2011 – Federal Register Recent Federal Regulation Documents
Results 8,651 - 8,700 of 33,060
Approval and Promulgation of Implementation Plans; Oregon: New Source Review/Prevention of Significant Deterioration Rule Revisions and Air Quality Permit Streamlining Rule Revisions
EPA is proposing to approve a portion of the State Implementation Plan (SIP) revision submitted by the State of Oregon for the purpose of addressing the third element of the interstate transport provisions of Clean Air Act (CAA or the Act) section 110(a)(2)(D)(i)(II) for the 1997 8-hour ozone National Ambient Air Quality Standards (NAAQS or standards) and the 1997 and 2006 fine particulate matter (PM2.5) NAAQS. The third element of CAA section 110(a)(2)(D)(i)(II) requires that a State not interfere with any other State's required measures to prevent significant deterioration (PSD) of its air quality. EPA is also proposing to approve numerous revisions to the Oregon SIP that were submitted to EPA by the State of Oregon on October 8, 2008; October 10, 2008; March 17, 2009; June 23, 2010; December 22, 2010 and May 5, 2011. The revisions include updating Oregon's new source review (NSR) rules to be consistent with current Federal regulations and streamlining Oregon's air quality rules by clarifying requirements, removing duplicative rules, and correcting errors. The revisions were submitted in accordance with the requirements of section 110 and part D of the Act).
Public Land Order No. 7783; Extension of Withdrawal Created by Subtitle A of Public Law 104-201; CO
This order extends the duration of a withdrawal created by Subtitle A of Public Law 104-201 for an additional 15-year period. Subtitle A of Public Law 104-201 withdrew 3,133 acres of public lands and 11,415 acres of Federally owned minerals at the Fort Carson Military Reservation, and 2,517 acres of public lands and approximately 130,139 acres of Federally owned minerals at the Pi[ntilde]on Canyon Maneuver Site from all forms of appropriation under the public land laws, including the mining laws, mineral and geothermal leasing laws, and mineral materials disposal laws, and reserved the lands for use by the Army for military maneuvering, training and weapons firing, and other consistent defense-related purposes as specified in the Act. The withdrawal extension is necessary to continue protection and use of the lands for military readiness purposes.
Approval and Promulgation of Air Quality Implementation Plans; Delaware; Amendments to the Control of Volatile Organic Compound Emissions From Offset Lithographic Printing and Letterpress Printing
EPA is proposing to approve a State Implementation Plan (SIP) revision submitted by the State of Delaware. This SIP revision amends the control of volatile organic compound (VOC) emissions from offset lithographic printing and letterpress printing. This action is being taken under the Clean Air Act (CAA).
Agency Information Collection Activities; Renewal of a Currently Approved Collection; Comment Request; Prohibition on Funding of Unlawful Internet Gambling
The Agencies are soliciting comments concerning the currently approved recordkeeping requirements associated with a joint rule, which is being renewed without change, implementing the Unlawful Internet Gambling Enforcement Act of 2006 (the ``Act''). This notice is published jointly by the Agencies as part of their continuing effort to reduce paperwork and respondent burden. The public and other Federal agencies are invited to take this opportunity to comment on this information collection, as required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)).
Approval and Promulgation of Air Quality Implementation Plans; Delaware; Adhesives and Sealants Rule
EPA is proposing to approve State Implementation Plan (SIP) revision submitted by the State of Delaware. The SIP revision adds section 4.0, under Regulation 1141, relating to the control of emissions of volatile organic compounds (VOC) from the manufacture, sale, use, or application of adhesives, sealants, primers, and solvents. This action is being taken under the Clean Air Act (CAA).
Pesticide Experimental Use Permit; Receipt of Application; Comment Request
This notice announces EPA's receipt of an application 100-EUP- RRL from Syngenta Crop Protection, LLC requesting an experimental use permit (EUP) for the acibenzolar S-methyl. The Agency has determined that the permit may be of regional and national significance. Therefore, in accordance with 40 CFR 172.11(a), the Agency is soliciting comments on this application.
