PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation, 4293-4294 [2024-01141]
Download as PDF
Federal Register / Vol. 89, No. 15 / Tuesday, January 23, 2024 / Notices
Filed Date: 1/17/24.
Accession Number: 20240117–5159.
Comment Date: 5 p.m. ET 2/7/24.
khammond on DSKJM1Z7X2PROD with NOTICES
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF24–194–000;
EL24–55–000.
Applicants: Brainerd Solar, LLC,
Brainerd Solar, LLC.
Description: Refund Report of
Brainerd Solar, LLC.
Filed Date: 1/17/24.
Accession Number: 20240117–5157.
Comment Date: 5 p.m. ET 2/7/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: January 17, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–01267 Filed 1–22–24; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:41 Jan 22, 2024
Jkt 262001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2361–056]
ALLETE, Inc.; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a subsequent license to
continue to operate and maintain the
Prairie River Hydroelectric Project
(project). The project is located on the
Prairie River in Itasca County,
Minnesota. Commission staff has
prepared an Environmental Assessment
(EA) for the project.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/FERCOnline.
aspx to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595, or OPP@
ferc.gov.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
4293
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, you may submit
a paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include docket number P–2361–056.
For further information, contact Laura
Washington at 202–502–6072 or
laura.washington@ferc.gov.
Dated: January 16, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–01144 Filed 1–22–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2425–000]
PE Hydro Generation, LLC; Notice of
Authorization for Continued Project
Operation
The license for the Luray and
Newport Hydroelectric Project No. 2425
was issued for a period ending
December 31, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
E:\FR\FM\23JAN1.SGM
23JAN1
4294
Federal Register / Vol. 89, No. 15 / Tuesday, January 23, 2024 / Notices
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2425
is issued to PE Hydro Generation, LLC
for a period effective January 1, 2024,
through December 31, 2024, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before December 31,
2024, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that PE Hydro Generation, LLC is
authorized to continue operation of the
Luray and Newport Hydroelectric
Project under the terms and conditions
of the prior license until the issuance of
a subsequent license for the project or
other disposition under the FPA,
whichever comes first.
Dated: January 16, 2024.
Debbie-Anne Reese,
Acting Secretary.
[FR Doc. 2024–01141 Filed 1–22–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC24–39–000.
Applicants: Cambria Wind LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Cambria Wind
LLC.
Filed Date: 1/12/24.
Accession Number: 20240112–5197.
Comment Date: 5 p.m. ET 2/2/24.
Docket Numbers: EC24–40–000.
Applicants: Mulligan Solar, LLC,
Great Pathfinder Wind, LLC, ERG US
Holdings, Inc.
VerDate Sep<11>2014
17:41 Jan 22, 2024
Jkt 262001
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Mulligan Solar,
LLC, et al.
Filed Date: 1/16/24.
Accession Number: 20240116–5088.
Comment Date: 5 p.m. ET 2/6/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–228–002.
Applicants: South Cheyenne Solar,
LLC.
Description: Report Filing:
Supplement to MBR Authority
Application Filing to be effective N/A.
Filed Date: 1/11/24.
Accession Number: 20240111–5143.
Comment Date: 5 p.m. ET 1/22/24.
Docket Numbers: ER24–374–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Deficiency Response—FTR Bilateral
Agreement Reform to be effective 6/30/
2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5190.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–793–001.
Applicants: Entergy Texas, Inc.
Description: Tariff Amendment: ETI–
ETEC First Revised Coordination
Services Agreement to be effective 2/27/
2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5050.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–796–001.
Applicants: Entergy Texas, Inc.
Description: Tariff Amendment: ETI–
ETEC Second Revised LBA Agreement
to be effective 2/27/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5056.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–805–001.
Applicants: Entergy Arkansas, LLC.
Description: Tariff Amendment:
Updated LBA Agreement to be effective
3/2/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5199.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–875–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Duke Energy Indiana, LLC
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2024–01–16_SA 3646
Termination of DEI-Hardy Hills
Substitute E&P (J1063) to be effective
3/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5083.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–876–000.
Applicants: KMC Thermo, LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5105.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–877–000.
Applicants: Maricopa West Solar PV,
LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5112.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–878–000.
Applicants: Marina Energy, LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5113.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–879–000.
Applicants: Mesquite Power, LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5115.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–880–000.
Applicants: MS Solar 3, LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5116.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–881–000.
Applicants: Mulberry Farm, LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5118.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–882–000.
Applicants: Palouse Wind, LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5120.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–883–000.
Applicants: Pavant Solar LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5121.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–884–000.
Applicants: Pio Pico Energy Center,
LLC.
Description: Compliance filing: Tariff
Revisions to be effective 1/17/2024.
Filed Date: 1/16/24.
Accession Number: 20240116–5122.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: ER24–885–000.
E:\FR\FM\23JAN1.SGM
23JAN1
Agencies
[Federal Register Volume 89, Number 15 (Tuesday, January 23, 2024)]
[Notices]
[Pages 4293-4294]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-01141]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2425-000]
PE Hydro Generation, LLC; Notice of Authorization for Continued
Project Operation
The license for the Luray and Newport Hydroelectric Project No.
2425 was issued for a period ending December 31, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee(s) under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth
at 18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms
[[Page 4294]]
and conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2425 is issued to
PE Hydro Generation, LLC for a period effective January 1, 2024,
through December 31, 2024, or until the issuance of a new license for
the project or other disposition under the FPA, whichever comes first.
If issuance of a new license (or other disposition) does not take place
on or before December 31, 2024, notice is hereby given that, pursuant
to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA
is renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that PE Hydro Generation, LLC is authorized to continue
operation of the Luray and Newport Hydroelectric Project under the
terms and conditions of the prior license until the issuance of a
subsequent license for the project or other disposition under the FPA,
whichever comes first.
Dated: January 16, 2024.
Debbie-Anne Reese,
Acting Secretary.
[FR Doc. 2024-01141 Filed 1-22-24; 8:45 am]
BILLING CODE 6717-01-P