Transcontinental Gas Pipe Line Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Mobile Bay South Expansion Project and Request for Comments on Environmental Issues, 63964-63966 [E8-25617]

Download as PDF ebenthall on PROD1PC60 with NOTICES 63964 Federal Register / Vol. 73, No. 209 / Tuesday, October 28, 2008 / Notices • A new electrical substation; and • The New Hamilton Meter Station and interconnect. The purpose of this project is to provide 24.7 billion cubic feet of working gas capacity to customers in the region by converting a nearly depleted oil and gas reservoir into a highdeliverability natural gas storage facility located approximately 3.5 miles northwest of Caledonia in Monroe and Lowndes Counties, Mississippi. The EA has been placed in the public files of the FERC. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502–8371. Copies of the EA have been mailed to Federal, State, and local agencies, interested individuals, affected landowners, newspapers, libraries, and parties to this proceeding. Any person wishing to comment on the EA may do so. To ensure consideration prior to a Commission decision on the proposal, it is important that we receive your comments before the date specified below. You can make a difference by providing us with your specific comments or concerns about the Project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send in your comments so that they will be received in Washington, DC on or before November 21, 2008. For your convenience, there are three methods in which you can use to submit your comments to the Commission. In all instances please reference the project docket number CP08–418–000 with your submission. The Commission encourages electronic filing of comments and has dedicated eFiling expert staff available to assist you at 202–502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the Quick Comment feature, which is located on the Commission’s Internet Web site at https://www.ferc.gov under the link to Documents and Filings. A Quick Comment is an easy method for interested persons to submit text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Internet Web site at https://www.ferc.gov under the link to VerDate Aug<31>2005 15:28 Oct 27, 2008 Jkt 217001 Documents and Filings. eFiling involves preparing your submission in the same manner as you would if filing on paper, and then saving the file on your computer’s hard drive. You will attach that file as your submission. New eFiling users must first create an account by clicking on ‘‘Sign up’’ or ‘‘eRegister’’. You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing;’’ or (3) You may file your comments via mail to the Commission by sending an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426. Label one copy of the comments for the attention of Gas Branch 2, PJ11.2. Comments will be considered by the Commission but will not serve to make the commentor a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214).1 Only intervenors have the right to seek rehearing of the Commission’s decision. Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your comments considered. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of 1 Interventions may also be filed electronically via the Internet in lieu of paper. See the previous discussion on filing comments electronically. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https://www.ferc.gov/ esubscribenow.htm. Kimberly D. Bose, Secretary. [FR Doc. E8–25615 Filed 10–27–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP08–476–000] Transcontinental Gas Pipe Line Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Mobile Bay South Expansion Project and Request for Comments on Environmental Issues October 21, 2008. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the construction and operation of facilities proposed by Transcontinental Gas Pipe Line Corporation (Transco) in Choctaw County, Alabama. This notice announces the opening of the scoping process we will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine which issues need to be evaluated in the EA. Please note that the scoping period will close on November 20, 2008. This notice is being sent to affected landowners; federal, state, and local government representatives and agencies; environmental and public interest groups; Native American tribes; other interested parties in this proceeding; and local libraries and newspapers. We encourage government representatives to notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a pipeline company representative about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The pipeline company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail E:\FR\FM\28OCN1.SGM 28OCN1 Federal Register / Vol. 73, No. 209 / Tuesday, October 28, 2008 / Notices to produce an agreement, the pipeline company could initiate condemnation proceedings in accordance with state law. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ was attached to the project notice Transco provided to landowners. This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is available for viewing on the FERC Internet Web site (https:// www.ferc.gov). Summary of the Proposed Project The proposed Mobile Bay South Expansion Project would involve the construction and operation of Compressor Station 85, a new 9,470 horsepower (hp) compressor station to be located at the interconnection of the Mobile Bay Lateral and Transco’s main line in Choctaw County, Alabama. Specifically, the Project will include all necessary piping, auxiliary systems, and appurtenant facilities, including: • Two 4,735 hp Caterpillar 3636; internal combustion engine-driven compressor units; • Approximately 2,400 feet of 30-inch diameter piping extending from Transco’s mainline to the compressor station and from the compressor station to the Mobile Bay Lateral; and • Station yard piping and appurtenances. Construction of the project facilities would enable Transco to provide firm transportation service from Compressor Station 85 and interconnects with party pipelines at Station 85 southward to delivery points located on the Mobile Bay Lateral. The location of the project facilities is shown in Appendix 1.1 Nonjurisdictional Facilities ebenthall on PROD1PC60 with NOTICES Non-jurisdictional facilities associated with this project would include electrical service provided to the compressor station from the local utility, Black Warrior Electrical Membership Cooperative. A water pipeline would also be constructed by North Choctaw Water to supply water to the station. 