Department of Energy 2011 – Federal Register Recent Federal Regulation Documents
Results 401 - 450 of 2,494
Frequency Regulation Compensation in the Organized Wholesale Power Markets
Pursuant to section 206 of the Federal Power Act, the Commission is revising its regulations to remedy undue discrimination in the procurement of frequency regulation in the organized wholesale electric markets and ensure that providers of frequency regulation receive just and reasonable and not unduly discriminatory or preferential rates. Frequency regulation service is one of the tools regional transmission organizations (RTOs) and independent system operators (ISOs) use to balance supply and demand on the transmission system, maintaining reliable operations. In doing so, RTOs and ISOs deploy a variety of resources to meet frequency regulation needs; these resources differ in both their ramping ability, which is their ability to increase or decrease their provision of frequency regulation service, and the accuracy with which they can respond to the system operator's dispatch signal. The Commission finds that current frequency regulation compensation practices of RTOs and ISOs result in rates that are unjust, unreasonable, and unduly discriminatory or preferential. Specifically, current compensation methods for regulation service in RTO and ISO markets fail to acknowledge the inherently greater amount of frequency regulation service being provided by faster-ramping resources. In addition, certain practices of some RTOs and ISOs result in economically inefficient economic dispatch of frequency regulation resources. By remedying these issues, the Commission is removing unduly discriminatory and preferential practices from RTO and ISO tariffs and requiring the setting of just and reasonable rates. Specifically, this Final Rule requires RTOs and ISOs to compensate frequency regulation resources based on the actual service provided, including a capacity payment that includes the marginal unit's opportunity costs and a payment for performance that reflects the quantity of frequency regulation service provided by a resource when the resource is accurately following the dispatch signal.
Alternative Fuel Transportation Program; Alternative Fueled Vehicle Credit Program (Subpart F) Modification and Other Amendments
DOE today proposes a rule pursuant to the Energy Independence and Security Act of 2007 (EISA), that would revise the allocation of marketable credits under DOE's Alternative Fuel Transportation Program (AFTP or Program), by including EISA-specified electric drive vehicles and investments in qualified alternative fuel infrastructure, nonroad equipment, and relevant emerging technologies. DOE also is proposing modifications to the use of Program credits, revisions to the exemption process, clarifications of the Alternative Compliance option, and several technical and other amendments intended to make the Program regulations clearer.
Commission Information Collection Activities (FERC-549); Comment Request; Submitted for OMB Review
In compliance with the requirements of section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507, the Federal Energy Regulatory Commission (Commission or FERC) has submitted the information collection described below to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission issued a Notice in the Federal Register (76 FR 46783, 08/3/2011) requesting public comments. FERC received no comments on the FERC-549 and has made this notation in its submission to OMB.
Environmental Management Site-Specific Advisory Board, Idaho National Laboratory
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Privacy Act of 1974; Notice To Amend an Existing System of Records
As required by the Privacy Act of 1974, 5 U.S.C. 552a, and the Office of Management and Budget (OMB) Circular A-130, the Department of Energy (DOE) is publishing notice of a proposed amendment to an existing system of records. DOE proposes to amend the system of records DOE-43 ``Personnel Security Files.'' This notice will create a new routine use to permit the disclosure of certain information to federal agencies for studies and analyses in support of evaluating and improving the effectiveness and efficiency of the agencies' investigative and adjudicative methodologies.
Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement for Solar Energy Development in Six Southwestern States and Notice of Public Meetings
The Bureau of Land Management (BLM) and the Department of Energy (DOE) (the Agencies) as joint lead agencies announce the availability of the Supplement to the Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern States (Supplement) (BLM/DES 11-49, DOE/EIS-0403D-S).
Commission Information Collection Activities (FERC-1 and FERC-1F); Comment Request; Submitted for OMB Review
In compliance with the requirements of section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507, the Federal Energy Regulatory Commission (Commission or FERC) is submitting the information collections described below to the Office of Management and Budget (OMB) for review of the information collections requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission issued a Notice in the Federal Register (76 FR 46781, 10/3/2011) requesting public comments. FERC received one comment on the FERC-1 and the FERC-1F and has provided a response in this notice as well as in its submission to OMB.
