Download as PDF Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices or developed an illness on any incident occurring at Exchange facilities. Dated: May 16, 2016. Aaron Siegel, Alternate OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 2016–11890 Filed 5–19–16; 8:45 am] BILLING CODE 5001–06–P DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Proposals by Non-Federal Interests, for Feasibility Studies and for Modifications to an Authorized Water Resources Development Project or Feasibility Study, for Inclusion in the Annual Report to Congress on Future Water Resources Development AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Notice. Section 7001 of Water Resources Reform and Development Act (WRRDA) 2014 requires that the Secretary of the Army to annually submit to the Congress a report (Annual Report) that identifies feasibility reports, proposed feasibility studies submitted by non-Federal interests, and proposed modifications to an authorized water resources development project or feasibility study that meet certain criteria. The Annual Report is to be based, in part, upon requests for proposals submitted by non-Federal interests. SUMMARY: Proposals must be submitted online by September 19, 2016. ADDRESSES: Submit proposals online at: https://www.usace.army.mil/Missions/ CivilWorks/ProjectPlanning/ WRRDA7001Proposals.aspx. If a different method of submission is required, use the further information below to arrange an alternative submission process. FOR FURTHER INFORMATION CONTACT: Send an email to the help desk at WRRDA7001Proposal@usace.army.mil or call Lisa Kiefel, Planning and Policy Division, Headquarters, USACE, Washington, DC at 202–761–0626. SUPPLEMENTARY INFORMATION: Section 7001 of WRRDA 2014 requires the publication of a notice in the Federal Register to request proposals by nonFederal interests for feasibility studies and modifications to an authorized USACE water resources development project or feasibility study. Project feasibility reports that have successfully completed Executive Branch review, but mstockstill on DSK3G9T082PROD with NOTICES DATES: VerDate Sep<11>2014 17:40 May 19, 2016 Jkt 238001 have not been authorized will be included in the Annual Report table by the Secretary of the Army and these proposals do not need to be submitted in response to this notice. Proposals by non-Federal interests must be entered online and require the following information: 1. The name of all non-Federal interests planning to act as the sponsor, including any non-Federal interest that has contributed to or is expected to contribute toward the non-Federal share of the proposed feasibility study or modification. 2. State if this proposal is for a feasibility study or a modification to an authorized USACE water resources development project or feasibility study and, if a modification, specify the authorized water resources development project or study that is proposed for modification. 3. State the specific project purpose(s) of the proposed study or modification. 4. Provide an estimate, to the extent practicable, of the total cost, and the Federal and non-Federal share of those costs, of the proposed study and, separately, an estimate of the cost of construction or modification. 5. Describe, to the extent applicable and practicable, an estimate of the anticipated monetary and non-monetary benefits of the proposal with regard to benefits to the protection of human life and property; improvement to transportation; the national economy; the environment; or the national security interests of the United States. 6. Describe if local support exists for the proposal. 7. State if the non-Federal interest has the financial ability to provide for the required cost share, reference ER 1105– 2–100. 8. Upload a letter or statement of support from each associated nonFederal interest. All provided information may be included in the Annual Report to Congress on Future Water Resources Development. Therefore, information that is Confidential Business Information; information that should not be disclosed because of statutory restrictions; or other information that a non-Federal interest would not want to appear in the Annual Report should not be included. Process: Proposals received within the time frame set forth in this notice will be reviewed by the Chief of Engineers and Secretary of the Army and will be presented in one of two tables. The first table will be in the Annual Report itself, and the second table will be in an appendix. To be included in the Annual PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 31919 Report table, the proposals must meet the following criteria: 1. Are related to the missions and authorities of the USACE; Involves a proposed or existing USACE water resources project or effort whose primary purpose is flood and storm damage reduction, commercial navigation, or aquatic ecosystem restoration. Following long-standing USACE practice, related proposals such as for recreation, hydropower, or water supply, are eligible for inclusion if undertaken in conjunction with such a project or effort. 