Environmental Impacts Statements; Notice of Availability, 59125 [2011-24504]

Download as PDF Federal Register / Vol. 76, No. 185 / Friday, September 23, 2011 / Notices updated plan and the MOU or other binding agreement between the LEA and the State. A State may establish more specific requirements for LEA use of funds provided they are consistent with the ARRA, with the proposed requirements of this notice, and with the Race to the Top requirements. (See the notice of final priorities, requirements, definitions, and selection criteria for the Race to the Top Fund published in the Federal Register on November 18, 2009 (74 FR 59688).) Accessible Format: Individuals with disabilities can obtain this document in an accessible format (e.g., braille, large print, audiotape, or computer diskette) on request to the program contact person listed under FOR FURTHER INFORMATION CONTACT. Electronic Access to This Document: The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal Register is available via the Federal Digital System at https://www.gpo.gov/fdsys. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document Format (PDF). To use PDF you must have Adobe Acrobat Reader, which is available free at this site. You may also access documents of the Department published in the Federal Register by using the article search feature at https:// www.federalregister.gov. Specifically, through the advanced search feature at this site, you can limit your search to documents published by the Department. Dated: September 21, 2011. Arne Duncan, Secretary of Education. [FR Doc. 2011–24624 Filed 9–21–11; 4:15 pm] BILLING CODE 4000–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8999–2] sroberts on DSK5SPTVN1PROD with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements. Filed 09/12/2011 Through 09/16/2011 Pursuant to 40 CFR 1506.9. VerDate Mar<15>2010 16:41 Sep 22, 2011 Jkt 223001 Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EIS are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20110315, Final EIS, USFS, MN, South Fowl Lake Snowmobile Access Project, Proposing a Replacement Snowmobile Trail between McFarland Lake and South Fowl Lake, Gunflint Ranger District, Superior National Forest, Eastern Region, Cook County, MN, Review Period Ends: 10/24/2011, Contact: Peter Taylor 218–626–4368. EIS No. 20110316, Draft EIS, USACE, CA, Pier S Marine Terminal Development and Back Channel Navigational Safety Improvements, Construction and Operation, U.S. Army COE Section 10 and 404 Permit and Section 103 of the Marine Protection Research and Sanctuaries Act, Los Angeles County, CA, Comment Period Ends: 11/07/2011, Contact: John W. Markham 805–585– 2150. EIS No. 20110317, Draft EIS, USFS, MT, Lonesome Wood Vegetation Management 2 Project Areas, Proposed Forest Thinning, Prescribed Burning and Associated Activities, Habgen Lake Ranger District, Gallatin National Forest, Gallatin County, MT, Comment Period Ends: 11/07/2011, Contact: Teri Seth 406–522–2539. EIS No. 20110318, Final EIS, BLM, AZ, Ironwood Forest National Monument, Resource Management Plan, Implementation, Tucson Field Office, AZ, Review Period Ends: 10/24/2011, Contact: Laura Olais 520–258–7242. EIS No. 20110319, Draft Supplement, NOAA, CA, Southwest Fisheries Science Center (SWFSC), Demolition, Soil Stabilization and Seismic Improvement in La Jolla, CA, Comment Period Ends: 11/07/2011, Contact: William F. Broglie 206–526– 4837. EIS No. 20110320, Final EIS, NOAA, CA, ADOPTION—Bair Island Restoration and Management Plan, Tidal Action Restoration, Don Edwards San Francisco Bay National Wildlife Refuge, Bair Island State Ecological Reserve, South San Francisco Bay, San Mateo County, CA, Review Period Ends: 10/24/2011, Contact: Patricia A. Montanio 301– 427–8618. U.S. DOC has adopted the DOI, SFW’S FEIS #20060314, filed 07/ 24/2006. DOC was not a Cooperating Agency for the above FEIS; recirculation of the document is necessary under 40 CFR 1506.3(b). PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 59125 EIS No. 20110321, Draft EIS, BLM, CA, South Coast Resource Management Plan Revision, Implementation, San Diego, Riverside, San Bernardino, Orange and Los Angeles Counties, CA, Comment Period Ends: 12/21/ 2011, Contact: Greg Hill 760–833– 7140. EIS No. 20110322, Draft EIS, USACE, NC, NC–1409 (Military Cutoff Road) Extension and Proposed US 17 Hampstead Bypass, New Hanover and Pender Counties, NC, Comment Period Ends: 11/15/2011, Contact: Brad Shaver 910–251–4611. EIS No. 20110323, Draft Supplement, USFS, MI, Huron-Manistee National Forests, Supplement the 2006 FEIS Analysis and to Correct the Deficiencies that the Meister Panel Identified, Land and Resource Management Plan, Implementation, Several Counties, MI, Comment Period Ends: 12/21/2011, Contact: Ken Abrogate 231–775–2421. EIS No. 20110324, Final EIS, FHWA, 00, Interstate 5 Columbia River Crossing Project, Bridge, Transit, and Highway Improvements, from State Route 500 in Vancouver, WA to Columbia Boulevard in Portland, OR, Funding, U.S. COE Section 10 & 404 Permits, NPDES Permit, Review Period Ends: 10/24/2011, Contact: James Saxon 206–220–4311. Amended Notices EIS No. 20110257, Draft EIS, FRA, CA, California High-Speed Train (HST): Merced to Fresno Section High-Speed Train, Propose to Construct, Operate, and Maintain an Electric-Powered High-Speed Train (HST), Merced, Madera and Fresno Counties, CA, Comment Period Ends: 10/13/2011, Contact: David Valenstein 202–493– 6868. Revision to FR Notice Published: Extending Comment Period from 09/28/2011 to 10/13/ 2011. Dated: September 20, 2011. Cliff Rader, Acting Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2011–24504 Filed 9–22–11; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9470–8] 2011 Fall Meeting of the Ozone Transport Commission AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of meeting. E:\FR\FM\23SEN1.SGM 23SEN1