Revision to the Section 8 Management Assessment Program Lease-Up Indicator
This proposed rule would amend HUD's regulations for the Section 8 Management Assessment program (SEMAP) to revise the process by which HUD measures and verifies performance under the SEMAP lease-up indicator. Specifically, HUD proposes to amend the existing regulation to reflect that assessment of a public housing agency's (PHA) leasing indicator will be based on a calendar year cycle, rather than a fiscal year cycle, which would increase administrative efficiencies for PHAs. This proposed rule would also clarify that units assisted under the voucher homeownership option or occupied under a project-based housing assistance (HAP) contract are included in the assessment of PHA units leased.
Submission for OMB Review; Comment Request; NINR End-of-Life and Palliative Care Science Needs Assessment: Funding Source (Survey of Authors)
Under the provisions of Section 3507(a)(1)(D) of the Paperwork Reduction Act of 1995, the National Institute of Nursing (NINR), the National Institutes of Health (NIH) has submitted to the Office of Management and Budget (OMB) a request for review and approval of the information collection listed below. This information collection was previously published in the Federal Register on June 16, 2011, page 35221 and allowed 60 days for public comment. No public comments were received. The purpose of this notice is to allow an additional 30 days for public comment. 5 CFR 1320.5 (General requirements) Reporting and Recordkeeping Requirements: Final Rule requires that the agency inform the potential persons who are to respond to the collection of information that such persons are not required to respond to the collection of information unless it displays a currently valid OMB control number. This information is required to be stated in the 30-day Federal Register Notice. Proposed Collection: Title: NINR End-of-Life and Palliative Care Science Needs Assessment: Funding Source (Survey of Authors). Type of Information Collection Request: NEW. Need and Use of Information Collection: The NINR End-of-Life Science Palliative Care (EOL PC) Needs Assessment: Funding Source Questionnaire will obtain information on funding sources of EOL PC research published studies for which a funding source is not cited or the information is unclear. Target participants are authors of publicly-available EOL PC research studies published between 1997-2010 for whom a funding source is unknown or unclear. The questionnaire inquires about the funding source of the published study, type of funding received, year of funding, and duration of funded study. This is a 7-item questionnaire that takes approximately 5 minutes to complete. Data collected is part of a needs assessment to address the breadth and depth of EOL PC scientific issues for use in stimulating research capacity in the field. Frequency of Response: One time. Affected Public: Individual authors of publicly available EOL PC research publications who do not list a funding source or the source is unclear within their publication. Type of Respondents: EOL PC researchers. The annual reporting burden is as follows: Estimated Number of Respondents: 1840; Estimated Number of Responses per Respondent: 1; Average Burden Hours Per Response: .08; and Estimated Total Annual Burden Hours Requested: 147. There are no Capital Costs, Operating or Maintenance Costs to report. Request for comments: Written comments and/or suggestions from the public and affected agencies should address one or more of the following points: (1) Whether the proposed collection of information is necessary for the proper performance of the function of the agency, including whether the information will have practical utility; (2) The accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) Ways to enhance the quality, utility, and clarity of the information to be collected; and (4) Ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology. Direct comments to OMB: Written comments and/or suggestions regarding the item(s) contained in this notice, especially regarding the estimated public burden and associated response time, should be directed to the: Office of Management and Budget, Office of Regulatory Affairs, OIRA_submission@omb.eop.gov or by fax to 202-395-6974, Attention: Desk Officer for NIH. To request more information on the proposed project or to obtain a copy of the data collection plans and instruments, contact: Dr. Amanda Greene, Office of Science Policy and Public Liaison, NINR, NIH, Democracy One, 6701 Democracy Blvd., Suite 710, Bethesda, MD 20892 or call non-toll-free number (301) 496-9601 or E-mail your request, including your address to: amanda.greene@nih.gov. Comments due date: Comments regarding this information collection are best assured of having their full effect if received within 30-days of the date of this publication.