2. Require specific congressional authorization, including by an Act of Congress; This is envisioned to comprise the following cases: a. SEEKING CONSTRUCTION AUTHORIZATION. • Signed Chief’s Reports or nonFederal feasibility reports submitted to the Secretary of the Army under Section 203 of WRDA 1986, as amended, under review, • Signed Chief’s Report or nonFederal feasibility reports not yet submitted to the Secretary of the Army under Section 203 of WRDA 1986, as amended, • Ongoing feasibility studies that are expected to result in a Chief’s Report, and • Proposed modifications to authorized water resources development projects requested by non-Federal interests through the Section 7001 of WRRDA 2014 process. b. SEEKING STUDY AUTHORIZATION. • New feasibility studies proposed by non-Federal interests through the Section 7001 of WRRDA 2014 process will be evaluated by the USACE to determine whether or not there is existing study authority, and • Proposed modifications to studies requested by non-Federal interests through the Section 7001 of WRRDA 2014 process. c. The following cases are NOT CONSIDERED ELIGIBLE to be included in the Annual Report and will be included in the appendix for transparency: • Proposals for modifications to nonFederal activities where USACE has provided previous technical assistance. Examples of this type of work include the various environmental infrastructure programs. Authorization to provide technical assistance does not provide authorization of a water resources development project. • Proposals for construction of a new water resources development project that is not the subject of a currently E:\FR\FM\20MYN1.SGM 20MYN1 mstockstill on DSK3G9T082PROD with NOTICES 31920 Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices authorized USACE project or a complete or ongoing feasibility study. • Proposals that do not include a request for a potential future water resources development project through completed feasibility reports, proposed feasibility studies, and proposed modifications to authorized projects or studies. d. For proposals seeking new construction authorization, CONSTRUCTION ON ANY PROJECT IN THE ANNUAL REPORT TABLE CANNOT PROCEED UNTIL Congress authorizes and funds the project. 3. Have not been congressionally authorized; 4. Have not been included in the Annual Report table of any previous Annual Report to Congress on Future Water Resources Development; and • If the proposal was included in the Annual Report table in a previous Report to Congress on Future Water Resources Development, then the proposal is not eligible to be included in the Annual Report table. If a proposal was previously included in an appendix it may be re-submitted. 5. If authorized, could be carried out by the USACE. • Whether following the USACE Chief’s Report process or Section 7001 of WRRDA 2014, a proposal for a project or a project modification would need a current decision document to provide updated information on the scope of the potential project and demonstrate a clear Federal interest. This determination would include an assessment of whether the proposal is: —Technically sound, economically viable and environmentally acceptable. —Compliant with environmental and other laws including but not limited to National Environmental Policy Act, Endangered Species Act, Coastal Zone Management Act, and the National Historic Preservation Act. —Compliant with statutes and regulations related to water resources development including various water resources provisions related to the authorized cost of projects, level of detail, separable elements, fish and wildlife mitigation, project justification, matters to be addressed in planning, and the 1958 Water Supply Act. Feasibility study proposals submitted by non-Federal interests are for the study only. If Congressional authorization of a feasibility study results from inclusion in the Annual Report, it is anticipated that such authorization would be for the study not for construction. Once a decision VerDate Sep<11>2014 17:40 May 