Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 63955-63956 [E8-25623]

Download as PDF ebenthall on PROD1PC60 with NOTICES Federal Register / Vol. 73, No. 209 / Tuesday, October 28, 2008 / Notices However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Aug<31>2005 15:28 Oct 27, 2008 Jkt 217001 Comment Date: November 4, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–25618 Filed 10–27–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2413–109] Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests October 21, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 2413–109. c. Date Filed: August 14, 2008. d. Applicant: Georgia Power Company. e. Name of Project: Wallace Dam Project. f. Location: The proposal would be located at The Ritz-Carlton and Gabby Restaurant facilities, 6 miles south of the Georgia Highway 44 bridge as it crosses Richland Creek, on the Richland Creek section of Lake Oconee, in Greene County, Georgia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Mr. Lee Glenn, Lake Resources Manager, 125 Wallace Dam Road NE, Eatonton, GA 31024, (706) 485–8704. i. FERC Contact: Rebecca Martin at 202–502–6012, or e-mail rebecca.martin@ferc.gov. j. Deadline for filing comments and or motions: November 21, 2008. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P–2413–109) on any comments or motions filed. The Commission’s Rules of Practice require all interveners filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 63955 motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Georgia Power Company filed an application seeking Commission approval to permit Linger Longer Development Company, in conjunction with The Ritz-Carlton and Gabby Restaurant facilities, to construct an additional 10-slip group dock and re-locate an existing 4-slip dock on Lake Oconee. The docks are to be used by guests of The Ritz-Carlton and Gabby Restaurant. The expansion of current dock facilities would include relocating 900.68 square feet of decking, constructing 1,238.78 square feet of decking, and constructing 162.35 square feet of boardwalk. The proposed impacted shoreline is estimated at 322.66 linear feet. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO E:\FR\FM\28OCN1.SGM 28OCN1 63956 Federal Register / Vol. 73, No. 209 / Tuesday, October 28, 2008 / Notices INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Kimberly D. Bose, Secretary. [FR Doc. E8–25623 Filed 10–27–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–4–000] Sabine Pipe Line LLC; Notice of Request Under Blanket Authorization ebenthall on PROD1PC60 with NOTICES October 22, 2008. Take notice that on October 8, 2008, Sabine Pipe Line LLC (Sabine), 2400 Fournace Place, Bellaire, Texas 77401, filed in Docket No. CP09–4–000, a prior notice request pursuant to sections 157.205, 157.208, and 157.212 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act for authorization to construct, own, and operate certain facilities located at a proposed point of interconnection between Sabine and Kinder Morgan Louisiana Pipeline Company LLC (KMLP) in Calcasieu Parish, Louisiana, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Specifically, Sabine proposes to design, construct, own, and operate all of the facilities necessary to receive up to 200 MMcf/d of revaporized liquefied VerDate Aug<31>2005 15:28 Oct 27, 2008 Jkt 217001 natural gas (LNG) from the Cheniere Sabine Pass LNG import terminal by way of a 20-inch pipeline owned and operated by KMLP. Sabine states that these facilities proposed include a 16inch valve, 16-inch flanges, 16-inch pipe and related fittings, miscellaneous bolts, gaskets, over-pressure protection valve(s)/device(s), electronic flow measurement instrumentation, and all necessary and related telemetry devices. Sabine estimates the cost of construction to be $293,000, with all such costs to be reimbursed by KMLP. Any questions regarding the application should be directed to Jeffrey L. Kirk, Chevron Pipe Line, 4800 Fournace Place, Bellaire, Texas 77401, at (713) 432–6753. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E8–25684 Filed 10–27–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings, #1 October 21, 2008. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC09–7–000. Applicants: Bank of America Corporation, Bank of America, N.A., Merrill Lynch & Co., Inc., Merrill Lynch Commodities, Inc. PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 Description: Application of Bank of America Corp, Bank of America, N.A. et al. for authorization to sell securities and request for expedited treatment. Filed Date: 10/17/2008. Accession Number: 20081020–0219. Comment Date: 5 p.m. Eastern Time on Friday, November 7, 2008. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER96–1361–013; ER99–2781–011; ER98–4138–009; ER00–1770–019; ER02–453–010; ER98– 3096–015; ER07–903–002; ER05–1054– 003; ER01–202–008; ER04–472–007. Applicants: Atlantic City Electric Company, Delmarva Power & Light Company, Potomac Electric Power Company, Conectiv Energy Supply, Inc., Conectiv Atlantic Generation, LLC, Conectiv Delmarva Generation, LLC, Conectiv Bethlehem LLC, Pepco Energy Services, Inc., Bethlehem Renewable Energy, LLC, Eastern Landfill Gas, LLC, Potomac Power Resources, LLC, Fauquier Landfill Gas, LLC. Description: Atlantic City Electric Co et al. amends the Market Based Rate Tariffs submitted with their 4/8/08 filing and amends Appendix B–2 to the Revised Updated Market Power Study to conform to Order 697–A etc. Filed Date: 10/14/2008. Accession Number: 20081016–0217. Comment Date: 5 p.m. Eastern Time on Tuesday, November 4, 2008. Docket Numbers: ER99–2156–016; ER96–719–023; ER97–2801–024; ER07– 1236–003. Applicants: Cordova Energy Company LLC, MidAmerican Energy Company, PacifiCorp, Yuma Cogeneration Associates. Description: Cordova Energy Co LLC et al. submits a notice of change in status. Filed Date: 10/15/2008. Accession Number: 20081017–0001. Comment Date: 5 p.m. Eastern Time on Wednesday, November 5, 2008. Docket Numbers: ER06–1291–002; ER07–565–001; ER07–566–001; ER07– 412–002. Applicants: MT. Tom Generating Company LLC, FirstLight Hydro Generating Company, FirstLight Power Resources Management, LLC, ECP Energy I, LLC. Description: Mt Tom Generation Co, LLC et al. (FirstLight Sellers) submits revised market-based rate tariff to replace the tariffs that were filed on 6/ 30/08 in connection with their Order 697 Updated Market Power Analysis. Filed Date: 10/14/2008. Accession Number: 20081016–0218. Comment Date: 5 p.m. Eastern Time on Tuesday, November 4, 2008. E:\FR\FM\28OCN1.SGM 28OCN1