Agencies

[Federal Register Volume 76, Number 185 (Friday, September 23, 2011)]
[Notices]
[Page 59125]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-24504]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8999-2]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements.
Filed 09/12/2011 Through 09/16/2011
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20110315, Final EIS, USFS, MN, South Fowl Lake Snowmobile 
Access Project, Proposing a Replacement Snowmobile Trail between 
McFarland Lake and South Fowl Lake, Gunflint Ranger District, Superior 
National Forest, Eastern Region, Cook County, MN, Review Period Ends: 
10/24/2011, Contact: Peter Taylor 218-626-4368.
EIS No. 20110316, Draft EIS, USACE, CA, Pier S Marine Terminal 
Development and Back Channel Navigational Safety Improvements, 
Construction and Operation, U.S. Army COE Section 10 and 404 Permit and 
Section 103 of the Marine Protection Research and Sanctuaries Act, Los 
Angeles County, CA, Comment Period Ends: 11/07/2011, Contact: John W. 
Markham 805-585-2150.
EIS No. 20110317, Draft EIS, USFS, MT, Lonesome Wood Vegetation 
Management 2 Project Areas, Proposed Forest Thinning, Prescribed 
Burning and Associated Activities, Habgen Lake Ranger District, 
Gallatin National Forest, Gallatin County, MT, Comment Period Ends: 11/
07/2011, Contact: Teri Seth 406-522-2539.
EIS No. 20110318, Final EIS, BLM, AZ, Ironwood Forest National 
Monument, Resource Management Plan, Implementation, Tucson Field 
Office, AZ, Review Period Ends: 10/24/2011, Contact: Laura Olais 520-
258-7242.
EIS No. 20110319, Draft Supplement, NOAA, CA, Southwest Fisheries 
Science Center (SWFSC), Demolition, Soil Stabilization and Seismic 
Improvement in La Jolla, CA, Comment Period Ends: 11/07/2011, Contact: 
William F. Broglie 206-526-4837.
EIS No. 20110320, Final EIS, NOAA, CA, ADOPTION--Bair Island 
Restoration and Management Plan, Tidal Action Restoration, Don Edwards 
San Francisco Bay National Wildlife Refuge, Bair Island State 
Ecological Reserve, South San Francisco Bay, San Mateo County, CA, 
Review Period Ends: 10/24/2011, Contact: Patricia A. Montanio 301-427-
8618. U.S. DOC has adopted the DOI, SFW'S FEIS 20060314, filed 
07/24/2006. DOC was not a Cooperating Agency for the above FEIS; 
recirculation of the document is necessary under 40 CFR 1506.3(b).
EIS No. 20110321, Draft EIS, BLM, CA, South Coast Resource Management 
Plan Revision, Implementation, San Diego, Riverside, San Bernardino, 
Orange and Los Angeles Counties, CA, Comment Period Ends: 12/21/2011, 
Contact: Greg Hill 760-833-7140.
EIS No. 20110322, Draft EIS, USACE, NC, NC-1409 (Military Cutoff Road) 
Extension and Proposed US 17 Hampstead Bypass, New Hanover and Pender 
Counties, NC, Comment Period Ends: 11/15/2011, Contact: Brad Shaver 
910-251-4611.
EIS No. 20110323, Draft Supplement, USFS, MI, Huron-Manistee National 
Forests, Supplement the 2006 FEIS Analysis and to Correct the 
Deficiencies that the Meister Panel Identified, Land and Resource 
Management Plan, Implementation, Several Counties, MI, Comment Period 
Ends: 12/21/2011, Contact: Ken Abrogate 231-775-2421.
EIS No. 20110324, Final EIS, FHWA, 00, Interstate 5 Columbia River 
Crossing Project, Bridge, Transit, and Highway Improvements, from State 
Route 500 in Vancouver, WA to Columbia Boulevard in Portland, OR, 
Funding, U.S. COE Section 10 & 404 Permits, NPDES Permit, Review Period 
Ends: 10/24/2011, Contact: James Saxon 206-220-4311.

Amended Notices

EIS No. 20110257, Draft EIS, FRA, CA, California High-Speed Train 
(HST): Merced to Fresno Section High-Speed Train, Propose to Construct, 
Operate, and Maintain an Electric-Powered High-Speed Train (HST), 
Merced, Madera and Fresno Counties, CA, Comment Period Ends: 10/13/
2011, Contact: David Valenstein 202-493-6868. Revision to FR Notice 
Published: Extending Comment Period from 09/28/2011 to 10/13/2011.

    Dated: September 20, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2011-24504 Filed 9-22-11; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.