Susquehanna River Basin Commission – Federal Register Recent Federal Regulation Documents

Results 351 - 400 of 480
Projects Rescinded for Consumptive Uses of Water
Document Number: 2014-02634
Type: Notice
Date: 2014-02-07
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the approved by rule projects rescinded by the Susquehanna River Basin Commission during the period set forth in DATES.
Actions Taken at December 12, 2013, Meeting
Document Number: 2014-01923
Type: Notice
Date: 2014-01-31
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on December 12, 2013, in Annapolis, Maryland, the Commission took the following actions: (1) approved or tabled the applications of certain water resources projects (one involving an into-basin diversion and one involving an out-of-basin diversion); and (2) took additional actions, as set forth in the Supplementary Information below.
Public Hearing
Document Number: 2014-00366
Type: Notice
Date: 2014-01-13
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on February 6, 2014, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for March 6, 2014, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is February 18, 2014.
Actions Taken at September 19, 2013, Meeting
Document Number: 2013-29049
Type: Notice
Date: 2013-12-05
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on September 19, 2013, in Binghamton, New York, the Commission took the following actions: (1) Approved or tabled the applications of certain water resources projects; (2) rescinded approvals for three projects; (3) took additional actions, as set forth in the Supplementary Information below.
Commission Meeting
Document Number: 2013-27652
Type: Notice
Date: 2013-11-19
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on December 12, 2013, in Annapolis, Maryland. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this notice.
Public Hearing
Document Number: 2013-25320
Type: Notice
Date: 2013-10-28
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on November 13, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for December 12, 2013, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is November 25, 2013.
Commission Meeting
Document Number: 2013-20586
Type: Notice
Date: 2013-08-23
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on September 19, 2013, in Binghamton, New York. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this notice.
Public Hearing
Document Number: 2013-17431
Type: Notice
Date: 2013-07-22
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on August 15, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for September 19, 2013, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is August 26, 2013.
Actions Taken at June 20, 2013, Meeting
Document Number: 2013-16726
Type: Notice
Date: 2013-07-12
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on June 20, 2013, in Harrisburg, Pennsylvania, the Commission took the following actions: (1) Approved or tabled the applications of certain water resources projects; (2) rescinded approvals for two projects; (3) accepted settlements in lieu of penalty from Furman Foods, Inc. and Carrizo (Marcellus) LLC; and (4) took additional actions, as set forth in the SUPPLEMENTARY INFORMATION below.
Public Review and Comment; Public Hearing-2013 Update of Comprehensive Plan
Document Number: 2013-15419
Type: Notice
Date: 2013-06-27
Agency: Susquehanna River Basin Commission, Agencies and Commissions
On June 20, 2013, the Susquehanna River Basin Commission released a proposed 2013 Update of the Comprehensive Plan for the Water Resources of the Susquehanna River Basin Commission (2013 Update of the Comprehensive Plan) for public review and comment. In accordance with Section 14.1 of the Susquehanna River Basin Compact, the Commission shall develop and adopt, and may from time to time review and revise a comprehensive plan for management of the basin's water resources. As part of the public comment process, the Commission will hold a public hearing to hear testimony on the 2013 Update of the Comprehensive Plan. Written comments may be submitted at any time during the public comment period.
Commission Meeting
Document Number: 2013-12724
Type: Notice
Date: 2013-05-29
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on June 20, 2013, in Harrisburg, Pennsylvania. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this notice.
Projects Approved for Consumptive Uses of Water
Document Number: 2013-11160
Type: Notice
Date: 2013-05-10
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Projects Rescinded for Consumptive Uses of Water
Document Number: 2013-11136
Type: Notice
Date: 2013-05-10
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the approved by rule projects rescinded by the Susquehanna River Basin Commission during the period set forth in DATES.
Public Hearing
Document Number: 2013-09887
Type: Notice
Date: 2013-04-26
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on May 23, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for June 20, 2013, which will be noticed separately. The Commission will also hear testimony on amending its Regulatory Program Fee Schedule. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects and other items. The deadline for the submission of written comments is June 3, 2013.
Actions Taken at March 21, 2013, Meeting
Document Number: 2013-08991
Type: Notice
Date: 2013-04-17
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on March 21, 2013, in Harrisburg, Pennsylvania, the Commission took the following actions: (1) Approved, denied, or tabled the applications of certain water resources projects; (2) rescinded approvals for three projects and tabled a rescission for one project; (3) authorized the Executive Director to modify or extend timelines established by docket conditions, where warranted and with prudent administrative discretion; and (4) took additional actions, as set forth in the SUPPLEMENTARY INFORMATION below.
Projects Approved for Consumptive Uses of Water
Document Number: 2013-06300
Type: Notice
Date: 2013-03-20
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Projects Approved for Consumptive Uses of Water
Document Number: 2013-05512
Type: Notice
Date: 2013-03-11
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Commission Meeting
Document Number: 2013-04102
Type: Notice
Date: 2013-02-22
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on March 21, 2013, in Harrisburg, Pennsylvania. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this notice.
