City of Broken Bow, OK; Notice of Availability of Final Environmental Assessment, 65717-65718 [2011-27425]
Download as PDF
65717
Federal Register / Vol. 76, No. 205 / Monday, October 24, 2011 / Notices
Docket No.
Bishop Hill Energy II LLC ..............................................................................................................................................................
CSOLAR IV South, LLC ................................................................................................................................................................
Gratiot County Wind LLC ..............................................................................................................................................................
Invenergy Wind Development Michigan LLC ................................................................................................................................
Trinity Hills Wind Farm LLC ..........................................................................................................................................................
High Plains Ranch II, LLC .............................................................................................................................................................
Double ‘‘C’’ Limited ........................................................................................................................................................................
High Sierra Limited ........................................................................................................................................................................
Kern Front Limited .........................................................................................................................................................................
Cogentrix of Alamosa, LLC ...........................................................................................................................................................
Hudson Ranch Power I LLC ..........................................................................................................................................................
TPW Petersburg, LLC ...................................................................................................................................................................
Take notice that during the month of
September 2011, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: October 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–27318 Filed 10–21–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2713–082–New York]
tkelley on DSK3SPTVN1PROD with NOTICES
Erie Boulevard Hydropower, L.P.;
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the multi-development
Oswegatchie River Hydroelectric
Project, located along a 90-mile stretch
of the Oswegatchie River in St.
Lawrence County, New York, and has
prepared an Environmental Assessment
(EA) for the project. The project does
not occupy any federal land.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
VerDate Mar<15>2010
15:34 Oct 21, 2011
Jkt 226001
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
For assistance, please contact FERC
Online Support. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For further information contact John
Baummer at (202) 502–6837.
Dated: October 18, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–27429 Filed 10–21–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
EG11–103–000
EG11–104–000
EG11–105–000
EG11–106–000
EG11–107–000
EG11–108–000
EG11–109–000
EG11–110–000
EG11–111–000
EG11–112–000
EG11–113–000
EG11–114–000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12470–001]
City of Broken Bow, OK; Notice of
Availability of Final Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for an Original Major License for the
Broken Bow Re-Regulation Dam
Hydropower Project (FERC Project No.
12470–001). The Broken Bow ReRegulation Dam Project is proposed to
be located on the Mountain Fork River
in McCurtain County, Oklahoma, at the
U.S. Army Corps of Engineers’ Broken
Bow Re-Regulation Dam. The project
would occupy a total of 8.21 acres of
federal lands administered by the Tulsa
District of the Corps and 2.32 acres of
federal lands within the Ouachita
National Forest.
Staff prepared a final environmental
assessment (EA), which analyzes the
potential environmental effects of
licensing the project, and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the final EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659.
E:\FR\FM\24OCN1.SGM
24OCN1
65718
Federal Register / Vol. 76, No. 205 / Monday, October 24, 2011 / Notices
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, please
contact Aaron Liberty at 202–502–6862,
or at aaron.liberty@ferc.gov.
Dated: October 18, 2011.
Kimberly D. Bose,
Secretary.
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 25, 2011.
Dated: October 18, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–27425 Filed 10–21–11; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2011–27427 Filed 10–21–11; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. EF11–14–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Western Area Power Administration;
Notice of Filing
Take notice that on September 23,
2011, Western Area Power
Administration submitted its Rate Order
No. WAPA–151 concerning rate and
repayment data for Network Integration
Transmission Service and Western Area
Lower Colorado Balancing Authority
Ancillary Services, for confirmation and
approval on a final basis, effective
October 1, 2011, and ending September
30, 2016.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
VerDate Mar<15>2010
15:34 Oct 21, 2011
Jkt 226001
Federal Energy Regulatory
Commission
[Docket No. ER12–60–000]
Tenaska Power Management, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Tenaska
Power Management, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 1,
2011.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 17, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–27317 Filed 10–21–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket No. ER12–85–000]
Owings Corning Sales, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Owings
Corning Sales, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 76, Number 205 (Monday, October 24, 2011)]
[Notices]
[Pages 65717-65718]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-27425]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12470-001]
City of Broken Bow, OK; Notice of Availability of Final
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission or FERC)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the application for an Original Major
License for the Broken Bow Re-Regulation Dam Hydropower Project (FERC
Project No. 12470-001). The Broken Bow Re-Regulation Dam Project is
proposed to be located on the Mountain Fork River in McCurtain County,
Oklahoma, at the U.S. Army Corps of Engineers' Broken Bow Re-Regulation
Dam. The project would occupy a total of 8.21 acres of federal lands
administered by the Tulsa District of the Corps and 2.32 acres of
federal lands within the Ouachita National Forest.
Staff prepared a final environmental assessment (EA), which
analyzes the potential environmental effects of licensing the project,
and concludes that licensing the project, with appropriate
environmental protective measures, would not constitute a major federal
action that would significantly affect the quality of the human
environment.
A copy of the final EA is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
at https://www.ferc.gov, using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
202-502-8659.
[[Page 65718]]
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
For further information, please contact Aaron Liberty at 202-502-
6862, or at aaron.liberty@ferc.gov.
Dated: October 18, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-27425 Filed 10-21-11; 8:45 am]
BILLING CODE 6717-01-P