source of the material for the nourishment will be dredged from an area within Nixon Channel, a back barrier channel, that has been previously used for past beach nourishment projects. In case the quantity of material from Nixon Channel is not sufficient, material pumped from (3) nearby upland disposal islands will be used to supplement the nourishment needs. The majority of the material will be disposed within the fillet area, or down shore, of the groin. Pending storm events and shoreline changes, proposed maintenance, or periodic nourishment, of the beach is once every five years, or potentially 6 separate events over the 30-year study period. Nixon Channel and the upland disposal islands are the proposed material sources for the periodic maintenance, or renourishment, events.
Public Notice of Intent for Studies and Initial Scoping Meeting for Gulf Intracoastal Waterway Brazos River Floodgates and Colorado River Locks Feasibility Study
Document Number: 2016-14694
Type: Notice
Date: 2016-06-22
Agency: Department of Defense, Department of the Army, Corps of Engineers
This notice provides a summary of the ongoing feasibility study activities for the Gulf Intracoastal Waterway (GIWW) Brazos River Floodgates (BRFG) and Colorado River Locks (CRL) Feasibility Study and solicit public input regarding the study. The objective of the feasibility study is to investigate and recommend solutions to improve traffic safety and navigation efficiencies at the confluence of the GIWW with the BRFG and CRL. The GIWW BRFG/CRL Feasibility Study will identify and evaluate possible structural and navigation alternatives to reduce traffic accidents and navigation delays. The non-Federal sponsor for the project is the Texas Department of Transportation (TXDOT).
Withdrawal of Notice of Intent for the Environmental Impact Statement Process for the Compass Minerals-Ogden's Solar Evaporation Pond Expansion Project Within the Great Salt Lake, Box Elder County, UT
Document Number: 2016-14688
Type: Notice
Date: 2016-06-22
Agency: Department of Defense, Department of the Army, Corps of Engineers
In accordance with the National Environmental Policy Act (NEPA), on November 1, 2007 the U.S. Army Corps of Engineers (Corps), Sacramento District, initiated the Environmental Impact Statement (EIS) process to evaluate the effects of the proposed expansion of solar evaporation ponds in the Great Salt Lake, Box Elder County, Utah and to assist the Corps in deciding whether to approve Great Salt Lake Mineral Corporation's application under Section 404 of the Clean Water Act. On December 23, 2015, the applicant for the proposed project withdrew their application for a Department of the Army Permit. Therefore, the Corps is terminating the EIS process, and is issuing this Notice of Intent to withdraw the November 1, 2007 Notice of Intent to Prepare an EIS.
Newmarket Creek CAP Section 205, City of Hampton, VA, NEPA Scoping Meeting and Public Comment Period
Document Number: 2016-13817
Type: Notice
Date: 2016-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the requirements of section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, 42 U.S.C. 4321-4370, as implemented by the Council on Environmental Quality Regulations (40 CFR parts 1500-1508), the U.S. Army Corps of Engineers (USACE) plans to prepare a Feasibility Study with an integrated Environmental Assessment (EA) to evaluate environmental impacts from reasonable project alternatives and to determine the potential for significant impacts related to an evaluation of structural and non- structural measures that could be implemented as a part of a Federal project, under the Section 205 Continuing Authorities Program (CAP), to reduce the flood risk in the portion of the Newmarket Creek watershed within the City boundaries. The Newmarket Creek watershed is subject to flooding from both rainfall and tidal events, and there is a history of flood damage within the watershed. If the USACE determines that there is a potential for a significant environmental impact, the USACE will issue a Notice of Intent to prepare an Environmental Impact Statement in the Federal Register.
