Sabine Pipe Line LLC; Notice of Request Under Blanket Authorization, 63956 [E8-25684]
Download as PDF
63956
Federal Register / Vol. 73, No. 209 / Tuesday, October 28, 2008 / Notices
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–25623 Filed 10–27–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–4–000]
Sabine Pipe Line LLC; Notice of
Request Under Blanket Authorization
ebenthall on PROD1PC60 with NOTICES
October 22, 2008.
Take notice that on October 8, 2008,
Sabine Pipe Line LLC (Sabine), 2400
Fournace Place, Bellaire, Texas 77401,
filed in Docket No. CP09–4–000, a prior
notice request pursuant to sections
157.205, 157.208, and 157.212 of the
Federal Energy Regulatory
Commission’s regulations under the
Natural Gas Act for authorization to
construct, own, and operate certain
facilities located at a proposed point of
interconnection between Sabine and
Kinder Morgan Louisiana Pipeline
Company LLC (KMLP) in Calcasieu
Parish, Louisiana, all as more fully set
forth in the application, which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, Sabine proposes to
design, construct, own, and operate all
of the facilities necessary to receive up
to 200 MMcf/d of revaporized liquefied
VerDate Aug<31>2005
15:28 Oct 27, 2008
Jkt 217001
natural gas (LNG) from the Cheniere
Sabine Pass LNG import terminal by
way of a 20-inch pipeline owned and
operated by KMLP. Sabine states that
these facilities proposed include a 16inch valve, 16-inch flanges, 16-inch
pipe and related fittings, miscellaneous
bolts, gaskets, over-pressure protection
valve(s)/device(s), electronic flow
measurement instrumentation, and all
necessary and related telemetry devices.
Sabine estimates the cost of
construction to be $293,000, with all
such costs to be reimbursed by KMLP.
Any questions regarding the
application should be directed to Jeffrey
L. Kirk, Chevron Pipe Line, 4800
Fournace Place, Bellaire, Texas 77401,
at (713) 432–6753.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–25684 Filed 10–27–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings, #1
October 21, 2008.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC09–7–000.
Applicants: Bank of America
Corporation, Bank of America, N.A.,
Merrill Lynch & Co., Inc., Merrill Lynch
Commodities, Inc.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
Description: Application of Bank of
America Corp, Bank of America, N.A. et
al. for authorization to sell securities
and request for expedited treatment.
Filed Date: 10/17/2008.
Accession Number: 20081020–0219.
Comment Date: 5 p.m. Eastern Time
on Friday, November 7, 2008.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER96–1361–013;
ER99–2781–011; ER98–4138–009;
ER00–1770–019; ER02–453–010; ER98–
3096–015; ER07–903–002; ER05–1054–
003; ER01–202–008; ER04–472–007.
Applicants: Atlantic City Electric
Company, Delmarva Power & Light
Company, Potomac Electric Power
Company, Conectiv Energy Supply, Inc.,
Conectiv Atlantic Generation, LLC,
Conectiv Delmarva Generation, LLC,
Conectiv Bethlehem LLC, Pepco Energy
Services, Inc., Bethlehem Renewable
Energy, LLC, Eastern Landfill Gas, LLC,
Potomac Power Resources, LLC,
Fauquier Landfill Gas, LLC.
Description: Atlantic City Electric Co
et al. amends the Market Based Rate
Tariffs submitted with their 4/8/08
filing and amends Appendix B–2 to the
Revised Updated Market Power Study to
conform to Order 697–A etc.
Filed Date: 10/14/2008.
Accession Number: 20081016–0217.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 4, 2008.
Docket Numbers: ER99–2156–016;
ER96–719–023; ER97–2801–024; ER07–
1236–003.
Applicants: Cordova Energy Company
LLC, MidAmerican Energy Company,
PacifiCorp, Yuma Cogeneration
Associates.
Description: Cordova Energy Co LLC
et al. submits a notice of change in
status.
Filed Date: 10/15/2008.
Accession Number: 20081017–0001.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 5, 2008.
Docket Numbers: ER06–1291–002;
ER07–565–001; ER07–566–001; ER07–
412–002.
Applicants: MT. Tom Generating
Company LLC, FirstLight Hydro
Generating Company, FirstLight Power
Resources Management, LLC, ECP
Energy I, LLC.
Description: Mt Tom Generation Co,
LLC et al. (FirstLight Sellers) submits
revised market-based rate tariff to
replace the tariffs that were filed on 6/
30/08 in connection with their Order
697 Updated Market Power Analysis.
Filed Date: 10/14/2008.
Accession Number: 20081016–0218.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 4, 2008.
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 73, Number 209 (Tuesday, October 28, 2008)]
[Notices]
[Page 63956]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-25684]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP09-4-000]
Sabine Pipe Line LLC; Notice of Request Under Blanket
Authorization
October 22, 2008.
Take notice that on October 8, 2008, Sabine Pipe Line LLC (Sabine),
2400 Fournace Place, Bellaire, Texas 77401, filed in Docket No. CP09-4-
000, a prior notice request pursuant to sections 157.205, 157.208, and
157.212 of the Federal Energy Regulatory Commission's regulations under
the Natural Gas Act for authorization to construct, own, and operate
certain facilities located at a proposed point of interconnection
between Sabine and Kinder Morgan Louisiana Pipeline Company LLC (KMLP)
in Calcasieu Parish, Louisiana, all as more fully set forth in the
application, which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Specifically, Sabine proposes to design, construct, own, and
operate all of the facilities necessary to receive up to 200 MMcf/d of
revaporized liquefied natural gas (LNG) from the Cheniere Sabine Pass
LNG import terminal by way of a 20-inch pipeline owned and operated by
KMLP. Sabine states that these facilities proposed include a 16-inch
valve, 16-inch flanges, 16-inch pipe and related fittings,
miscellaneous bolts, gaskets, over-pressure protection valve(s)/
device(s), electronic flow measurement instrumentation, and all
necessary and related telemetry devices. Sabine estimates the cost of
construction to be $293,000, with all such costs to be reimbursed by
KMLP.
Any questions regarding the application should be directed to
Jeffrey L. Kirk, Chevron Pipe Line, 4800 Fournace Place, Bellaire,
Texas 77401, at (713) 432-6753.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-25684 Filed 10-27-08; 8:45 am]
BILLING CODE 6717-01-P