1 The appendices referenced in this notice are not being printed in the Federal Register. Copies of all appendices, other than Appendix 1 (maps), are available on the Commission’s website at the ‘‘eLibrary’’ link or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary refer to the last page of this notice. Copies of the appendices were sent to all those receiving this notice in the mail. VerDate Aug<31>2005 15:28 Oct 27, 2008 Jkt 217001 63965 Land Requirements for Construction Transco would purchase a 126.8-acre parcel of land to site the facilities. Construction of the proposed facilities would require about 32.9 acres of land including aboveground facilities, outlet pipeline, and access roads. Following construction, about 10 acres would be used for operation of the project’s facilities. The remaining 22.9 acres of land would be restored within the existing compressor station property or allowed to revert to former use along the pipeline right-of-way. and local agencies, public interest groups, interested individuals, affected landowners, newspapers, libraries, and the Commission’s official service list for this proceeding. A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the public participation section below. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice of Intent, the Commission staff requests public comments on the scope of the issues to address in the EA. All comments received are considered during the preparation of the EA. State and local government representatives are encouraged to notify their constituents of this proposed action and encourage them to comment on their areas of concern. In the EA we 2 will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils. • Land use. • Water resources, fisheries, and wetlands. • Cultural resources. • Vegetation and wildlife. • Air quality and noise. • Endangered and threatened species. • Hazardous waste. • Public safety. We will also evaluate possible alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Our independent analysis of the issues will be in the EA. Depending on the comments received during the scoping process, the EA may be published and mailed to federal, state, Currently Identified Environmental Issues We have already identified several issues that we think deserve attention based on a preliminary review of the proposed facilities and the environmental information provided by Transco. This preliminary list of issues may be changed based on your comments and our analysis. • Cultural resources may be affected by the project. • The project may have air emissions and noise impacts. • The new compressor station may have visual impacts on the surrounding area. • The federally listed gopher tortoise habitat may be affected. 2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental staff of the Office of Energy Projects (OEP). PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Public Participation You can make a difference by providing us with your specific comments or concerns about the Mobile Bay South Expansion Project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send in your comments so that they will be received in Washington, DC on or before November 20, 2008. For your convenience, there are three methods in which you can use to submit your comments to the Commission. In all instances please reference the project docket number CP08–476–000 with your submission. The docket number can be found on the front of this notice. The Commission encourages electronic filing of comments and has dedicated eFiling expert staff available to assist you at 202–502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the Quick Comment feature, which is located on the Commission’s internet Web site at https://www.ferc.gov under the link to Documents and Filings. A Quick E:\FR\FM\28OCN1.SGM 28OCN1 63966 Federal Register / Vol. 73, No. 209 / Tuesday, October 28, 2008 / Notices Comment is an easy method for interested persons to submit text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Internet Web site at https://www.ferc.gov under the link to Documents and Filings. eFiling involves preparing your submission in the same manner as you would if filing on paper, and then saving the file on your computer’s hard drive. You will attach that file as your submission. New eFiling users must first create an account by clicking on ‘‘Sign up’’ or ‘‘eRegister.’’ You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing;’’ or (3) You may file your comments via mail to the Commission by sending an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426. Label one copy of the comments for the attention of Gas Branch 2, PJ11.2. ebenthall on PROD1PC60 with NOTICES Environmental Mailing List An effort is being made to send this notice to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who are potential right-ofway grantors, whose property may be used temporarily for project purposes, or who own homes within distances defined in the Commission’s regulations of certain aboveground facilities. By this notice we are also asking governmental agencies, especially those in Appendix 2, to express their interest in becoming cooperating agencies for the preparation of the EA. If you do not want to send comments at this time but still want to remain on our mailing list, please return the Information Request (Appendix 3). If you do not return the Information Request, you will be taken off the mailing list. Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an official party to the proceeding known as an ‘‘intervenor.’’ Intervenors play a more formal role in the process. Among other things, intervenors have the right to receive copies of case-related Commission documents and filings by other intervenors. Likewise, each intervenor must send one electronic copy (using the Commission’s eFiling system) or 14 paper copies of its filings to the VerDate Aug<31>2005 15:28 Oct 27, 2008 Jkt 217001 Secretary of the Commission and must send a copy of its filings to all other parties on the Commission’s service list for this proceeding. If you want to become an intervenor you must file a motion to intervene according to Rule 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.214). Only intervenors have the right to seek rehearing of the Commission’s decision. The Notice of Application for this proposed project issued on September 29, 2008 identified the date for the filing of interventions as October 20, 2008. However, affected landowners and parties with environmental concerns may be granted late intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your environmental comments considered. Availability of Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208-FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202)502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. E8–25617 Filed 10–27–08; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ08–5–001] United States Department of Energy, Bonneville Power Administration, Transmission Service Terms and Conditions; Notice of Filing October 21, 2008. Take notice that on October 15, 2008, Bonneville Power Administration filed certain attachments to Attachment K to its Open Access Transmission Tariff in response to the Commission’s July 17, 2008 Order and request for declaratory order accepting their proposed Attachment K as revised and finding that the Commission’s standards for reciprocity, pursuant to 18 CFR 35.28(e) and 18 CFR 385.207. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\28OCN1.SGM 28OCN1