Availability of a Draft Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Flood Risk Management Study, Little Colorado River at Winslow, Navajo County, AZ
Document Number: 2016-13077
Type: Notice
Date: 2016-06-03
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps), in cooperation with Navajo County Flood Control District, announces the availability of a Draft Integrated Feasibility Report (Draft IFR) including Feasibility Report and Environmental Impact Statement (EIS) for the Little Colorado River at Winslow Flood Risk Management Study, Navajo County, AZ for review and comment. The study evaluates alternatives to reduce the risk of damages and to reduce the life, safety, and health risks caused by flooding of the Little Colorado River (LCR) to the City of Winslow, surrounding community, and public and private infrastructure. A Notice of Intent to prepare the Draft EIS was published in the Federal Register on February 27, 2009 (74 FR 8918).
Proposal To Reissue and Modify Nationwide Permits
Document Number: 2016-12083
Type: Proposed Rule
Date: 2016-06-01
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps) is soliciting comments for the reissuance of the existing nationwide permits (NWPs), general conditions, and definitions, with some modifications. The Corps is also proposing to issue two new NWPs and one new general condition. The Corps is requesting comment on all aspects of these proposed nationwide permits. The reissuance process starts with this publication of the proposed NWPs in the Federal Register for a 60-day comment period. The purpose of this Federal Register document is to solicit comments on the proposed new and modified NWPs, as well as the NWP general conditions and definitions. Shortly after the publication of this Federal Register document, each Corps district will publish a public notice to solicit comments on its proposed regional conditions for these NWPs.
Inland Waterways Users Board Meeting Notice
Document Number: 2016-12267
Type: Notice
Date: 2016-05-25
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's Web site at https:// www.iwr.usace.army.mil/Missions/Navigation/ InlandWaterwaysUsersBoard.aspx.
Proposals by Non-Federal Interests, for Feasibility Studies and for Modifications to an Authorized Water Resources Development Project or Feasibility Study, for Inclusion in the Annual Report to Congress on Future Water Resources Development
Document Number: 2016-11944
Type: Notice
Date: 2016-05-20
Agency: Department of Defense, Department of the Army, Corps of Engineers
Section 7001 of Water Resources Reform and Development Act (WRRDA) 2014 requires that the Secretary of the Army to annually submit to the Congress a report (Annual Report) that identifies feasibility reports, proposed feasibility studies submitted by non-Federal interests, and proposed modifications to an authorized water resources development project or feasibility study that meet certain criteria. The Annual Report is to be based, in part, upon requests for proposals submitted by non-Federal interests.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Proposed Amoruso Ranch Project in Placer County, CA, Corps Permit Application Number SPK-2004-00888
Document Number: 2016-10644
Type: Notice
Date: 2016-05-06
Agency: Department of Defense, Department of the Army, Corps of Engineers
On March 17, 2014, Brookfield Sunset LLC (applicant) submitted a Department of the Army (DA) permit application for the discharge of dredged and/or fill material into waters of the United States (WOUS) associated with the construction of the proposed Amoruso Ranch project. On December 22, 2014, the U.S Army Corps of Engineers, Sacramento District (Corps) determined that the proposed discharge of fill material into WOUS may result in significant impacts to the environment, and that the preparation of an Environmental Impact Statement (EIS) is necessary. A revised DA permit application was submitted by the applicant on October 30, 2014. The applicant proposes to implement a large-scale, mixed-use, mixed density, master planned community. The proposed project consists of approximately 347 acres designated for residential use that would contain 2,827 dwelling units (in a mix of low, medium and high density), 51 acres for a village center and community commercial uses, 12 acres for public/quasi-public space containing a fire station and school, 161 acres of parks and natural avoided areas of open space reserve and/or preserve, and 82 acres of associated infrastructure containing roads and other public transportation corridors. Approximately 17 acres of the adjacent Al Johnson Wildlife Area property would be used to construct a 325-foot long drainage ditch. No other off-site improvements are included in the proposed project. A segment of the future Placer Parkway would be constructed by others on 49 acres of the site and is not part of this permit application. The proposed project site is approximately 674 acres and contains approximately 38.86 acres of WOUS, including: Vernal pools; seasonal wetlands; University Creek; and, grasslands. The proposed project would involve the discharge of fill material into approximately 18.64 acres of WOUS, including vernal pools, seasonal wetlands, and open water pond. The proposed project may also result in indirect impacts to WOUS, including wetlands.