Notice of Availability of the Record of Decision for the Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and the Final General Conformity Determination for the Newhall Ranch Resource Management and Development Plan, Santa Clarita, CA
The U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) has made a Final General Conformity Determination (GCD) and executed a Record of Decision (ROD) for the Final Environmental Impact Statement/Environmental Impact Report (EIS/ EIR) and a Section 404 Permit under the Clean Water Act for the Newhall Ranch Resource Management and Development Plan, Santa Clarita, California. This Notice serves as the Public Notice/Notice of Availability for the Final EIS/EIR ROD and the Final GCD. The Record of Decision for the Final EIS/EIR was signed on 31 August 2011. In June 2010, the Corps, in coordination with the California Department of Fish and Game (CDFG), completed and published a joint Final EIS/EIR and Draft GCD, pursuant to National Environmental Policy Act (NEPA) and section 176(c) of the Clean Air Act. The identified least environmentally damaging practicable alternative (LEDPA) in the ROD includes permanent impacts to 47.9 acres of waters of the United States, including 5.1 acres of wetlands, associated with discharges of fill material for bank protection to protect land development projects along water courses (including buried soil cement, buried gunite, grouted riprap, ungrouted riprap, and gunite lining); drainage facilities such as storm drains or outlets and partially lined open channels; grade control structures; bridges and drainage crossings; building pads; and water quality control facilities (sedimentation control, flood control, debris, and water quality basins). The LEDPA also includes temporary impacts to 35.3 acres of waters of the United States, including 11.8 acres of wetlands, associated with the construction of bank protection to protect land development projects along water courses (including buried soil cement, buried gunite, grouted riprap, ungrouted riprap, and gunite lining); utility crossings; activities associated with construction of a Water Reclamation Plant adjacent to the Santa Clara River and required bank protection; water quality control facilities (sedimentation control, flood debris, and water quality basins); regular and ongoing maintenance of all flood, drainage, and water quality protection structures and facilities on the RMDP site (such activities would include periodic inspection of structures and monitoring of vegetation growth and sediment buildup to ensure that the integrity of the structures is maintained and that planned conveyance capacity is present, routine repairs and maintenance of bridges and bank protection, and emergency maintenance activities); and temporary haul routes for grading equipment and geotechnical survey activities. As a Federal agency, the Corps prepared the Final GCD in compliance with Section 176(c) of the Clean Air Act and for the issuance of a Corps Section 404 Permit for the discharges of fill material into waters of the United States. Direct and indirect air emissions for all pollutants related to the Federal action are not below specified de minimis Federal thresholds (40 CFR 93.153(b)). On 31 August 2011, the Corps completed its environmental review and finalized the GCD, executed the ROD, and issued a provisional Section 404 Standard Individual Permit for the LEDPA. The Corps considered and responded to all comments received in finalizing the EIS/EIR, Final GCD, ROD, and issuing the provisional permit. The public can request copies of the Final General Conformity Determination document or the ROD from the Corps at the address listed below. In addition, copies of the Final General Conformity Determination document are available for review during the next 30 days at the following libraries: County of Los Angeles Newhall Branch, Castaic Branch, Sylmar Branch, Valencia Branch, and the County of Ventura Fillmore Branch.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for Proposed Marine Terminal Development at Pier S and Back Channel Navigational Safety Improvements in the Port of Long Beach, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Long Beach, has completed a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/DEIR) for the Pier S Marine Terminal and Back Channel Improvement Project, encompassing approximately 210 acres of land and water. The development of Pier S and Back Channel improvements would result in an approximately 160-acre marine container terminal, and would include the following elements: Property acquisition; dredging, wharf construction, other waterside improvements, and container cranes; container yard and associated structures; terminal buildings and other structures; truck gates, associated structures, and roadwork; intermodal rail yard, structures, and dual rail lead; and utility and oil facility relocation. Construction duration is estimated at 22 months. The Port of Long Beach requires authorization pursuant to Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act, to implement various regulated activities in and over waters of the U.S. associated with developing Pier S. Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as Lead Agency for the preparation of an Environmental Impact Report (EIR) for its consideration of development approvals within its jurisdiction. The Corps and the Port have agreed to jointly prepare a DEIS/DEIR in order to optimize efficiency and avoid duplication. The DEIS/DEIR is intended to be sufficient in scope to address federal, state, and local requirements and environmental issues concerning the proposed activities and permit approvals.
Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Snapper-Grouper Fishery of the South Atlantic; Closure
NMFS closes the commercial sector for vermilion snapper in the exclusive economic zone (EEZ) of the South Atlantic. This closure is necessary to protect the vermilion snapper resource.
Energy Conservation Program: Compliance Certification for Electric Motors
This final rule provides a new means for manufacturers of electric motors and their private labelers to prepare and submit Compliance Certification information to the Department of Energy (DOE or the ``Department'') through an electronic Web-based tool, the Compliance and Certification Management System (CCMS). The CCMS is the preferred mechanism for submitting Compliance Certification information for electric motors covered under the Energy Policy and Conservation Act (EPCA), as amended. This rule is also being issued to correct the sample Compliance Certification form currently located in Appendix C to Subpart B of 10 CFR Part 431 to be consistent with the Energy Independence and Security Act of 2007 (EISA 2007) energy conservation standards. Additionally, this rule updates the address and contact information used to submit Compliance Certification information through certified mail to DOE.
Fisheries of the Exclusive Economic Zone Off Alaska; Shallow-Water Species by Vessels Using Trawl Gear in the Gulf of Alaska
NMFS is opening directed fishing for shallow-water species by vessels using trawl gear in the Gulf of Alaska (GOA). This action is necessary to fully use the fourth seasonal apportionment of the 2011 Pacific halibut bycatch allowance specified for the trawl shallow-water species fishery in of the GOA.
Bureau of Economic Analysis Advisory Committee
Pursuant to the Federal Advisory Committee Act (Pub. L. 92-463 as amended by Pub. L. 94-409, Pub. L. 96-523, Pub. L. 97-375 and Pub. L. 105-153), we are announcing a meeting of the Bureau of Economic Analysis Advisory Committee. The meeting will address ways in which the national economic accounts can be presented more effectively for current economic analysis and recent statistical developments in national accounting.
Medicare and Medicaid Programs; Approval of the Joint Commission's Continued Deeming Authority for Critical Access Hospitals
This notice announces our decision to approve the Joint Commission for continued recognition as a national accreditation program for critical access hospitals (CAHs) seeking to participate in the Medicare or Medicaid programs.
Minerals Management: Adjustment of Cost Recovery Fees
This final rule amends the Bureau of Land Management (BLM) mineral resources regulations to update some fees that cover the BLM's cost of processing certain documents relating to its minerals programs and some filing fees for mineral-related documents. These updated fees include those for actions such as lease renewals and mineral patent adjudications.
Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement
In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) has prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the South Coast Planning Area (California), and by this notice is announcing the opening of the comment period.
Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1
The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim change to the MFTURP No. 1. The interim change updates Section A.II.D.6 to align the safety requirements for transportation protective service (TPS) carriers with the Department of Transportation's (DOT) Federal Motor Carrier Safety Administration (FMCSA) scoring system.
NASA Advisory Council; Science Committee; Astrophysics Subcommittee; Meeting
In accordance with the Federal Advisory Committee Act, Public Law 92-463, as amended, the National Aeronautics and Space Administration (NASA) announces a meeting of the Astrophysics Subcommittee of the NASA Advisory Council (NAC). This Subcommittee reports to the Science Committee of the NAC. The Meeting will be held for the purpose of soliciting from the scientific community and other persons scientific and technical information relevant to program planning.
