Public Hearing, 18276-18277 [2015-07668]
Download as PDF
18276
Federal Register / Vol. 80, No. 64 / Friday, April 3, 2015 / Notices
use of automated collection techniques
or other forms of information
technology.
Please note that comments submitted
in response to this Notice are public
record. Before including any detailed
personal information, you should be
aware that your comments as submitted,
including your personal information,
will be available for public review.
Abstract of Proposed Collection
The DS–261 allows the beneficiary of
an approved immigrant visa petition to
provide the Department with his or her
current address, which will be used for
communications with the beneficiary.
The DS–261 also allows the beneficiary
to appoint an agent to receive
communications relevant to the
beneficiary’s visa application from the
National Visa Center (NVC) and assist in
the filing of various application forms
and/or paying the required fees. The
beneficiary is not required to use an
agent. The NVC can contact them
directly. If the beneficiary chooses to
serve as their own agent and have the
NVC contact them directly, they will
need to provide the NVC with their
current contact information. All cases
will be held at NVC until the DS–261 is
electronically submitted to the
Department.
Methodology
Applicants will submit the DS–261
electronically to the Department via the
internet. Applicants who submit the
electronic form will no longer submit
paper-based applications to the
Department.
Dated: March 26, 2015.
Karin King,
Managing Director, Bureau of Consular
Affairs, Department of State.
[FR Doc. 2015–07695 Filed 4–2–15; 8:45 am]
BILLING CODE 4710–06–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on April 30, 2015, in Grantville,
Pennsylvania. At this public hearing,
the Commission will hear testimony on
the projects listed in the Supplementary
Information section of this notice. Such
projects are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
asabaliauskas on DSK5VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:49 Apr 02, 2015
Jkt 235001
for June 4, 2015, which will be noticed
separately. The Commission will also
hear testimony on amending its
Regulatory Program Fee Schedule. The
public should take note that this public
hearing will be the only opportunity to
offer oral comment to the Commission
for the listed projects. The deadline for
the submission of written comments is
May 11, 2015.
DATES: The public hearing will convene
on April 30, 2015, at 7:00 p.m. The
public hearing will end at 9:00 p.m. or
at the conclusion of public testimony,
whichever is sooner. The deadline for
the submission of written comments is
May 11, 2015.
ADDRESSES: The public hearing will be
conducted at the Holiday Inn
Harrisburg-Hershey, Grande 1 Room,
604 Station Road (Exit 80 off I–81),
Grantville, Pa.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, Regulatory Counsel,
telephone: (717) 238–0423, ext. 1312;
fax: (717) 238–2436.
Information concerning the
applications for these projects is
available at the SRBC Water Resource
Portal at www.srbc.net/wrp. Additional
supporting documents are available to
inspect and copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.net/pubinfo/docs/2009-02_
Access_to_Records_Policy_
20140115.pdf.
SUPPLEMENTARY INFORMATION: The
public hearing will cover amendments
to its Regulatory Program Fee Schedule,
as posted on the SRBC Public
Participation Center Web page at
www.srbc.net/pubinfo/
publicparticipation.htm. The public
hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor and Facility:
Anadarko E&P Onshore LLC (Pine
Creek), McHenry Township, Lycoming
County, Pa. Application for renewal of
surface water withdrawal of up to 1.500
mgd (peak day) (Docket No. 20110601).
2. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Meshoppen
Creek), Washington Township,
Wyoming County, Pa. Application for
renewal of surface water withdrawal of
up to 2.160 mgd (peak day) (Docket No.
20110603).
3. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Unnamed
Tributary to Middle Branch Wyalusing
Creek), Forest Lake Township,
Susquehanna County, Pa. Application
for renewal of surface water withdrawal
of up to 0.648 mgd (peak day) (Docket
No. 20110605).
PO 00000
Frm 00089
Fmt 4703
Sfmt 4703
4. Project Sponsor and Facility:
Chetremon Golf Course, LLC, Burnside
Township, Clearfield County, Pa.
