Department of Energy October 28, 2008 – Federal Register Recent Federal Regulation Documents

Integrated System Rate Schedule Changes
Document Number: E8-25690
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Southwestern Power Administration
Due to the omission of the P-06A Rate Schedule from the Notice of Proposed Changes to Southwestern Power Administration Rate Schedules and Opportunity for Public Review and Comment published on October 20, 2008 (73 FR 62269), this notice is a resubmission to include both the P-06A and the NFTS-06A Rate Schedule proposals for review and comment. The Administrator, Southwestern Power Administration (Southwestern), has determined that revisions to the Real Power Losses provisions within existing rate schedules P-06 and NFTS-06 are required. Since the proposed rate schedule revisions are limited only to Real Power Losses, the net result of the 2006 Integrated System Power Repayment Studies, which was the basis for the existing rate schedules, will not be altered. Southwestern held several meetings during FY 2008 with customers to discuss the proposed rate schedule revisions and provide opportunity for input in the development of the final rate schedules. As a result of these informal meetings, it was determined that the revised rate schedule provisions can provide cost-savings and operational benefits to Southwestern's transmission customers and are consistent with Federal Energy Regulatory Commission (FERC) Order No. 888.
Sabine Pipe Line LLC; Notice of Request Under Blanket Authorization
Document Number: E8-25684
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Dixie Pipeline Company; Notice of Extension of Time for Technical Conference
Document Number: E8-25682
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Colorado Interstate Gas Company; Notice of Technical Conference
Document Number: E8-25681
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
California Independent System Operator Corporation; Notice of Technical Conference
Document Number: E8-25621
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
California Independent System Operator Corporation; Notice of Institution of Proceeding and Refund Effective Date
Document Number: E8-25620
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
MMP DeSoto Pipeline, L.P.; Notice of Petition for Declaratory Order
Document Number: E8-25619
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Atlas Pipeline Mid-Continent WestTex, LLC; Pioneer Natural Resources (USA), Inc.; Notice of Application
Document Number: E8-25618
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Southeast Gas Storage, LLC; Notice of Availability of Environmental Assessment
Document Number: E8-25615
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
MMP Desoto Pipeline, L.P.; Notice of Rate Election
Document Number: E8-25614
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Electronic Tariff Filings
Document Number: E8-25611
Type: Rule
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission published a document in the Federal Register on October 3, 2008 (73 FR 57515), revising Commission rules. That document inadvertently included two non- substantive errors in the instructions for the amendatory language. This document corrects those instructions.
Combined Notice of Filings
Document Number: E8-25605
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings, #1
Document Number: E8-25604
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Wholesale Competition in Regions With Organized Electric Markets
Document Number: E8-25246
Type: Rule
Date: 2008-10-28
Agency: Department of Energy, Federal Energy Regulatory Commission
In this Final Rule, the Federal Energy Regulatory Commission (Commission) is amending its regulations under the Federal Power Act to improve the operation of organized wholesale electric markets in the areas of: Demand response and market pricing during periods of operating reserve shortage; long-term power contracting; market- monitoring policies; and the responsiveness of regional transmission organizations (RTOs) and independent system operators (ISOs) to their customers and other stakeholders, and ultimately to the consumers who benefit from and pay for electricity services. Each RTO and ISO will be required to make certain filings that propose amendments to its tariff to comply with the requirements in each area, or that demonstrate that its existing tariff and market design already satisfy the requirements.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.