Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings, 66924 [2011-27954]
Download as PDF
66924
Federal Register / Vol. 76, No. 209 / Friday, October 28, 2011 / Notices
www.ferc.gov under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may mail a paper copy of your
comments to the Commission at the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1A, Washington, DC 20426.
sroberts on DSK5SPTVN1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
Once DTI files its application with the
Commission, you may want to become
an ‘‘intervenor’’ which is an official
party to the Commission’s proceeding.
Intervenors play a more formal role in
the process and are able to file briefs,
appear at hearings, and be heard by the
courts if they choose to appeal the
Commission’s final ruling. An
intervenor formally participates in the
proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site. Please note that
the Commission will not accept requests
VerDate Mar<15>2010
16:56 Oct 27, 2011
Jkt 226001
for intervenor status at this time. You
must wait until a formal application for
the project is filed with the
Commission.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (https://www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
project docket number, excluding the
last three digits in the Docket Number
field (i.e., PF11–9). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: October 24, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–27952 Filed 10–27–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commissioner and Staff
Attendance at North American Electric
Reliability Corporation Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and/or
Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation, Member Representatives
Committee and Board of Trustees
Meetings.
Westin Buckhead Atlanta, 3391
Peachtree Road, NE., Atlanta, GA 30326.
PO 00000
Frm 00034
Fmt 4703
Sfmt 9990
November 2 (1 p.m.–5 p.m.) and 3
(8 a.m.–1 p.m.), 2011.
Further information regarding these
meetings may be found at: https://
www.nerc.com/calendar.php.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceedings:
Docket No. RC08–5, North American
Electric Reliability Corporation.
Docket No. RC11–1, North American
Electric Reliability Corporation.
Docket No. RC11–2, North American
Electric Reliability Corporation.
Docket No. RC11–5, North American
Electric Reliability Corporation.
Docket No. RC11–6, North American
Electric Reliability Corporation.
Docket No. RR08–4, North American
Electric Reliability Corporation.
Docket No. RR10–11, North American
Electric Reliability Corporation.
Docket No. RR11–1, North American
Electric Reliability Corporation.
Docket No. RR11–2, North American
Electric Reliability Corporation.
Docket No. RR11–3, North American
Electric Reliability Corporation.
Docket No. RR11–4, North American
Electric Reliability Corporation.
Docket No. RR11–5, North American
Electric Reliability Corporation.
Docket No. RR11–7, North American
Electric Reliability Corporation.
Docket No. RD09–11, North American
Electric Reliability Corporation.
Docket No. RD10–2, North American
Electric Reliability Corporation.
Docket No. RD11–3, North American
Electric Reliability Corporation.
Docket No. RD11–5, North American
Electric Reliability Corporation.
Docket No. RD11–8, North American
Electric Reliability Corporation.
Docket No. RD11–9, North American
Electric Reliability Corporation.
Docket No. RD11–10, North American
Electric Reliability Corporation.
Docket No. RD11–11, North American
Electric Reliability Corporation.
Docket No. NP10–160, North American
Electric Reliability Corporation.
Docket No. NP11–238, North American
Electric Reliability Corporation.
For further information, please
contact Jonathan First, (202) 502–8529,
or jonathan.first@ferc.gov.
Dated: October 24, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–27954 Filed 10–27–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 76, Number 209 (Friday, October 28, 2011)]
[Notices]
[Page 66924]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-27954]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commissioner and Staff Attendance at North American
Electric Reliability Corporation Meetings
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and/or Commission staff may attend the
following meetings:
North American Electric Reliability Corporation, Member
Representatives Committee and Board of Trustees Meetings.
Westin Buckhead Atlanta, 3391 Peachtree Road, NE., Atlanta, GA
30326.
November 2 (1 p.m.-5 p.m.) and 3 (8 a.m.-1 p.m.), 2011.
Further information regarding these meetings may be found at:
https://www.nerc.com/calendar.php.
The discussions at the meetings, which are open to the public, may
address matters at issue in the following Commission proceedings:
Docket No. RC08-5, North American Electric Reliability Corporation.
Docket No. RC11-1, North American Electric Reliability Corporation.
Docket No. RC11-2, North American Electric Reliability Corporation.
Docket No. RC11-5, North American Electric Reliability Corporation.
Docket No. RC11-6, North American Electric Reliability Corporation.
Docket No. RR08-4, North American Electric Reliability Corporation.
Docket No. RR10-11, North American Electric Reliability Corporation.
Docket No. RR11-1, North American Electric Reliability Corporation.
Docket No. RR11-2, North American Electric Reliability Corporation.
Docket No. RR11-3, North American Electric Reliability Corporation.
Docket No. RR11-4, North American Electric Reliability Corporation.
Docket No. RR11-5, North American Electric Reliability Corporation.
Docket No. RR11-7, North American Electric Reliability Corporation.
Docket No. RD09-11, North American Electric Reliability Corporation.
Docket No. RD10-2, North American Electric Reliability Corporation.
Docket No. RD11-3, North American Electric Reliability Corporation.
Docket No. RD11-5, North American Electric Reliability Corporation.
Docket No. RD11-8, North American Electric Reliability Corporation.
Docket No. RD11-9, North American Electric Reliability Corporation.
Docket No. RD11-10, North American Electric Reliability Corporation.
Docket No. RD11-11, North American Electric Reliability Corporation.
Docket No. NP10-160, North American Electric Reliability Corporation.
Docket No. NP11-238, North American Electric Reliability Corporation.
For further information, please contact Jonathan First, (202) 502-
8529, or jonathan.first@ferc.gov.
Dated: October 24, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-27954 Filed 10-27-11; 8:45 am]