Application for consumptive water use
of up to 0.200 mgd (peak day).
5. Project Sponsor and Facility:
Chetremon Golf Course, LLC (Irrigation
Storage Pond), Burnside Township,
Clearfield County, Pa. Application for
surface water withdrawal of up to 0.200
mgd (peak day).
6. Project Sponsor and Facility: Chief
Oil & Gas LLC (Loyalsock Creek),
Forksville Borough, Sullivan County,
Pa. Application for surface water
withdrawal of up to 2.000 mgd (peak
day).
7. Project Sponsor and Facility:
Constitution Pipeline Company, LLC
(Charlotte Creek), Town of Davenport,
Delaware County, N.Y. Application for
surface water withdrawal of up to 2.160
mgd (peak day).
8. Project Sponsor and Facility:
Constitution Pipeline Company, LLC
(Ouleout Creek), Town of Sidney,
Delaware County, N.Y. Application for
surface water withdrawal of up to 1.928
mgd (peak day).
9. Project Sponsor and Facility:
Constitution Pipeline Company, LLC
(Starrucca Creek), Harmony Township,
Susquehanna County, Pa. Application
for surface water withdrawal of up to
2.052 mgd (peak day).
10. Project Sponsor and Facility:
Furman Foods, Inc., Point Township,
Northumberland County, Pa.
Modification to add a source to the
consumptive water use approval (no
increase requested in current
consumptive water use quantity)
(Docket No. 20130608).
11. Project Sponsor and Facility:
Furman Foods, Inc., Point Township,
Northumberland County, Pa.
Application for groundwater
withdrawal of up to 0.504 mgd (30-day
average) from Well 10.
12. Project Sponsor and Facility:
Hydro Recovery, LP, Blossburg Borough,
Tioga County, Pa. Application for
renewal of groundwater withdrawal of
up to 0.216 mgd (30-day average) from
Well HR–1 (Docket No. 20110612).
13. Project Sponsor and Facility:
Hydro Recovery, LP, Blossburg Borough,
Tioga County, Pa. Application for
renewal of consumptive water use of up
to 0.316 mgd (peak day) (Docket No.
20110612).
14. Project Sponsor and Facility:
Keister Miller Investments, LLC (West
Branch Susquehanna River), Mahaffey
Borough, Clearfield County, Pa.
Application for surface water
withdrawal of up to 2.000 mgd (peak
day).
E:\FR\FM\03APN1.SGM
03APN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 64 / Friday, April 3, 2015 / Notices
15. Project Sponsor and Facility:
Keystone Clearwater Solutions, LLC
(Driftwood Branch Sinnemahoning
Creek), Emporium Borough, Cameron
County, Pa. Application for renewal of
surface water withdrawal of up to 0.999
mgd (peak day) (Docket No. 20110614).
16. Project Sponsor and Facility:
Keystone Clearwater Solutions, LLC
(Lycoming Creek), Lewis Township,
Lycoming County, Pa. Application for
renewal of surface water withdrawal of
up to 1.250 mgd (peak day) (Docket No.
20110616).
17. Project Sponsor and Facility:
Millersville University of Pennsylvania,
Millersville Borough, Lancaster County,
Pa. Application for consumptive water
use of up to 0.080 mgd (peak day).
18. Project Sponsor and Facility:
Millersville University of Pennsylvania,
Millersville Borough, Lancaster County,
Pa. Application for groundwater
withdrawal of up to 0.320 mgd (30-day
average) from Well 1.
19. Project Sponsor and Facility:
Nature’s Way Purewater Systems, Inc.,
Dupont Borough, Luzerne County, Pa.
Modification to increase consumptive
water use by an additional 0.092 mgd
(peak day), for a total of up to 0.349 mgd
(peak day) (Docket No. 20110618).