Lake Eufaula Advisory Committee Meeting Notice
Document Number: 2016-10003
Type: Notice
Date: 2016-04-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the Lake Eufaula Advisory Committee (LEAC). The meeting is open to the public.
City of Norfolk Flood Risk Management Study NEPA Scoping Meeting and Public Comment Period
Document Number: 2016-10002
Type: Notice
Date: 2016-04-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the requirements of section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, 42 U.S.C. 4321-4370, as implemented by the Council on Environmental Quality Regulations (40 CFR parts 1500-1508), the U.S. Army Corps of Engineers (USACE) plans to prepare a Feasibility Study with an integrated Environmental Impact Statement (EIS) to evaluate environmental impacts from reasonable project alternatives and to determine the potential for significant impacts related to reduce future flood risk in ways that support the long[hyphen]term resilience and sustainability of the coastal ecosystem and surrounding communities due to sea level rise, local subsidence and storms, and to reduce the economic costs and risks associated with large[hyphen]scale flood and storm events in the City of Norfolk, Virginia.
Availability of a Final Regional Environmental Impact Statement To Analyze Potential Impacts Within Defined Geographic Regions in Texas That May Be Affected by Future U.S. Army Corps of Engineers, Fort Worth District, Permit Decisions for Future Surface Coal and Lignite Mine Expansions or Satellite Mines Within the District's Area of Responsibility
Document Number: 2016-10000
Type: Notice
Date: 2016-04-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Fort Worth District, as lead federal agency, has prepared this Regional Environmental Impact Statement (REIS) to analyze potential impacts within defined geographic regions in Texas that may be affected by future USACE, Fort Worth District, permit decisions for future surface coal and lignite mine expansions or satellite mines within the District's area of responsibility. The REIS has been prepared in compliance with the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR parts 1500-1508), and the USACE Procedures for Implementing NEPA (33 CFR part 230).
Termination of the Environmental Impact Statement for the Proposed Lake Columbia Regional Water Supply Reservoir Project in Texas
Document Number: 2016-09999
Type: Notice
Date: 2016-04-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers, Fort Worth District, Regulatory Division is notifying interested parties that it has terminated the process to develop a Revised Draft Environmental Impact Statement (DEIS) and has withdrawn the Section 404 Clean Water Act permit application for the proposed `Lake Columbia Regional Water Supply Reservoir Project' submitted in 2005 by an independent governmental agency known as the Angelina & Neches River Authority (ANRA). The original Notice of Intent to Prepare an EIS was published in the Federal Register on Friday, June 28, 2005 (70 FR 37094).
Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Installation of a Terminal Groin Structure at the Eastern End of Ocean Isle Beach, Extending Into the Atlantic Ocean, West of Shallotte Inlet (Brunswick County, NC)
Document Number: 2016-09997
Type: Notice
Date: 2016-04-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Wilmington District, Wilmington Regulatory Field Office has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from the Town of Ocean Isle Beach to install a terminal groin structure on the east side of Ocean Isle Beach, extending into the Atlantic Ocean, just west of Shallotte Inlet. The structure will be designed to function in concert with the Federal storm damage reduction project.