Agencies

[Federal Register Volume 73, Number 209 (Tuesday, October 28, 2008)]
[Notices]
[Pages 63964-63966]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-25617]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP08-476-000]


Transcontinental Gas Pipe Line Corporation; Notice of Intent To 
Prepare an Environmental Assessment for the Proposed Mobile Bay South 
Expansion Project and Request for Comments on Environmental Issues

October 21, 2008.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the construction and operation of 
facilities proposed by Transcontinental Gas Pipe Line Corporation 
(Transco) in Choctaw County, Alabama.
    This notice announces the opening of the scoping process we will 
use to gather input from the public and interested agencies on the 
project. Your input will help the Commission staff determine which 
issues need to be evaluated in the EA. Please note that the scoping 
period will close on November 20, 2008.
    This notice is being sent to affected landowners; federal, state, 
and local government representatives and agencies; environmental and 
public interest groups; Native American tribes; other interested 
parties in this proceeding; and local libraries and newspapers. We 
encourage government representatives to notify their constituents of 
this planned project and encourage them to comment on their areas of 
concern.
    If you are a landowner receiving this notice, you may be contacted 
by a pipeline company representative about the acquisition of an 
easement to construct, operate, and maintain the proposed facilities. 
The pipeline company would seek to negotiate a mutually acceptable 
agreement. However, if the project is approved by the Commission, that 
approval conveys with it the right of eminent domain. Therefore, if 
easement negotiations fail

[[Page 63965]]

to produce an agreement, the pipeline company could initiate 
condemnation proceedings in accordance with state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' was attached to the 
project notice Transco provided to landowners. This fact sheet 
addresses a number of typically asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings. 
It is available for viewing on the FERC Internet Web site (https://
www.ferc.gov).

Summary of the Proposed Project

    The proposed Mobile Bay South Expansion Project would involve the 
construction and operation of Compressor Station 85, a new 9,470 
horsepower (hp) compressor station to be located at the interconnection 
of the Mobile Bay Lateral and Transco's main line in Choctaw County, 
Alabama. Specifically, the Project will include all necessary piping, 
auxiliary systems, and appurtenant facilities, including:
     Two 4,735 hp Caterpillar 3636; internal combustion engine-
driven compressor units;
     Approximately 2,400 feet of 30-inch diameter piping 
extending from Transco's mainline to the compressor station and from 
the compressor station to the Mobile Bay Lateral; and
     Station yard piping and appurtenances.
    Construction of the project facilities would enable Transco to 
provide firm transportation service from Compressor Station 85 and 
interconnects with party pipelines at Station 85 southward to delivery 
points located on the Mobile Bay Lateral.
    The location of the project facilities is shown in Appendix 1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of all appendices, other 
than Appendix 1 (maps), are available on the Commission's website at 
the ``eLibrary'' link or from the Commission's Public Reference 
Room, 888 First Street, NE., Washington, DC 20426, or call (202) 
502-8371. For instructions on connecting to eLibrary refer to the 
last page of this notice. Copies of the appendices were sent to all 
those receiving this notice in the mail.
---------------------------------------------------------------------------

Nonjurisdictional Facilities

    Non-jurisdictional facilities associated with this project would 
include electrical service provided to the compressor station from the 
local utility, Black Warrior Electrical Membership Cooperative. A water 
pipeline would also be constructed by North Choctaw Water to supply 
water to the station.

Land Requirements for Construction

    Transco would purchase a 126.8-acre parcel of land to site the 
facilities. Construction of the proposed facilities would require about 
32.9 acres of land including aboveground facilities, outlet pipeline, 
and access roads. Following construction, about 10 acres would be used 
for operation of the project's facilities. The remaining 22.9 acres of 
land would be restored within the existing compressor station property 
or allowed to revert to former use along the pipeline right-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
to discover and address concerns the public may have about proposals. 
This process is referred to as ``scoping.'' The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this Notice of Intent, the Commission staff 
requests public comments on the scope of the issues to address in the 
EA. All comments received are considered during the preparation of the 
EA. State and local government representatives are encouraged to notify 
their constituents of this proposed action and encourage them to 
comment on their areas of concern.
    In the EA we \2\ will discuss impacts that could occur as a result 
of the construction and operation of the proposed project under these 
general headings:
---------------------------------------------------------------------------