Federal Salary Council; Meeting
The Federal Salary Council will meet on November 4, 2011, at the time and location shown below. The Council is an advisory body composed of representatives of Federal employee organizations and experts in the fields of labor relations and pay policy. The Council makes recommendations to the President's Pay Agent (the Secretary of Labor and the Directors of the Office of Management and Budget and the Office of Personnel Management) about the locality pay program for General Schedule employees under section 5304 of title 5, United States Code. The Council's recommendations cover the establishment or modification of locality pay areas, the coverage of salary surveys, the process of comparing Federal and non-Federal rates of pay, and the level of comparability payments that should be paid. The Council will hear public testimony about the locality pay program, review the results of pay comparisons, and formulate its recommendations to the President's Pay Agent on pay comparison methods, locality pay rates, and locality pay areas and boundaries for 2013. The meeting is open to the public. Please contact the Office of Personnel Management at the address shown below if you wish to submit testimony or present material to the Council at the meeting.
Notice of Availability of a Draft Environmental Impact Statement in Cooperation With the North Carolina Department of Transportation for Improvements to the US 17 and Market Street (US 17 Business) Corridor in Northern New Hanover and Southern Pender Counties, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division is issuing this notice to advise the public that a State of North Carolina funded Draft Environmental Impact Statement (DEIS) has been prepared describing proposed improvements to the transportation system starting at Military Cutoff Road in New Hanover County to north of Hampstead along US 17, Pender County, NC (TIP Projects U-4751 and R-3300).
Notice of Intent To Prepare a Draft Environmental Impact Statement for the Puyallup River General Investigation Study, Pierce County, WA
The Seattle District, U.S. Army Corps of Engineers (USACE) will prepare a Draft Environmental Impact Statement (DEIS) pursuant to Section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, for a proposed flood-risk management project in the Puyallup River Basin including the Puyallup River downstream of Electron Dam to Commencement Bay, the Carbon River and the White River downstream of Mud Mountain Dam. This study was requested by Pierce County (the local sponsor), Washington, because of the potential for significant flooding within the Puyallup River Basin. A DEIS is being prepared because of the potential for impacts on environmental resources, particularly salmonid habitat, and the intense public interest already demonstrated in addressing the flooding problems of the Puyallup, Carbon and White Rivers. The Puyallup River General Investigation (GI) DEIS for the Puyallup River Basin is being conducted under the authority of Section 209 of the Flood Control Act of 1962, Public Law 87-874. That section authorized a comprehensive study of Puget Sound, Washington, and adjacent waters including tributaries, in the interest of flood control, navigation, and other water uses and related land resources.
Agency Information Collection Activities; Submission for OMB Emergency Review: Comment Request, Guam Military Base Realignment Contractors Recruitment Standards
The U.S. Department of Labor (DOL) has submitted the Employment and Training Administration (ETA) sponsored information collection request (ICR) titled, ``Guam Military Base Realignment Contractors Recruitment Standards,'' to the Office of Management and Budget (OMB) for review and clearance utilizing emergency review procedures in accordance with the Paperwork Reduction Act of 1995 (Pub. L. 104-13, 44 U.S.C. chapter 35) and 5 CFR 1320.13. OMB approval has been requested by October 19, 2011.
Standard for the Flammability of Mattresses and Mattress Pads; Technical Amendment
The Consumer Product Safety Commission (``CPSC,'' ``Commission,'' or ``we'') is amending its standard for the flammability of mattresses and mattress pads to revise the ignition source specification in that standard.\1\ The ignition source cigarette specified for use in the mattress standard's performance tests is no longer produced. The Commission is requiring a standard reference material cigarette, which was developed by the National Institute of Standards and Technology, as the ignition source for testing to the mattress standard.