Arlington National Cemetery Southern Expansion Project and Associated Roadway Realignment, NEPA Scoping Meeting and Public Comment Period
Document Number: 2016-09053
Type: Notice
Date: 2016-04-20
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the requirements of the National Environmental Policy Act of 1969, as amended (NEPA), 42 U.S.C. 4321-4370, as implemented by the Council on Environmental Quality Regulations (40 CFR parts 1500-1508), the U.S. Army Corps of Engineers (USACE), on behalf of the Arlington National Cemetery (ANC), plans to prepare an Environmental Assessment (EA) to evaluate environmental impacts from reasonable project alternatives and to determine the potential for significant impacts related to the proposed ANC Southern Expansion Project and Associated Roadway Realignment. If the ANC and the USACE determine that there is a potential for a significant environmental impact, the USACE will issue a Notice of Intent to prepare an Environmental Impact Statement (EIS) in the Federal Register.
National Wetland Plant List
Document Number: 2016-08917
Type: Notice
Date: 2016-04-18
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps), as part of an interagency effort with the U.S. Environmental Protection Agency (EPA), the U.S. Fish and Wildlife Service (FWS) and the U.S. Department of Agriculture Natural Resources Conservation Service (NRCS), is announcing the availability of the final 2016 National Wetland Plant List (NWPL). The NWPL is used to determine whether the hydrophytic vegetation parameter is met when conducting wetland determinations under the Clean Water Act and the Wetland Conservation Provisions of the Food Security Act. Other applications of the list include wetland restoration, establishment, and enhancement projects. The list will become effective on May 1, 2016 and will be used in any wetland delineation performed after this date. Delineations received prior to this date may still use the 2014 NWPL, or you may choose to use the 2016 list. Always reference the list used on any wetland delineation/ determination forms.
Notice of Intent To Prepare a Draft Integrated Feasibility Report Including Environmental Impact Statement/Environmental Impact Report (Integrated Feasibility Report) for the East San Pedro Bay Ecosystem Restoration Feasibility Study, Los Angeles County, CA
Document Number: 2016-07284
Type: Notice
Date: 2016-03-31
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Los Angeles District of the U.S. Army Corps of Engineers (Corps) and the City of Long Beach intend to prepare a draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the East San Pedro Bay Ecosystem Restoration Feasibility Study, Los Angeles County, California. The components of the EIS/EIR will be contained in an Integrated Feasibility Report (IFR) that also includes a Feasibility Report.
Intent To Prepare a Draft Environmental Impact Statement for The Coastal Texas Protection and Restoration Feasibility Study
Document Number: 2016-07283
Type: Notice
Date: 2016-03-31
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE) intends to prepare a Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR-EIS) for the Coastal Texas Protection and Restoration Feasibility Study. This study will identify and evaluate the feasibility of developing a comprehensive plan for flood risk management, hurricane and storm risk management, and ecosystem restoration for the coastal areas of the State of Texas. The study will focus on providing for the protection, conservation, and restoration of wetlands, barrier islands, shorelines, and related lands and features that protect critical resources, habitat, and infrastructure from the impacts of coastal storms, hurricanes, erosion, and subsidence. This notice announces the USACE's intent to determine the scope of the issues to be addressed and for identifying the significant resources related to a proposed action.
Meeting of the Chief of Engineers Environmental Advisory Board
Document Number: 2016-07062
Type: Notice
Date: 2016-03-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the Chief of Engineers, Environmental Advisory Board (EAB). This meeting is open to the public. For additional information about the EAB, please visit the committee's Web site at https://www.usace.army.mil/Missions/ Environmental/EnvironmentalAdvisoryBoard.aspx.
Intent To Prepare a Draft Environmental Impact Statement for the Houston Ship Channel 45-Foot Expansion Channel Improvement Project (HSC ECIP), Harris and Chambers Counties, Texas
Document Number: 2016-07061
Type: Notice
Date: 2016-03-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE) intends to prepare an environmental impact statement (EIS) for the Houston Ship Channel 45- Foot Expansion Channel Improvement Project (HSC ECIP), Harris and Chambers Counties, Texas. This study will identify and evaluate a combination of modifications to the HSC to improve the efficiency and safety of the HSC system. A 905(b) report recommending a cost shared feasibility- level study was approved on September 22, 2015.