19, 2016 Jkt 238001 document is completed in accordance with Executive Branch policies and procedures, the Secretary will determine whether to recommend the project for authorization. Section 902 of WRDA 1986 establishes a maximum authorized cost for projects (902 limit). A Post Authorization Change Report (PACR) is required to be completed to support potential modifications, updates to project costs, and an increase to the 902 limit. Authority to undertake a 902 study is inherent in the project authority, so no authority is required to proceed with the study. Since these PACRs support project modifications, they may be considered for inclusion in the Annual Report if a report’s recommendation requires Congressional authorization. The Secretary shall include in the Annual Report to Congress on Future Water Resources Development a certification stating that each feasibility report, proposed feasibility study, and proposed modification to an authorized water resources development project or feasibility study included in the Annual Report meets the criteria established in Section 7001 of WRRDA 2014. Please contact the appropriate district office or use the contact information above for assistance in researching and identifying existing authorizations and existing USACE decision documents. Those proposals that do not meet the criteria will be included in an appendix table included in the Annual Report to Congress on Future Water Resources Development. Proposals in the appendix table will include a description of why those proposals did not meet the criteria. Dated: May 6, 2016. Steven L. Stockton, Director of Civil Works. [FR Doc. 2016–11944 Filed 5–19–16; 8:45 am] BILLING CODE 3710–58–P DEPARTMENT OF EDUCATION [Docket No.: ED–2016–ICCD–0029] Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Comment Request; Foreign Graduate Medical School Consumer Information Reporting Form Federal Student Aid (FSA), Department of Education (ED). ACTION: Notice. AGENCY: In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 3501 et seq.), ED is SUMMARY: PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 proposing an extension of an existing information collection. DATES: Interested persons are invited to submit comments on or before June 20, 2016. ADDRESSES: To access and review all the documents related to the information collection listed in this notice, please use https://www.regulations.gov by searching the Docket ID number ED– 2016–ICCD–0029. Comments submitted in response to this notice should be submitted electronically through the Federal eRulemaking Portal at https:// www.regulations.gov by selecting the Docket ID number or via postal mail, commercial delivery, or hand delivery. Please note that comments submitted by fax or email and those submitted after the comment period will not be accepted. Written requests for information or comments submitted by postal mail or delivery should be addressed to the Director of the Information Collection Clearance Division, U.S. Department of Education, 400 Maryland Avenue SW., LBJ, Room 2E–103, Washington, DC 20202–4537. FOR FURTHER INFORMATION CONTACT: For specific questions related to collection activities, please contact Beth Grebeldinger, 202–377–4018. SUPPLEMENTARY INFORMATION: The Department of Education (ED), in accordance with the Paperwork Reduction Act of 1995 (PRA) (44 U.S.C. 3506(c)(2)(A)), provides the general public and Federal agencies with an opportunity to comment on proposed, revised, and continuing collections of information. This helps the Department assess the impact of its information collection requirements and minimize the public’s reporting burden. It also helps the public understand the Department’s information collection requirements and provide the requested data in the desired format. ED is soliciting comments on the proposed information collection request (ICR) that is described below. The Department of Education is especially interested in public comment addressing the following issues: (1) Is this collection necessary to the proper functions of the Department; (2) will this information be processed and used in a timely manner; (3) is the estimate of burden accurate; (4) how might the Department enhance the quality, utility, and clarity of the information to be collected; and (5) how might the Department minimize the burden of this collection on the respondents, including through the use of information technology. Please note that written comments received in response to this notice will be considered public records. E:\FR\FM\20MYN1.SGM 20MYN1