Wind and Water Power Program
All programs with the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) are required to undertake rigorous, objective peer review of their funded projects in order to ensure and enhance the management, relevance, effectiveness, and productivity of those projects. The 2011 Wind and Water Power Program, Water Power Peer Review Meeting will review the Program's portfolio of conventional hydropower and marine and hydrokinetic research and development and projects. The 2011 Water Power Peer Review Meeting will be held November 1 through November 3, 2011 in Alexandria, VA.
Enhancement of Electricity Market Surveillance and Analysis Through Ongoing Electronic Delivery of Data From Regional Transmission Organizations and Independent System Operators
The Federal Energy Regulatory Commission (Commission) proposes to revise its regulations to require each regional transmission organization (RTO) and independent system operator (ISO) to electronically deliver to the Commission, on an ongoing basis, data related to the markets that it administers. Ongoing electronic delivery of data relating to physical and virtual offers and bids, market awards, resource outputs, marginal cost estimates, shift factors, financial transmission rights, internal bilateral contracts, and interchange pricing will facilitate the Commission's development and evaluation of its policies and regulations and will enhance Commission efforts to detect anti-competitive or manipulative behavior, or ineffective market rules, thereby helping to ensure just and reasonable rates.
Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards
Under section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) proposes to approve Reliability Standards PRC-006-1 (Automatic Underfrequency Load Shedding) and EOP- 003-2 (Load Shedding Plans), developed and submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC), the Electric Reliability Organization certified by the Commission. The proposed Reliability Standards establish design and documentation requirements for automatic underfrequency load shedding programs that arrest declining frequency and assist recovery of frequency following system events leading to frequency degradation. The Commission also proposes to approve the related Violation Risk Factors and Violation Severity Levels, implementation plan, and effective date proposed by NERC.
Transmission Planning Reliability Standards
Transmission Planning (TPL) Reliability Standards are intended to ensure that the transmission system is planned and designed to meet an appropriate and specific set of reliability criteria. Reliability Standard TPL-002-0a references a table which identifies different categories of contingencies and allowable system impacts in the planning process. The table includes a footnote regarding planned or controlled interruption of electric supply where a single contingency occurs on a transmission system. North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization, requests approval of a revision to the footnote. In this notice, the Commission proposes to remand NERC's proposed revision to the footnote.
Assistance to Foreign Atomic Energy Activities
On September 7, 2011, DOE published its proposal to amend its regulations concerning unclassified assistance to foreign atomic energy activities. Today, DOE announces its intention to hold one informational Webinar on the proposed amendment to the regulations. Additionally, by this notice DOE is extending by 30 days the deadline for public comment.
Environmental Management Site-Specific Advisory Board, Savannah River Site
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Decision and Order Amending Waivers Granted to Mitsubishi Electric & Electronics USA, Inc. From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
This notice publishes the U.S. Department of Energy's (DOE) Decision and Order in Case No. CAC-037, which amends the current waivers applicable to Mitsubishi's S&L Class and WR2 and WY Series products to require the use of Air-conditioning, Heating and Refrigeration Institute 1230 (AHRI) as the alternative test procedure.
Decision and Order Granting a Waiver to LG Electronics, Inc. From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
This notice publishes the U.S. Department of Energy's (DOE) Decision and Order in Case No. CAC-032, which grants LG Electronics, Inc. (LG) a waiver from the existing DOE test procedures applicable to commercial package air-source and water-source central air conditioners and heat pumps. The waiver is specific to the LG Multi V SYNC II and Multi V Water II variable refrigerant flow (VRF) multi-split commercial heat pumps. As a condition of this waiver, LG must use the alternate test procedure set forth in this notice to test and rate its Multi V SYNC II and Multi V Water II VRF multi-split commercial heat pumps.
RIN 1904-AC43
On September 14, 2011, DOE published a notice of public meeting and availability of the framework document on general service fluorescent lamps and incandescent reflector lamps energy conservation standards in the Federal Register. This notice announces that the period for submitting comments on the framework document is extended to November 28, 2011.
Energy Conservation Program: Test Procedures for Microwave Ovens
The U.S. Department of Energy (DOE) has initiated a test procedure rulemaking to develop active mode testing methodologies for residential microwave ovens. DOE specifically is seeking information, data, and comments regarding representative and repeatable methods for measuring the energy use of microwave-only ovens and combination microwave ovens, including: Food loads representative of consumer use; the repeatability of energy use measurements using different food loads; and consumer usage data on the hours of operation in active mode, standby mode, and off mode for the development of an integrated energy use metric.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.