20. Project Sponsor: Pennsylvania
Department of Environmental
Protection—South-central Regional
Office, City of Harrisburg, Dauphin
County, Pa. Facility Location: Leacock
Township, Lancaster County, Pa.
Application for groundwater
withdrawal of up to 0.590 mgd (30-day
average) from Stoltzfus Well.
21. Project Sponsor: Pennsylvania
Department of Environmental
Protection—South-central Regional
Office, City of Harrisburg, Dauphin
County, Pa. Facility Location: Leacock
Township, Lancaster County, Pa.
Application for groundwater
withdrawal of up to 0.432 mgd (30-day
average) from Township Well.
22. Project Sponsor and Facility:
Shrewsbury Borough, York County, Pa.
Application for renewal and
modification to increase groundwater
withdrawal by an additional 0.024 mgd
(30-day average), for a total of up to
0.089 mgd (30-day average) from the
Blouse Well (Docket No. 19820103).
23. Project Sponsor and Facility:
Shrewsbury Borough, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.099 mgd (30-day
average) from the Smith Well (Docket
No. 19811203).
24. Project Sponsor and Facility:
Talisman Energy USA Inc.
(Wappasening Creek), Windham
Township, Bradford County, Pa.
Application for renewal of surface water
VerDate Sep<11>2014
17:49 Apr 02, 2015
Jkt 235001
withdrawal of up to 1.000 mgd (peak
day) (Docket No. 20110621).
25. Project Sponsor: UGI Development
Company. Project Facility: Hunlock
Creek Energy Center, Hunlock
Township, Luzerne County, Pa.
Modification to increase consumptive
water use by an additional 1.526 mgd
(peak day), for a total of up to 2.396 mgd
(peak day) (Docket No. 20090916).
Request for Waiver of Application and
Approval of Transfer
1. Augusta Water, Inc. request for
waiver of application required by 18
CFR 806.6(d)(1) and transfer of Docket
No. 20021014.
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on the amended fee
schedule or any project listed above.
The presiding officer reserves the right
to limit oral statements in the interest of
time and to otherwise control the course
of the hearing. Ground rules will be
posted on the Commission’s Web site,
www.srbc.net, prior to the hearing for
review. The presiding officer reserves
the right to modify or supplement such
rules at the hearing. Written comments
on any project listed above may also be
mailed to Mr. Jason Oyler, Regulatory
Counsel, Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, Pa. 17110–1788, or
submitted electronically through
www.srbc.net/pubinfo/
publicparticipation.htm. Comments
mailed or electronically submitted must
be received by the Commission on or
before May 11, 2015, to be considered.
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.
Dated: March 27, 2015.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2015–07668 Filed 4–2–15; 8:45 am]
BILLING CODE 7040–01– P
TENNESSEE VALLEY AUTHORITY
Meeting of the Regional Energy
Resource Council and Public Session
With the TVA Board
Tennessee Valley Authority
(TVA).
ACTION: Notice of meeting and public
session.
AGENCY:
The TVA Regional Energy
Resource Council (RERC) will hold a
meeting on Monday, April 20 and
Tuesday April 21, 2015, regarding
regional energy related issues in the
SUMMARY:
PO 00000
Frm 00090
Fmt 4703
Sfmt 4703
18277
Tennessee Valley. In conjunction with
the meeting, the RERC will join the TVA
Board in a public session on April 20 to
hear viewpoints from stakeholders
regarding TVA’s recently released Draft
2015 Integrated Resource Plan (IRP) and
associated Supplemental Environmental
Impact Statement (SEIS).
The RERC was established to advise
TVA on its energy resource activities
and the priorities among competing
objectives and values. Notice of this
meeting is given under the Federal
Advisory Committee Act (FACA), 5
U.S.C. App. 2, and TVA’s procedures
implementing the National
Environmental Policy Act, 42 U.S.C.
4321 to 4370h.