Agencies

[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Pages 31919-31920]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11944]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Proposals by Non-Federal Interests, for Feasibility Studies and 
for Modifications to an Authorized Water Resources Development Project 
or Feasibility Study, for Inclusion in the Annual Report to Congress on 
Future Water Resources Development

AGENCY: U.S. Army Corps of Engineers, DoD.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Section 7001 of Water Resources Reform and Development Act 
(WRRDA) 2014 requires that the Secretary of the Army to annually submit 
to the Congress a report (Annual Report) that identifies feasibility 
reports, proposed feasibility studies submitted by non-Federal 
interests, and proposed modifications to an authorized water resources 
development project or feasibility study that meet certain criteria. 
The Annual Report is to be based, in part, upon requests for proposals 
submitted by non-Federal interests.

DATES: Proposals must be submitted online by September 19, 2016.

ADDRESSES: Submit proposals online at: https://www.usace.army.mil/Missions/CivilWorks/ProjectPlanning/WRRDA7001Proposals.aspx. If a 
different method of submission is required, use the further information 
below to arrange an alternative submission process.

FOR FURTHER INFORMATION CONTACT: Send an email to the help desk at 
WRRDA7001Proposal@usace.army.mil or call Lisa Kiefel, Planning and 
Policy Division, Headquarters, USACE, Washington, DC at 202-761-0626.

SUPPLEMENTARY INFORMATION: Section 7001 of WRRDA 2014 requires the 
publication of a notice in the Federal Register to request proposals by 
non-Federal interests for feasibility studies and modifications to an 
authorized USACE water resources development project or feasibility 
study. Project feasibility reports that have successfully completed 
Executive Branch review, but have not been authorized will be included 
in the Annual Report table by the Secretary of the Army and these 
proposals do not need to be submitted in response to this notice.
    Proposals by non-Federal interests must be entered online and 
require the following information:
    1. The name of all non-Federal interests planning to act as the 
sponsor, including any non-Federal interest that has contributed to or 
is expected to contribute toward the non-Federal share of the proposed 
feasibility study or modification.
    2. State if this proposal is for a feasibility study or a 
modification to an authorized USACE water resources development project 
or feasibility study and, if a modification, specify the authorized 
water resources development project or study that is proposed for 
modification.
    3. State the specific project purpose(s) of the proposed study or 
modification.
    4. Provide an estimate, to the extent practicable, of the total 
cost, and the Federal and non-Federal share of those costs, of the 
proposed study and, separately, an estimate of the cost of construction 
or modification.
    5. Describe, to the extent applicable and practicable, an estimate 
of the anticipated monetary and non-monetary benefits of the proposal 
with regard to benefits to the protection of human life and property; 
improvement to transportation; the national economy; the environment; 
or the national security interests of the United States.
    6. Describe if local support exists for the proposal.
    7. State if the non-Federal interest has the financial ability to 
provide for the required cost share, reference ER 1105-2-100.
    8. Upload a letter or statement of support from each associated 
non-Federal interest.
    All provided information may be included in the Annual Report to 
Congress on Future Water Resources Development. Therefore, information 
that is Confidential Business Information; information that should not 
be disclosed because of statutory restrictions; or other information 
that a non-Federal interest would not want to appear in the Annual 
Report should not be included.
    Process: Proposals received within the time frame set forth in this 
notice will be reviewed by the Chief of Engineers and Secretary of the 
Army and will be presented in one of two tables. The first table will 
be in the Annual Report itself, and the second table will be in an 
appendix. To be included in the Annual Report table, the proposals must 
meet the following criteria:
    1. Are related to the missions and authorities of the USACE;
    Involves a proposed or existing USACE water resources project or 
effort whose primary purpose is flood and storm damage reduction, 
commercial navigation, or aquatic ecosystem restoration. Following 
long-standing USACE practice, related proposals such as for recreation, 
hydropower, or water supply, are eligible for inclusion if undertaken 
in conjunction with such a project or effort.
    2. Require specific congressional authorization, including by an 
Act of Congress;
    This is envisioned to comprise the following cases:
    a. SEEKING CONSTRUCTION AUTHORIZATION.
     Signed Chief's Reports or non-Federal feasibility reports 
submitted to the Secretary of the Army under Section 203 of WRDA 1986, 
as amended, under review,
     Signed Chief's Report or non-Federal feasibility reports 
not yet submitted to the Secretary of the Army under Section 203 of 
WRDA 1986, as amended,
     Ongoing feasibility studies that are expected to result in 
a Chief's Report, and
     Proposed modifications to authorized water resources 
development projects requested by non-Federal interests through the 
Section 7001 of WRRDA 2014 process.
    b. SEEKING STUDY AUTHORIZATION.
     New feasibility studies proposed by non-Federal interests 
through the Section 7001 of WRRDA 2014 process will be evaluated by the 
USACE to determine whether or not there is existing study authority, 
and
     Proposed modifications to studies requested by non-Federal 
interests through the Section 7001 of WRRDA 2014 process.
    c. The following cases are NOT CONSIDERED ELIGIBLE to be included 
in the Annual Report and will be included in the appendix for 
transparency:
     Proposals for modifications to non-Federal activities 
where USACE has provided previous technical assistance. Examples of 
this type of work include the various environmental infrastructure 
programs. Authorization to provide technical assistance does not 
provide authorization of a water resources development project.
     Proposals for construction of a new water resources 
development project that is not the subject of a currently

[[Page 31920]]

authorized USACE project or a complete or ongoing feasibility study.
     Proposals that do not include a request for a potential 
future water resources development project through completed 
feasibility reports, proposed feasibility studies, and proposed 
modifications to authorized projects or studies.
    d. For proposals seeking new construction authorization, 
CONSTRUCTION ON ANY PROJECT IN THE ANNUAL REPORT TABLE CANNOT PROCEED 
UNTIL Congress authorizes and funds the project.
    3. Have not been congressionally authorized;
    4. Have not been included in the Annual Report table of any 
previous Annual Report to Congress on Future Water Resources 
Development; and
     If the proposal was included in the Annual Report table in 
a previous Report to Congress on Future Water Resources Development, 
then the proposal is not eligible to be included in the Annual Report 
table. If a proposal was previously included in an appendix it may be 
re-submitted.
    5. If authorized, could be carried out by the USACE.
     Whether following the USACE Chief's Report process or 
Section 7001 of WRRDA 2014, a proposal for a project or a project 
modification would need a current decision document to provide updated 
information on the scope of the potential project and demonstrate a 
clear Federal interest. This determination would include an assessment 
of whether the proposal is:

--Technically sound, economically viable and environmentally 
acceptable.
--Compliant with environmental and other laws including but not limited 
to National Environmental Policy Act, Endangered Species Act, Coastal 
Zone Management Act, and the National Historic Preservation Act.
--Compliant with statutes and regulations related to water resources 
development including various water resources provisions related to the 
authorized cost of projects, level of detail, separable elements, fish 
and wildlife mitigation, project justification, matters to be addressed 
in planning, and the 1958 Water Supply Act.

    Feasibility study proposals submitted by non-Federal interests are 
for the study only. If Congressional authorization of a feasibility 
study results from inclusion in the Annual Report, it is anticipated 
that such authorization would be for the study not for construction. 
Once a decision document is completed in accordance with Executive 
Branch policies and procedures, the Secretary will determine whether to 
recommend the project for authorization.
    Section 902 of WRDA 1986 establishes a maximum authorized cost for 
projects (902 limit). A Post Authorization Change Report (PACR) is 
required to be completed to support potential modifications, updates to 
project costs, and an increase to the 902 limit. Authority to undertake 
a 902 study is inherent in the project authority, so no authority is 
required to proceed with the study. Since these PACRs support project 
modifications, they may be considered for inclusion in the Annual 
Report if a report's recommendation requires Congressional 
authorization.
    The Secretary shall include in the Annual Report to Congress on 
Future Water Resources Development a certification stating that each 
feasibility report, proposed feasibility study, and proposed 
modification to an authorized water resources development project or 
feasibility study included in the Annual Report meets the criteria 
established in Section 7001 of WRRDA 2014.
    Please contact the appropriate district office or use the contact 
information above for assistance in researching and identifying 
existing authorizations and existing USACE decision documents. Those 
proposals that do not meet the criteria will be included in an appendix 
table included in the Annual Report to Congress on Future Water 
Resources Development. Proposals in the appendix table will include a 
description of why those proposals did not meet the criteria.

    Dated: May 6, 2016.
Steven L. Stockton,
Director of Civil Works.
[FR Doc. 2016-11944 Filed 5-19-16; 8:45 am]
 BILLING CODE 3710-58-P