Projects Approved for Consumptive Uses of Water
Document Number: 2013-03832
Type: Notice
Date: 2013-02-20
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Public Hearing
Document Number: 2013-01499
Type: Notice
Date: 2013-01-25
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on February 14, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for March 21, 2013, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is February 25, 2013.
Actions Taken at December 14, 2012, Meeting
Document Number: 2013-00309
Type: Notice
Date: 2013-01-10
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on December 14, 2012, in Annapolis, Maryland, the Commission took the following actions: (1) Approved settlement involving a water resources project; (2) approved or tabled the applications of certain water resources projects; (3) rescinded approvals for two projects and tabled a rescission for another project; and (4) took additional actions, as set forth in the SUPPLEMENTARY INFORMATION below.
Projects Approved for Consumptive Uses of Water
Document Number: 2013-00300
Type: Notice
Date: 2013-01-10
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in ``DATES.''
Review and Approval of Projects
Document Number: 2012-30764
Type: Proposed Rule
Date: 2012-12-26
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This document contains proposed rules that would amend the project review regulations of the Susquehanna River Basin Commission (Commission) to include special requirements for withdrawals from surface water and groundwater sources which, from the point of taking or point of impact respectively, have a drainage area of equal to or less than ten square miles (headwater area); and to modify provisions relating to the issuance of emergency certificates by the Executive Director.
Commission Meeting
Document Number: 2012-28355
Type: Notice
Date: 2012-11-23
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on December 14, 2012, in Annapolis, Maryland. Details concerning the matters to be addressed at the business meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice.
Projects Approved for Consumptive Uses of Water
Document Number: 2012-27110
Type: Notice
Date: 2012-11-07
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Actions Taken at September 20, 2012, Meeting
Document Number: 2012-26877
Type: Notice
Date: 2012-11-02
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on September 20, 2012, in Harrisburg, Pennsylvania, the Commission took the following actions: approved or tabled the applications of certain water resources projects; and took additional actions, as set forth in the Supplementary Information below.
Public Hearing
Document Number: 2012-25914
Type: Notice
Date: 2012-10-22
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on November 15, 2012, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for December 14, 2012, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is November 26, 2012.
Projects Approved for Consumptive Uses of Water
Document Number: 2012-23660
Type: Notice
Date: 2012-09-26
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in ``DATES.''
Projects Rescinded for Consumptive Uses of Water
Document Number: 2012-23659
Type: Notice
Date: 2012-09-26
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects rescinded by the Susquehanna River Basin Commission during the period set forth in DATES.
Projects Approved for Consumptive Uses of Water
Document Number: 2012-22230
Type: Notice
Date: 2012-09-11
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Projects Rescinded for Consumptive Uses of Water
Document Number: 2012-22228
Type: Notice
Date: 2012-09-11
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects rescinded by the Susquehanna River Basin Commission during the period set forth in DATES.
Projects Approved for Consumptive Uses of Water
Document Number: 2012-22226
Type: Notice
Date: 2012-09-11
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Commission Meeting
Document Number: 2012-21125
Type: Notice
Date: 2012-08-28
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on September 20, 2012, in Harrisburg, Pennsylvania. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this notice.
Public Hearing
Document Number: 2012-18470
Type: Notice
Date: 2012-07-30
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on August 23, 2012, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for September 20, 2012, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is September 4, 2012.
Actions Taken at June 7, 2012 Meeting
Document Number: 2012-16660
Type: Notice
Date: 2012-07-09
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on June 7, 2012, in Binghamton, New York, the Commission took the following actions: (1) Rescinded approval for one water resources project; (2) approved or tabled the applications of certain water resources projects; and (3) took additional actions as set forth in the Supplementary Information below.
Extension of Comment Period-Proposed Low Flow Protection Policy
Document Number: 2012-14389
Type: Notice
Date: 2012-06-13
Agency: Susquehanna River Basin Commission, Agencies and Commissions
At its regular meeting in Binghamton, New York on June 7, 2012, the Susquehanna River Basin Commission (SRBC) extended the comment deadline for its proposed Low Flow Protection Policy to July 16, 2012. The original comment deadline had been May 16, 2012. On March 15, 2012, SRBC's commissioners approved the release of the proposed Low Flow Protection Policy for public review and comment. The proposed policy was developed over the past yearbased on scientific advances in ecosystem flow protectionto improve low flow protection standards associated with approved water withdrawals. SRBC will use the final policy and supporting technical guidance when reviewing withdrawal applications to establish limits and conditions on approvals consistent with SRBC's regulatory standards (18 CFR Sec. 806.23).
Projects Approved for Consumptive Uses of Water
Document Number: 2012-13999
Type: Notice
Date: 2012-06-11
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Commission Meeting
Document Number: 2012-11479
Type: Notice
Date: 2012-05-14
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on June 7, 2012, in Binghamton, New York. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this notice.