    \2\ ``We'', ``us'', and ``our'' refer to the environmental staff 
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------

     Geology and soils.
     Land use.
     Water resources, fisheries, and wetlands.
     Cultural resources.
     Vegetation and wildlife.
     Air quality and noise.
     Endangered and threatened species.
     Hazardous waste.
     Public safety.
    We will also evaluate possible alternatives to the proposed project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Our independent analysis of the issues will be in the EA. Depending 
on the comments received during the scoping process, the EA may be 
published and mailed to federal, state, and local agencies, public 
interest groups, interested individuals, affected landowners, 
newspapers, libraries, and the Commission's official service list for 
this proceeding. A comment period will be allotted for review if the EA 
is published. We will consider all comments on the EA before we make 
our recommendations to the Commission.
    To ensure your comments are considered, please carefully follow the 
instructions in the public participation section below.

Currently Identified Environmental Issues

    We have already identified several issues that we think deserve 
attention based on a preliminary review of the proposed facilities and 
the environmental information provided by Transco. This preliminary 
list of issues may be changed based on your comments and our analysis.
     Cultural resources may be affected by the project.
     The project may have air emissions and noise impacts.
     The new compressor station may have visual impacts on the 
surrounding area.
     The federally listed gopher tortoise habitat may be 
affected.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the Mobile Bay South Expansion Project. Your 
comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. The more specific your comments, the more useful they will be. 
To ensure that your comments are timely and properly recorded, please 
send in your comments so that they will be received in Washington, DC 
on or before November 20, 2008.
    For your convenience, there are three methods in which you can use 
to submit your comments to the Commission. In all instances please 
reference the project docket number CP08-476-000 with your submission. 
The docket number can be found on the front of this notice. The 
Commission encourages electronic filing of comments and has dedicated 
eFiling expert staff available to assist you at 202-502-8258 or 
efiling@ferc.gov.
    (1) You may file your comments electronically by using the Quick 
Comment feature, which is located on the Commission's internet Web site 
at https://www.ferc.gov under the link to Documents and Filings. A Quick

[[Page 63966]]

Comment is an easy method for interested persons to submit text-only 
comments on a project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's Internet Web site at 
https://www.ferc.gov under the link to Documents and Filings. eFiling 
involves preparing your submission in the same manner as you would if 
filing on paper, and then saving the file on your computer's hard 
drive. You will attach that file as your submission. New eFiling users 
must first create an account by clicking on ``Sign up'' or 
``eRegister.'' You will be asked to select the type of filing you are 
making. A comment on a particular project is considered a ``Comment on 
a Filing;'' or
    (3) You may file your comments via mail to the Commission by 
sending an original and two copies of your letter to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First St., NE., 
Room 1A, Washington, DC 20426.
    Label one copy of the comments for the attention of Gas Branch 2, 
PJ11.2.

Environmental Mailing List

    An effort is being made to send this notice to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project. This includes all landowners who are 
potential right-of-way grantors, whose property may be used temporarily 
for project purposes, or who own homes within distances defined in the 
Commission's regulations of certain aboveground facilities. By this 
notice we are also asking governmental agencies, especially those in 
Appendix 2, to express their interest in becoming cooperating agencies 
for the preparation of the EA.
    If you do not want to send comments at this time but still want to 
remain on our mailing list, please return the Information Request 
(Appendix 3). If you do not return the Information Request, you will be 
taken off the mailing list.

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an official party to the proceeding known as an 
``intervenor.'' Intervenors play a more formal role in the process. 
Among other things, intervenors have the right to receive copies of 
case-related Commission documents and filings by other intervenors. 
Likewise, each intervenor must send one electronic copy (using the 
Commission's eFiling system) or 14 paper copies of its filings to the 
Secretary of the Commission and must send a copy of its filings to all 
other parties on the Commission's service list for this proceeding.
    If you want to become an intervenor you must file a motion to 
intervene according to Rule 214 of the Commission's Rules of Practice 
and Procedure (18 CFR 385.214). Only intervenors have the right to seek 
rehearing of the Commission's decision.
    The Notice of Application for this proposed project issued on 
September 29, 2008 identified the date for the filing of interventions 
as October 20, 2008. However, affected landowners and parties with 
environmental concerns may be granted late intervenor status upon 
showing good cause by stating that they have a clear and direct 
interest in this proceeding which would not be adequately represented 
by any other parties. You do not need intervenor status to have your 
environmental comments considered.

Availability of Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. 
Click on the eLibrary link, click on ``General Search'' and enter the 
docket number excluding the last three digits in the Docket Number 
field. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202)502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-25617 Filed 10-27-08; 8:45 am]
BILLING CODE 6717-01-P