Agencies

[Federal Register Volume 73, Number 209 (Tuesday, October 28, 2008)]
[Notices]
[Pages 63955-63956]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-25623]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2413-109]


Georgia Power Company; Notice of Application for Amendment of 
License and Soliciting Comments, Motions To Intervene, and Protests

October 21, 2008.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No: 2413-109.
    c. Date Filed: August 14, 2008.
    d. Applicant: Georgia Power Company.
    e. Name of Project: Wallace Dam Project.
    f. Location: The proposal would be located at The Ritz-Carlton and 
Gabby Restaurant facilities, 6 miles south of the Georgia Highway 44 
bridge as it crosses Richland Creek, on the Richland Creek section of 
Lake Oconee, in Greene County, Georgia.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Lee Glenn, Lake Resources Manager, 125 
Wallace Dam Road NE, Eatonton, GA 31024, (706) 485-8704.
    i. FERC Contact: Rebecca Martin at 202-502-6012, or e-mail 
rebecca.martin@ferc.gov.
    j. Deadline for filing comments and or motions: November 21, 2008.
    All documents (original and eight copies) should be filed with: 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. Please include the project number (P-2413-109) on 
any comments or motions filed.
    The Commission's Rules of Practice require all interveners filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervener files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency. A copy of any motion to intervene must also be 
served upon each representative of the Applicant specified in the 
particular application.
    k. Description of Request: Georgia Power Company filed an 
application seeking Commission approval to permit Linger Longer 
Development Company, in conjunction with The Ritz-Carlton and Gabby 
Restaurant facilities, to construct an additional 10-slip group dock 
and re-locate an existing 4-slip dock on Lake Oconee. The docks are to 
be used by guests of The Ritz-Carlton and Gabby Restaurant. The 
expansion of current dock facilities would include relocating 900.68 
square feet of decking, constructing 1,238.78 square feet of decking, 
and constructing 162.35 square feet of boardwalk. The proposed impacted 
shoreline is estimated at 322.66 linear feet.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3372 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Any filings must bear in all capital letters the title 
``COMMENTS'', ``PROTEST'', or ``MOTION TO

[[Page 63956]]

INTERVENE'', as applicable, and the Project Number of the particular 
application to which the filing refers.
    p. Agency Comments: Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-25623 Filed 10-27-08; 8:45 am]
BILLING CODE 6717-01-P