Projects Approved for Consumptive Uses of Water
Document Number: 2012-10004
Type: Notice
Date: 2012-04-26
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Public Hearing
Document Number: 2012-9348
Type: Notice
Date: 2012-04-18
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on May 10, 2012, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for June 7, 2012, which will be noticed separately. The Commission will also hear testimony on: (1) Amending its Regulatory Program Fee Schedule; (2) amending its Records Processing Fee Schedule; and (3) amending the Comprehensive Plan for the Water Resources of the Susquehanna River Basin. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects and other items. The deadline for the submission of written comments is May 21, 2012.
Projects Approved for Consumptive Uses of Water
Document Number: 2012-8465
Type: Notice
Date: 2012-04-09
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.
Actions Taken at December 15, 2011, Meeting
Document Number: 2012-7552
Type: Notice
Date: 2012-03-29
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on December 15, 2011, in Wilkes-Barre, Pennsylvania, the Commission convened a public hearing, at which it took the following actions: (1) Rescinded approval for three water resources projects; and (2) approved, denied, or tabled the applications of certain water resources projects. The Commission took additional actions at its business meeting as set forth in the Supplementary Information below.
Actions Taken at March 15, 2012, Meeting
Document Number: 2012-7528
Type: Notice
Date: 2012-03-29
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on March 15, 2012, in Harrisburg, Pennsylvania, the Commission took the following actions: (1) Reconsidered certain actions taken at its December 15, 2011, public hearing; (2) upon reconsideration, approved or denied the applications of certain water resources projects, originally considered at the December 15, 2011, public hearing; (3) rescinded approval for one additional water resources project; (4) approved, tabled or denied the applications of certain additional water resources projects; and (5) took additional actions as set forth in the Supplementary Information below.
Low Flow Protection Policy
Document Number: 2012-7101
Type: Notice
Date: 2012-03-26
Agency: Susquehanna River Basin Commission, Agencies and Commissions
As part of its regular business meeting held on March 15, 2012, in Harrisburg, Pennsylvania, the Susquehanna River Basin Commission (Commission) approved the release of a proposed Low Flow Protection Policy (Policy) for public review and comment. The Policy can be accessed on the Commission's Web site at https://www.srbc.net/ pubinfo/businessmeeting.htm, or by contacting the Commission to receive a copy by first-class mail. Persons interested in providing comments are directed to submit the same in writing on or before May 16, 2012.
Review and Approval of Projects
Document Number: 2012-5837
Type: Rule
Date: 2012-03-09
Agency: Susquehanna River Basin Commission, Agencies and Commissions
Commission Meeting
Document Number: 2012-4027
Type: Notice
Date: 2012-02-22
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold its regular business meeting on March 15, 2012, in Harrisburg, Pennsylvania. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this notice.
Public Hearing; Correction
Document Number: 2012-3890
Type: Notice
Date: 2012-02-21
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission published a document in the Federal Register of January 23, 2012, concerning a public hearing to be held on February 16, 2012, in Harrisburg, Pennsylvania. The document contained an incorrect location for one of the projects listed in the Supplementary Information section of such notice.
Review and Approval of Projects
Document Number: 2012-2504
Type: Rule
Date: 2012-02-14
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This document contains final rules that would amend the project review regulations of the Susquehanna River Basin Commission (Commission) to include definitions for new terms and an amended definition; provide for administrative approval of interbasin transfers of flowback and production fluids between drilling pad sites that are isolated from the waters of the basin; provide for administrative approval of out-of-basin transfers of flowback or produced fluids from a Commission approved hydrocarbon development project to an out-of- basin treatment or disposal facility; insert language authorizing renewal of expiring approvals, including Approvals by Rule (ABRs); delete specific references to geologic formations that may be the subject of natural gas development using hydrofracture stimulation and replace with a generic category``unconventional natural gas development;'' broaden the scope of ABRs issued to include hydrocarbon development of any kind utilizing the waters of the basin, not just unconventional natural gas well development; memorialize the current practice of requiring post-hydrofracture reporting; and provide further procedures for the approval of water sources utilized at projects subject to the ABR process.
Projects Approved for Consumptive Uses of Water
Document Number: 2012-1997
Type: Notice
Date: 2012-01-31
Agency: Susquehanna River Basin Commission, Agencies and Commissions
This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in ``DATES.''
Public Hearing
Document Number: 2012-1185
Type: Notice
Date: 2012-01-23
Agency: Susquehanna River Basin Commission, Agencies and Commissions
The Susquehanna River Basin Commission will hold a public hearing on February 16, 2012, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for March 15, 2012, which will be noticed separately. Included in the list of projects scheduled for comment at the public hearing are both new projects and certain projects that were acted upon at the Commission's December 15, 2011, public hearing held in Wilkes-Barre, Pennsylvania. The Commission is affording this opportunity for additional comment due to the disruptive behavior of certain individuals that prevented many interested persons from being able to offer testimony at the December 15, 2011, public hearing. To give due consideration of any new oral or written comment received on such projects, the Commission will reconsider, at its March 2012, meeting, the actions taken on December 15, 2011. Details concerning the list of all projects that are the subject of the public hearing are contained in the Supplementary Information section of this notice. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. There will be no opportunity for further comment on these projects at the Commission's business meeting in March 2012, where the Commission is expected to take action thereon. The deadline for written comments on all such projects is February 27, 2012.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.