The meeting agenda includes the
following:
1. Welcome and Introductions
2. Recap of February 2015 meeting
3. Presentations and discussion
regarding TVA’s Draft IRP and Draft
SEIS, public comments and
feedback, and TVA’s response
strategy
4. Panel discussions related to energy
efficiency, renewables, and IRP
implementation
5. Public Comments
6. Council discussion
After panel presentations and
discussions on April 20, members of the
public will have the opportunity to
comment on the Draft IRP and
associated SEIS to the RERC and TVA
Board. The public comment period will
be approximately one hour and is
scheduled to start at 3:15 and terminate
at 4:15 (CDT), Monday, April 20, 2015.
Participation in the public comment
period of the meeting will be available
on a first-come, first-served basis.
Speakers will be limited to three (3)
minutes in order to allow as many
people as possible to participate. You
can register to speak on TVA’s Board
Web site until noon (CDT) on Friday
April 19. In addition, you can register at
the door on April 20 before 2:15 (CDT).
Comments also can be submitted by
mail to the Regional Energy Resource
Council, Tennessee Valley Authority,
400 West Summit Hill Drive, WT–9D,
Knoxville, Tennessee 37902; to Charles
P. Nicholson, NEPA Project Manager,
Tennessee Valley Authority, 400 West
Summit Hill Dr., WT–11D, Knoxville,
TN 37902; by email to IRP@tva.gov; or
online via https://www.tva.gov/irp.
All comments, oral and written,
including names and addresses, will
become part of the administrative record
associated with TVA’s IRP and SEIS
review and will be available for public
inspection. Comments must be received
no later than April 27, 2015, to be
considered.
E:\FR\FM\03APN1.SGM
03APN1
Agencies
[Federal Register Volume 80, Number 64 (Friday, April 3, 2015)]
[Notices]
[Pages 18276-18277]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07668]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on April 30, 2015, in Grantville, Pennsylvania. At this public
hearing, the Commission will hear testimony on the projects listed in
the Supplementary Information section of this notice. Such projects are
intended to be scheduled for Commission action at its next business
meeting, tentatively scheduled for June 4, 2015, which will be noticed
separately. The Commission will also hear testimony on amending its
Regulatory Program Fee Schedule. The public should take note that this
public hearing will be the only opportunity to offer oral comment to
the Commission for the listed projects. The deadline for the submission
of written comments is May 11, 2015.
DATES: The public hearing will convene on April 30, 2015, at 7:00 p.m.
The public hearing will end at 9:00 p.m. or at the conclusion of public
testimony, whichever is sooner. The deadline for the submission of
written comments is May 11, 2015.
ADDRESSES: The public hearing will be conducted at the Holiday Inn
Harrisburg-Hershey, Grande 1 Room, 604 Station Road (Exit 80 off I-81),
Grantville, Pa.
FOR FURTHER INFORMATION CONTACT: Jason Oyler, Regulatory Counsel,
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436.
Information concerning the applications for these projects is
available at the SRBC Water Resource Portal at www.srbc.net/wrp.
Additional supporting documents are available to inspect and copy in
accordance with the Commission's Access to Records Policy at
www.srbc.net/pubinfo/docs/2009-02_Access_to_Records_Policy_20140115.pdf.
SUPPLEMENTARY INFORMATION: The public hearing will cover amendments to
its Regulatory Program Fee Schedule, as posted on the SRBC Public
Participation Center Web page at www.srbc.net/pubinfo/publicparticipation.htm. The public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor and Facility: Anadarko E&P Onshore LLC (Pine
Creek), McHenry Township, Lycoming County, Pa. Application for renewal
of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No.
20110601).
2. Project Sponsor and Facility: Carrizo (Marcellus), LLC
(Meshoppen Creek), Washington Township, Wyoming County, Pa. Application
for renewal of surface water withdrawal of up to 2.160 mgd (peak day)
(Docket No. 20110603).
3. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Unnamed
Tributary to Middle Branch Wyalusing Creek), Forest Lake Township,
Susquehanna County, Pa. