Intent To Prepare a Draft Environmental Impact Statement, and Intent To Conduct Public Scoping Meetings for the Upper Susquehanna River Basin Comprehensive Flood Damage Reduction Study, New York, 76936-76937 [2016-26699]
Download as PDF
76936
Federal Register / Vol. 81, No. 214 / Friday, November 4, 2016 / Notices
Radars, upgrades to airfield radome and
communications systems, upgrade
secure Identification Friend or Foe (IFF)
systems, site surveys, installation and
checkout, site acceptance testing,
interim contractor support,
construction, contractor logistics
support (CLS), spares, support
equipment and training. Cost for
additional non-MDE is $132 million.
The total overall estimated cost is $194
million.
(iv) Military Department: Air Force
(X7–D–DAB)
(v) Prior Related Cases, if any: None
(vi) Sales Commission, Fee, etc., Paid,
Offered, or Agreed to be Paid: None
(vii) Sensitivity of Technology
Contained in the Defense Article or
Defense Services Proposed to be Sold:
See Annex attached.
(viii) Date Report Delivered to
Congress: October 13, 2016
* as defined in Section 47(6) of the
Arms Export Control Act.
POLICY JUSTIFICATION
asabaliauskas on DSK3SPTVN1PROD with NOTICES
The Government of Kuwait-Radar Field
System
The Government of Kuwait has
requested a possible total sale of six (6)
Short Range Radars, otherwise known as
Gap Filler Radars, one (1) Long Range
Radar with Primary Surveillance Radar
(PSR) and Secondary Surveillance Radar
(SSR) arrays, upgrades to existing AN/
FPS 117 (V) 3 Long Range Radar,
upgrades to airfield radome and
communications systems, upgrade to
secure Identification Friend or Foe (IFF)
systems, site surveys, installation and
checkout, site acceptance testing,
interim contractor support,
construction, contractor logistics
support, spares, support equipment, and
training. The total estimated value of
this sale is $194 million.
The Government of Kuwait requested
a limited competition between three (3)
U.S. vendors to procure a total of six (6)
Short Range, Gap Filler Radars (e.g.,
AN/MPQ–64 Sentinel F1, AN/TPS–77,
or AN/TPS–703) and one (1) Long Range
Radar (e.g., AN/TPS–77 or AN/TPS–78).
Only one of the radars under
consideration, the AN/MPQ–64 is Major
Defense Equipment (MDE). The
remaining radars identified by Kuwait
for consideration are non-MDE.
This proposed sale supports U.S.
Government national security goals by
aiding a Major non-NATO Ally in the
reduction of transnational threats,
weapons proliferation, and the
movement and support of international
terrorists.
The Government of Kuwait desires
the radar field system in order to
VerDate Sep<11>2014
17:52 Nov 03, 2016
Jkt 241001
improve early warning, enhance
internal and external security, and
protect national sovereignty. The system
provides situational awareness for
Kuwaiti security forces to detect and
interdict fixed and rotary wing aircraft.
This procurement provides coverage for
Kuwait’s northern and eastern boarders.
The prime contractor will be
determined by competition between
Lockheed Martin, Bethesda Maryland,
Northrop Grumman, Falls Church,
Virginia, and the Raytheon Company,
Waltham, Massachusetts. There are no
known offset agreements proposed in
connection with this potential sale.
This procurement includes a small
number of U.S. contractor system and
maintenance advisors under a long-term
operations and maintenance support
package. The exact number of personnel
and period of performance is yet to be
finalized. This purchase will not
substantially alter the U.S. Government
presence in Kuwait.
There will be no adverse impact on
U.S. defense readiness as a result of this
proposed sale.
Transmittal No. 16–38
Notice of Proposed Issuance of Letter of
Offer Pursuant to Section 36(b)(l) of the
Arms Export Control Act
Annex
Item No. vii
(vii) Sensitivity of Technology:
1. The AN/MPQ–64 Sentinel Radar
System is a fielded air defense radar
system in the Army inventory. Sentinel
is a derivative of the AN/TPQ–36
Firefinder System used for artillery
detection and the AN/TPQ–36A
Norwegian adapted Hawk system.
Sentinel is a mobile, phased-array radar
that provides highly accurate 3
dimensional radar track data to using
systems via the Forward Area Air
Defense (FAAD) Command, Control,
and Intelligence (C2I) node. Sentinel
acquires, tracks, and reports cruise
missiles, unmanned aerial vehicles,
fixed and rotary wing aircraft in clutter
and electronic counter measures
environments. The Sentinel Export
configuration (AN/MPQ–64Fl) is a
derivative of the U.S. Army’s Improved
Sentinel Radar.
2. The Sentinel consists of a radarbased sensor system with the M1152
HighMobility Multipurpose Wheeled
Vehicle (HMMWV) as the prime mover
and the MEP–1041 Advanced Mobile
Medium Power Source (AMMPS)
Tactical Quiet Generator as the power
source. The sensor is an advanced
battlefield radar capable of X Band air
defense phased-array with an
instrumented range of 75 kilometers
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
with a rotating antenna providing 360
degree azimuth coverage for acquisition
and tracking.
3. Sentinel has only one item
currently designated Critical Program
Information (CPI) and that is the
Sentinel software modules containing
routines for electronic counter-counter
measures (ECCM) that have been
determined to be a CPI.
4. These items are classified IAW EO
12958 section 1.5, Classification
categories as category 1.5(e) because
they contain scientific, technological, or
economic matters relative to the
national security. Reports, test data, and
all Sentinel related media that discloses
operational parameters, performance,
characteristics, ECCM techniques,
vulnerabilities, limitations or
performance weaknesses shall be
classified at the highest level based on
the information being conveyed as
referenced in the Sentinel Security
Classification Guide. Distribution of
technical performance and system
capabilities reports and data shall only
be released up to the CONFIDENTIAL
level. It is not possible to obtain the
Sentinel wartime reserved frequencies
by reverse engineering, testing, or
analyzing the unclassified Sentinel end
item.
5. This sale is necessary in
furtherance of the U.S. foreign policy
and national security objectives
outlined in the Policy Justification.
Moreover, the benefits to be derived
from this sale, as outlined in the Policy
Justification, outweigh the potential
damage that could result if the sensitive
technology were revealed to
unauthorized persons.
6. All defense articles and services
listed in this transmittal are authorized
for release and export to the
Government of Kuwait.
[FR Doc. 2016–26711 Filed 11–3–16; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Intent To Prepare a Draft
Environmental Impact Statement, and
Intent To Conduct Public Scoping
Meetings for the Upper Susquehanna
River Basin Comprehensive Flood
Damage Reduction Study, New York
Department of the Army, U.S.
Army Corps of Engineers, DOD.
ACTION: Notice of intent.
AGENCY:
In accordance with the
National Environmental Policy Act
SUMMARY:
E:\FR\FM\04NON1.SGM
04NON1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 214 / Friday, November 4, 2016 / Notices
(NEPA), the Baltimore District, U.S.
Army Corps of Engineers (USACE), will
prepare a Feasibility Report and EIS
comprehensively evaluating flood-risk
management (FRM) needs and
opportunities in the upper Susquehanna
River Basin in New York.
DATES: The public scoping meeting
dates are:
1. November 21, 2016, at 1:30 p.m.
and 6:30 p.m. in the Hubbard
Auditorium of the Tioga County Office
Building.
2. November 22, 2016 at 1:30 p.m. and
6:30 p.m. at the Town of Chenango
Community Meeting Room.
3. November 30, 2016, at 6:30 p.m. in
the Village of Sidney.
ADDRESSES: Two scoping meetings will
be held in the Village of Owego on
Monday, November 21, 2016, at 1:30
p.m. and 6:30 p.m. in the Hubbard
Auditorium of the Tioga County Office
Building, 56 Main Street. Two scoping
meetings will be held in the Town of
Chenango on Tuesday, November 22,
2016 at 1:30 p.m. and 6:30 p.m. at the
Town of Chenango Community Meeting
Room at 1529 Upper Front Street (NY
Route 12). One meeting will be held on
November 30, 2016, at 6:30 p.m. in the
Village of Sidney in the Memorial
Public Library located at 8 River Street.
FOR FURTHER INFORMATION CONTACT:
Questions about the proposed scoping
meetings, requests to be placed on the
project information distribution list,
information requests or written
comments on the scope of the EIS and
the comprehensive FRM study can be
addressed to Mr. David W. Robbins,
U.S. Army Corps of Engineers, ATTN:
CENAB–PL–P, 10 S. Howard Street,
Baltimore, MD 21201, telephone 410–
962–0685; email address:
UpperSRBStudy@usace.army.mil.
Please contact me if you wish to speak
at the meetings or should you have
special needs (sign language
interpreters, access needs) at the above
address. Information about the study,
including public scoping meetings, is
available at the study Web site https://
www.nab.usace.army.mil/USRB_
Feasibility_Study/.
SUPPLEMENTARY INFORMATION: This
Notice initiates formal scoping for the
Environmental Impact Statement (EIS),
provides information on the nature of
the proposed Project, invites
participation in the EIS process, and
identifies potential environmental
effects to be considered. It also invites
comments from interested members of
the public, tribes, and agencies on the
scope of the EIS and announces
upcoming public scoping meetings.
Comments should address (1) feasible
VerDate Sep<11>2014
17:52 Nov 03, 2016
Jkt 241001
alternatives that may better achieve the
Project’s need and purposes with fewer
adverse impacts and (2) any significant
environmental impacts relating to the
alternatives.
Scoping meeting information will be
posted online by Baltimore District via
Web site postings and social media.
Meeting information will be provided
electronically via the study’s Web page
and in printed form to local libraries,
government offices, as well as mailed to
interested public.
For all meetings, staff will be
available to answer questions. All
interested parties are invited to speak at
the public meetings. The public scoping
peiod will begin on the date of
publication of this Notice and will
continue through 30 days following the
last public scoping meeting.
The study was authorized by a
Resolution of the House Committee on
Transportation and Infrastructure, on 24
September, 2008. The upper
Susquehanna Basin includes the
portions of Tioga, Broome, Chenango,
Cortland, Otsego, Delaware, Schoharie,
Herkimer, Oneida, Madison, Onondaga,
Tompkins, Schuyler, and Chemung
Counties in the Susquehanna River
Watershed of New York upstream of the
Chemung River confluence near
Waverly. The upper Susquehanna River
Basin repeatedly experiences flooding
damages, with recent notable events
occurring in 2006 and 2011. USACE is
undertaking the FRM study in
partnership with the New York State
Department of Environmental
Conservation (NYSDEC).
USACE and NYSDEC are seeking
public input to identify areas with
flooding concerns which may be of
interest to address in the context of the
study, and learn of area-specific
considerations important in formulating
any FRM plans. Study efforts will be
coordinated with the Federal Emergency
Management Area (FEMA), the U.S.
Geological Survey (USGS), as well as
other Federal and state agencies and
local governments.
An initial conceptual effort will be
completed using existing information to
identify areas of the basin that currently
do not have FRM infrastructure in place
and screen these areas for FRM needs
and opportunities. The study will
evaluate the level of FRM currently
provided by existing FRM infrastructure
under current conditions and projected
future conditions. Within the study
area, there are 20 existing USACE FRM
projects, as well as other non-Federal
FRM projects. The study will investigate
FRM strategies to reduce flood risk, as
well as reduce residual risk in areas
with existing FRM infrastructure.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
76937
Structural and non-structural FRM will
be considered. Hydrologic and
hydraulic modeling will be developed
for the majority of the Susquehanna
River main stem and major tributaries in
the basin to aid plan formulation.
The study will be conducted in
compliance with applicable federal laws
including the Clean Water Act, the
Endangered Species Act, the Clean Air
Act, the U.S. Fish and Wildlife
Coordination Act, the National Historic
Preservation Act, and the Farmland
Protection Policy Act. All appropriate
compliance documentation will be
obtained and included as part of the
EIS. It is currently anticipated that the
study will take three years and may lead
to the implementation of one or more
FRM projects. The EIS is expected to be
publicly released in Spring 2018.
David W. Robbins,
Acting Chief, Civil Project Development
Branch, Planning Division.
[FR Doc. 2016–26699 Filed 11–3–16; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Navy
Notice of Availability of Record of
Decision for the Northwest Training
and Testing Final Environmental
Impact Statement/Overseas
Environmental Impact Statement
Department of the Navy, DoD.
Notice.
AGENCY:
ACTION:
The Department of the Navy
(DoN), after carefully weighing the
strategic, operational, and
environmental consequences of the
proposed action, announces its decision
to continue and enhance training
activities as identified in Alternative 1
in the Northwest Training and Testing
Final Environmental Impact Statement/
Overseas Environmental Impact
Statement. This alternative includes
adjustments to existing training and
testing activities, new training and
testing activities to support future
requirements, and activities not
previously analyzed, such as pierside
sonar maintenance and testing.
Implementation of Alternative 1 will
enable the DoN to achieve the levels of
operational readiness required under
Section 5062 Title 10 U.S.C. without
resulting in significant environmental
impacts.
SUPPLEMENTARY INFORMATION: The
complete text of the Record of Decision
is available at https://nwtteis.com. Single
copies of the Record of Decision are
available upon request by contacting:
SUMMARY:
E:\FR\FM\04NON1.SGM
04NON1
Agencies
[Federal Register Volume 81, Number 214 (Friday, November 4, 2016)]
[Notices]
[Pages 76936-76937]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26699]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Intent To Prepare a Draft Environmental Impact Statement, and
Intent To Conduct Public Scoping Meetings for the Upper Susquehanna
River Basin Comprehensive Flood Damage Reduction Study, New York
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act
[[Page 76937]]
(NEPA), the Baltimore District, U.S. Army Corps of Engineers (USACE),
will prepare a Feasibility Report and EIS comprehensively evaluating
flood-risk management (FRM) needs and opportunities in the upper
Susquehanna River Basin in New York.
DATES: The public scoping meeting dates are:
1. November 21, 2016, at 1:30 p.m. and 6:30 p.m. in the Hubbard
Auditorium of the Tioga County Office Building.
2. November 22, 2016 at 1:30 p.m. and 6:30 p.m. at the Town of
Chenango Community Meeting Room.
3. November 30, 2016, at 6:30 p.m. in the Village of Sidney.
ADDRESSES: Two scoping meetings will be held in the Village of Owego on
Monday, November 21, 2016, at 1:30 p.m. and 6:30 p.m. in the Hubbard
Auditorium of the Tioga County Office Building, 56 Main Street. Two
scoping meetings will be held in the Town of Chenango on Tuesday,
November 22, 2016 at 1:30 p.m. and 6:30 p.m. at the Town of Chenango
Community Meeting Room at 1529 Upper Front Street (NY Route 12). One
meeting will be held on November 30, 2016, at 6:30 p.m. in the Village
of Sidney in the Memorial Public Library located at 8 River Street.
FOR FURTHER INFORMATION CONTACT: Questions about the proposed scoping
meetings, requests to be placed on the project information distribution
list, information requests or written comments on the scope of the EIS
and the comprehensive FRM study can be addressed to Mr. David W.
Robbins, U.S. Army Corps of Engineers, ATTN: CENAB-PL-P, 10 S. Howard
Street, Baltimore, MD 21201, telephone 410-962-0685; email address:
UpperSRBStudy@usace.army.mil. Please contact me if you wish to speak at
the meetings or should you have special needs (sign language
interpreters, access needs) at the above address. Information about the
study, including public scoping meetings, is available at the study Web
site https://www.nab.usace.army.mil/USRB_Feasibility_Study/.
SUPPLEMENTARY INFORMATION: This Notice initiates formal scoping for the
Environmental Impact Statement (EIS), provides information on the
nature of the proposed Project, invites participation in the EIS
process, and identifies potential environmental effects to be
considered. It also invites comments from interested members of the
public, tribes, and agencies on the scope of the EIS and announces
upcoming public scoping meetings. Comments should address (1) feasible
alternatives that may better achieve the Project's need and purposes
with fewer adverse impacts and (2) any significant environmental
impacts relating to the alternatives.
Scoping meeting information will be posted online by Baltimore
District via Web site postings and social media. Meeting information
will be provided electronically via the study's Web page and in printed
form to local libraries, government offices, as well as mailed to
interested public.
For all meetings, staff will be available to answer questions. All
interested parties are invited to speak at the public meetings. The
public scoping peiod will begin on the date of publication of this
Notice and will continue through 30 days following the last public
scoping meeting.
The study was authorized by a Resolution of the House Committee on
Transportation and Infrastructure, on 24 September, 2008. The upper
Susquehanna Basin includes the portions of Tioga, Broome, Chenango,
Cortland, Otsego, Delaware, Schoharie, Herkimer, Oneida, Madison,
Onondaga, Tompkins, Schuyler, and Chemung Counties in the Susquehanna
River Watershed of New York upstream of the Chemung River confluence
near Waverly. The upper Susquehanna River Basin repeatedly experiences
flooding damages, with recent notable events occurring in 2006 and
2011. USACE is undertaking the FRM study in partnership with the New
York State Department of Environmental Conservation (NYSDEC).
USACE and NYSDEC are seeking public input to identify areas with
flooding concerns which may be of interest to address in the context of
the study, and learn of area-specific considerations important in
formulating any FRM plans. Study efforts will be coordinated with the
Federal Emergency Management Area (FEMA), the U.S. Geological Survey
(USGS), as well as other Federal and state agencies and local
governments.
An initial conceptual effort will be completed using existing
information to identify areas of the basin that currently do not have
FRM infrastructure in place and screen these areas for FRM needs and
opportunities. The study will evaluate the level of FRM currently
provided by existing FRM infrastructure under current conditions and
projected future conditions. Within the study area, there are 20
existing USACE FRM projects, as well as other non-Federal FRM projects.
The study will investigate FRM strategies to reduce flood risk, as well
as reduce residual risk in areas with existing FRM infrastructure.
Structural and non-structural FRM will be considered. Hydrologic and
hydraulic modeling will be developed for the majority of the
Susquehanna River main stem and major tributaries in the basin to aid
plan formulation.
The study will be conducted in compliance with applicable federal
laws including the Clean Water Act, the Endangered Species Act, the
Clean Air Act, the U.S. Fish and Wildlife Coordination Act, the
National Historic Preservation Act, and the Farmland Protection Policy
Act. All appropriate compliance documentation will be obtained and
included as part of the EIS. It is currently anticipated that the study
will take three years and may lead to the implementation of one or more
FRM projects. The EIS is expected to be publicly released in Spring
2018.
David W. Robbins,
Acting Chief, Civil Project Development Branch, Planning Division.
[FR Doc. 2016-26699 Filed 11-3-16; 8:45 am]
BILLING CODE 3720-58-P