Environmental Impacts Statements; Notice of Availability, 59125 [2011-24504]
Download as PDF
Federal Register / Vol. 76, No. 185 / Friday, September 23, 2011 / Notices
updated plan and the MOU or other
binding agreement between the LEA and
the State. A State may establish more
specific requirements for LEA use of
funds provided they are consistent with
the ARRA, with the proposed
requirements of this notice, and with
the Race to the Top requirements. (See
the notice of final priorities,
requirements, definitions, and selection
criteria for the Race to the Top Fund
published in the Federal Register on
November 18, 2009 (74 FR 59688).)
Accessible Format: Individuals with
disabilities can obtain this document in
an accessible format (e.g., braille, large
print, audiotape, or computer diskette)
on request to the program contact
person listed under FOR FURTHER
INFORMATION CONTACT.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register is
available via the Federal Digital System
at https://www.gpo.gov/fdsys. At this site
you can view this document, as well as
all other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF you must
have Adobe Acrobat Reader, which is
available free at this site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at https://
www.federalregister.gov. Specifically,
through the advanced search feature at
this site, you can limit your search to
documents published by the
Department.
Dated: September 21, 2011.
Arne Duncan,
Secretary of Education.
[FR Doc. 2011–24624 Filed 9–21–11; 4:15 pm]
BILLING CODE 4000–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8999–2]
sroberts on DSK5SPTVN1PROD with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 09/12/2011 Through 09/16/2011
Pursuant to 40 CFR 1506.9.
VerDate Mar<15>2010
16:41 Sep 22, 2011
Jkt 223001
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EIS are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20110315, Final EIS, USFS, MN,
South Fowl Lake Snowmobile Access
Project, Proposing a Replacement
Snowmobile Trail between McFarland
Lake and South Fowl Lake, Gunflint
Ranger District, Superior National
Forest, Eastern Region, Cook County,
MN, Review Period Ends: 10/24/2011,
Contact: Peter Taylor 218–626–4368.
EIS No. 20110316, Draft EIS, USACE,
CA, Pier S Marine Terminal
Development and Back Channel
Navigational Safety Improvements,
Construction and Operation, U.S.
Army COE Section 10 and 404 Permit
and Section 103 of the Marine
Protection Research and Sanctuaries
Act, Los Angeles County, CA,
Comment Period Ends: 11/07/2011,
Contact: John W. Markham 805–585–
2150.
EIS No. 20110317, Draft EIS, USFS, MT,
Lonesome Wood Vegetation
Management 2 Project Areas,
Proposed Forest Thinning, Prescribed
Burning and Associated Activities,
Habgen Lake Ranger District, Gallatin
National Forest, Gallatin County, MT,
Comment Period Ends: 11/07/2011,
Contact: Teri Seth 406–522–2539.
EIS No. 20110318, Final EIS, BLM, AZ,
Ironwood Forest National Monument,
Resource Management Plan,
Implementation, Tucson Field Office,
AZ, Review Period Ends: 10/24/2011,
Contact: Laura Olais 520–258–7242.
EIS No. 20110319, Draft Supplement,
NOAA, CA, Southwest Fisheries
Science Center (SWFSC), Demolition,
Soil Stabilization and Seismic
Improvement in La Jolla, CA,
Comment Period Ends: 11/07/2011,
Contact: William F. Broglie 206–526–
4837.
EIS No. 20110320, Final EIS, NOAA,
CA, ADOPTION—Bair Island
Restoration and Management Plan,
Tidal Action Restoration, Don
Edwards San Francisco Bay National
Wildlife Refuge, Bair Island State
Ecological Reserve, South San
Francisco Bay, San Mateo County,
CA, Review Period Ends: 10/24/2011,
Contact: Patricia A. Montanio 301–
427–8618. U.S. DOC has adopted the
DOI, SFW’S FEIS #20060314, filed 07/
24/2006. DOC was not a Cooperating
Agency for the above FEIS;
recirculation of the document is
necessary under 40 CFR 1506.3(b).
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
59125
EIS No. 20110321, Draft EIS, BLM, CA,
South Coast Resource Management
Plan Revision, Implementation, San
Diego, Riverside, San Bernardino,
Orange and Los Angeles Counties,
CA, Comment Period Ends: 12/21/
2011, Contact: Greg Hill 760–833–
7140.
EIS No. 20110322, Draft EIS, USACE,
NC, NC–1409 (Military Cutoff Road)
Extension and Proposed US 17
Hampstead Bypass, New Hanover and
Pender Counties, NC, Comment
Period Ends: 11/15/2011, Contact:
Brad Shaver 910–251–4611.
EIS No. 20110323, Draft Supplement,
USFS, MI, Huron-Manistee National
Forests, Supplement the 2006 FEIS
Analysis and to Correct the
Deficiencies that the Meister Panel
Identified, Land and Resource
Management Plan, Implementation,
Several Counties, MI, Comment
Period Ends: 12/21/2011, Contact:
Ken Abrogate 231–775–2421.
EIS No. 20110324, Final EIS, FHWA, 00,
Interstate 5 Columbia River Crossing
Project, Bridge, Transit, and Highway
Improvements, from State Route 500
in Vancouver, WA to Columbia
Boulevard in Portland, OR, Funding,
U.S. COE Section 10 & 404 Permits,
NPDES Permit, Review Period Ends:
10/24/2011, Contact: James Saxon
206–220–4311.
