Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process/Alternative Licensing Procedures; Raymond F. Ward, 66714 [2011-27832]

Download as PDF 66714 Federal Register / Vol. 76, No. 208 / Thursday, October 27, 2011 / Notices Act, and section 106 of the National Historic Preservation Act. m. Hydro Green filed Pre-Application Documents (PAD) for each proposed project, including a proposed process plan and schedule with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: October 21, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–27835 Filed 10–26–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9842–004] wreier-aviles on DSK7SPTVN1PROD with NOTICES Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process/ Alternative Licensing Procedures; Raymond F. Ward a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process Procedures. b. Project No.: 9842–004. c. Date Filed: August 31, 2011. d. Submitted By: Raymond F. Ward. e. Name of Project: Ward Mill Dam Project. f. Location: On the Watauga River, in Watauga County, North Carolina. The project does not occupy any federal lands. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Applicant Contact: Andrew C. Givens, Cardinal Energy service, Inc., 620 N. West St., Suite 103, Raleigh, NC VerDate Mar<15>2010 14:47 Oct 26, 2011 Jkt 226001 27603; (919) 834–0909; email— acgivens@cardinalenergy.com. i. FERC Contact: Michael Spencer at (202) 502–6093; or email at michael.spencer@ferc.gov. j. Raymond F. Ward filed his request to use the Traditional Licensing Process Procedures on August 31, 2011. Raymond F. Ward provided proof of the public notice of its request on October 6, 2011. In a letter dated October 21, 2011, the Director of the Division of Hydropower Licensing approved Raymond F. Ward’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR Part 402; (b) NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the North Carolina State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. Raymond F. Ward filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. m. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. n. The licensee states its unequivocal intent to submit an application for a new license for Project No. 9842. Pursuant to 18 CFR 16.8, 16.9, and 16.10, each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by August 31, 2014. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 For assistance, contact FERC Online Support. Dated: October 21, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–27832 Filed 10–26–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13234–002] City and Borough of Sitka, AK; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 1, 2011, and supplemented on October 17, 2011, the City and Borough of Sitka filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Takatz Lake Hydroelectric Project (Takatz Lake Project) to be located on Takatz Lake and Takatz Creek, about 21 miles east of the city of Sitka, Alaska, on the east side of Baranof Island. The sole purpose of a preliminary permit is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Takatz Lake Project would consist of the following new facilities: (1) A 200-foot-high by 250foot-long primary concrete dam that would raise the elevation of the existing lake; (2) a 63-foot-high by 100-foot-long secondary saddle dam; (3) an impoundment with a 740-acre surface area at a full pool elevation of 1,040 feet above mean sea level, with an active capacity of 82,400 acre feet; (4) a 2,800foot-long, 6.5-foot by 7-foot horseshoetunnel power conduit fed by a concrete intake structure or lake tap; (5) a 72inch-diameter 1,000-foot-long steel penstock; (6) a 120-foot-long by 80-footwide powerhouse containing two Francis-type generation units having a total installed capacity of 27.7 megawatts; (7) a 100-foot-long by 70foot-wide switchyard; (8) an about 26mile-long, 138-kilovolt transmission line that consists of underground and overhead segments, including an alternative for a submarine segment; (9) an about 3-mile-long access road; and (10) appurtenant facilities. The E:\FR\FM\27OCN1.SGM 27OCN1

Agencies

[Federal Register Volume 76, Number 208 (Thursday, October 27, 2011)]
[Notices]
[Page 66714]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-27832]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 9842-004]


Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing 
Process/Alternative Licensing Procedures; Raymond F. Ward

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process Procedures.
    b. Project No.: 9842-004.
    c. Date Filed: August 31, 2011.
    d. Submitted By: Raymond F. Ward.
    e. Name of Project: Ward Mill Dam Project.
    f. Location: On the Watauga River, in Watauga County, North 
Carolina. The project does not occupy any federal lands.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Applicant Contact: Andrew C. Givens, Cardinal Energy service, 
Inc., 620 N. West St., Suite 103, Raleigh, NC 27603; (919) 834-0909; 
email_acgivens@cardinalenergy.com.
    i. FERC Contact: Michael Spencer at (202) 502-6093; or email at 
michael.spencer@ferc.gov.
    j. Raymond F. Ward filed his request to use the Traditional 
Licensing Process Procedures on August 31, 2011. Raymond F. Ward 
provided proof of the public notice of its request on October 6, 2011. 
In a letter dated October 21, 2011, the Director of the Division of 
Hydropower Licensing approved Raymond F. Ward's request to use the 
Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service under section 7 of the 
Endangered Species Act and the joint agency regulations thereunder at 
50 CFR Part 402; (b) NOAA Fisheries under section 305(b) of the 
Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920; and (c) the North Carolina 
State Historic Preservation Officer, as required by section 106, 
National Historical Preservation Act, and the implementing regulations 
of the Advisory Council on Historic Preservation at 36 CFR 800.2.
    l. Raymond F. Ward filed a Pre-Application Document (PAD; including 
a proposed process plan and schedule) with the Commission, pursuant to 
18 CFR 5.6 of the Commission's regulations.
    m. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    n. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 9842. Pursuant to 18 CFR 
16.8, 16.9, and 16.10, each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by August 31, 
2014.
    o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: October 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-27832 Filed 10-26-11; 8:45 am]
BILLING CODE 6717-01-P