Agency Information Collection Activities; Submission for OMB Review; Comment Request; Attestation by Employers Using Crewmembers for Longshore Activities at Locations in the State of Alaska
The Department of Labor (DOL) is submitting the Employment and Training Administration (ETA) sponsored information collection request (ICR) titled, ``Attestation by Employers Using Crewmembers for Longshore Activities at Locations in the State of Alaska,'' (Form ETA- 933A) to the Office of Management and Budget (OMB) for review and approval for continued use in accordance with the Paperwork Reduction Act (PRA) of 1995 (Pub. L. 104-13, 44 U.S.C. chapter 35).
Standard Format and Content of License Applications for Conventional Uranium Mills
On May 30, 2008 (73 FR 31152), the U.S. Nuclear Regulatory Commission (NRC) published for public comment a notice of issuance and availability of Draft Regulatory Guide (DG)-3024, ``Standard Format and Content of License Applications for Conventional Uranium Mills.'' DG- 3024 was a proposed Revision 2 of Regulatory Guide (RG) 3.5. However, upon further consideration the NRC has decided not to revise RG 3.5 at this time. For this reason, DG-3024 will be withdrawn. The comment period closed on August 4, 2008, and 6 comments were received. The comments received will be considered and incorporated as appropriate if the NRC decides to revise RG 3.5 in the future.
Agency Information Collection Activities; Submission for OMB Review; Comment Request; Federal Employees Compensation Act Medical Report Forms, Claim for Compensation
The Department of Labor (DOL) is submitting the Office of Workers' Compensation Programs (OWCP) sponsored information collection request (ICR) titled, ``Federal Employees Compensation Act Medical Report Forms, Claim for Compensation,'' as revised, to the Office of Management and Budget (OMB) for review and approval for use in accordance with the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501 et seq.).
Changes To Implement the Prioritized Examination Track (Track I) of the Enhanced Examination Timing Control Procedures Under the Leahy-Smith America Invents Act
On April 4, 2011, the United States Patent and Trademark Office (Office) published a final rule that revised the rules of practice in patent cases to implement a procedure under which applicants may request prioritized examination at the time of filing of an application upon payment of appropriate fees and compliance with certain requirements (Track I final rule). The prioritized examination procedure is the first track (Track I) of a 3-Track examination process designed to provide applicants with greater control over when their utility and plant applications are examined and to promote greater efficiency in the patent examination process. The Office subsequently published a final rule on April 29, 2011, indicating that the effective date of the Track I final rule was delayed until further notice due to funding limitations. The Leahy-Smith America Invents Act includes provisions for prioritized examination that emulate the requirements of the Office's Track I final rule, with revised fee amounts for prioritized examination (including a small entity discount) and a provision that addresses the funding limitations that required a delay in the implementation of the Track I final rule. This final rule implements the prioritized examination provisions of section 11(h) of the Leahy-Smith America Invents Act.
Request for Comments on Establishment of a One-Year Retention Period for Trademark-Related Papers That Have Been Scanned Into the Trademark Initial Capture Registration System
The United States Patent and Trademark Office (``USPTO'') is considering establishing a retention period of one year for trademark- related documents submitted on paper that are subsequently scanned into the Trademark Initial Capture Registration System (``TICRS''). TICRS is available to the public through the Trademark Document Retrieval (``TDR'') database on the USPTO Web site. After the expiration of the one-year retention period, the USPTO would dispose of the paper documents unless, within sufficient time prior to disposal, the relevant trademark applicant or owner files a request to correct the electronic record in TICRS, and the request remains outstanding at the time disposal would otherwise have occurred. Specifically, the proposed one-year retention period begins on: September 26, 2011, for papers scanned into TICRS prior to September 26, 2011; or a paper's submission date, for papers scanned into TICRS on or after September 26, 2011. The proposal would reduce the costs currently associated with indefinitely warehousing paper documents, while permitting sufficient time for the review and rarely needed correction of the scanning of such paper documents.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.