Amended Notices
EIS No. 20110257, Draft EIS, FRA, CA,
California High-Speed Train (HST):
Merced to Fresno Section High-Speed
Train, Propose to Construct, Operate,
and Maintain an Electric-Powered
High-Speed Train (HST), Merced,
Madera and Fresno Counties, CA,
Comment Period Ends: 10/13/2011,
Contact: David Valenstein 202–493–
6868. Revision to FR Notice
Published: Extending Comment
Period from 09/28/2011 to 10/13/
2011.
Dated: September 20, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–24504 Filed 9–22–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9470–8]
2011 Fall Meeting of the Ozone
Transport Commission
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
E:\FR\FM\23SEN1.SGM
23SEN1
Agencies
[Federal Register Volume 76, Number 185 (Friday, September 23, 2011)]
[Notices]
[Page 59125]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-24504]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8999-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 09/12/2011 Through 09/16/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20110315, Final EIS, USFS, MN, South Fowl Lake Snowmobile
Access Project, Proposing a Replacement Snowmobile Trail between
McFarland Lake and South Fowl Lake, Gunflint Ranger District, Superior
National Forest, Eastern Region, Cook County, MN, Review Period Ends:
10/24/2011, Contact: Peter Taylor 218-626-4368.
EIS No. 20110316, Draft EIS, USACE, CA, Pier S Marine Terminal
Development and Back Channel Navigational Safety Improvements,
Construction and Operation, U.S. Army COE Section 10 and 404 Permit and
Section 103 of the Marine Protection Research and Sanctuaries Act, Los
Angeles County, CA, Comment Period Ends: 11/07/2011, Contact: John W.
Markham 805-585-2150.
EIS No. 20110317, Draft EIS, USFS, MT, Lonesome Wood Vegetation
Management 2 Project Areas, Proposed Forest Thinning, Prescribed
Burning and Associated Activities, Habgen Lake Ranger District,
Gallatin National Forest, Gallatin County, MT, Comment Period Ends: 11/
07/2011, Contact: Teri Seth 406-522-2539.
EIS No. 20110318, Final EIS, BLM, AZ, Ironwood Forest National
Monument, Resource Management Plan, Implementation, Tucson Field
Office, AZ, Review Period Ends: 10/24/2011, Contact: Laura Olais 520-
258-7242.
EIS No. 20110319, Draft Supplement, NOAA, CA, Southwest Fisheries
Science Center (SWFSC), Demolition, Soil Stabilization and Seismic
Improvement in La Jolla, CA, Comment Period Ends: 11/07/2011, Contact:
William F. Broglie 206-526-4837.
EIS No. 20110320, Final EIS, NOAA, CA, ADOPTION--Bair Island
Restoration and Management Plan, Tidal Action Restoration, Don Edwards
San Francisco Bay National Wildlife Refuge, Bair Island State
Ecological Reserve, South San Francisco Bay, San Mateo County, CA,
Review Period Ends: 10/24/2011, Contact: Patricia A. Montanio 301-427-
8618. U.S. DOC has adopted the DOI, SFW'S FEIS 20060314, filed
07/24/2006. DOC was not a Cooperating Agency for the above FEIS;
recirculation of the document is necessary under 40 CFR 1506.3(b).
EIS No. 20110321, Draft EIS, BLM, CA, South Coast Resource Management
Plan Revision, Implementation, San Diego, Riverside, San Bernardino,
Orange and Los Angeles Counties, CA, Comment Period Ends: 12/21/2011,
Contact: Greg Hill 760-833-7140.
EIS No. 20110322, Draft EIS, USACE, NC, NC-1409 (Military Cutoff Road)
Extension and Proposed US 17 Hampstead Bypass, New Hanover and Pender
Counties, NC, Comment Period Ends: 11/15/2011, Contact: Brad Shaver
910-251-4611.
EIS No. 20110323, Draft Supplement, USFS, MI, Huron-Manistee National
Forests, Supplement the 2006 FEIS Analysis and to Correct the
Deficiencies that the Meister Panel Identified, Land and Resource
Management Plan, Implementation, Several Counties, MI, Comment Period
Ends: 12/21/2011, Contact: Ken Abrogate 231-775-2421.
EIS No. 20110324, Final EIS, FHWA, 00, Interstate 5 Columbia River
Crossing Project, Bridge, Transit, and Highway Improvements, from State
Route 500 in Vancouver, WA to Columbia Boulevard in Portland, OR,
Funding, U.S. COE Section 10 & 404 Permits, NPDES Permit, Review Period
Ends: 10/24/2011, Contact: James Saxon 206-220-4311.
Amended Notices
EIS No. 20110257, Draft EIS, FRA, CA, California High-Speed Train
(HST): Merced to Fresno Section High-Speed Train, Propose to Construct,
Operate, and Maintain an Electric-Powered High-Speed Train (HST),
Merced, Madera and Fresno Counties, CA, Comment Period Ends: 10/13/
2011, Contact: David Valenstein 202-493-6868. Revision to FR Notice
Published: Extending Comment Period from 09/28/2011 to 10/13/2011.
Dated: September 20, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-24504 Filed 9-22-11; 8:45 am]
BILLING CODE 6560-50-P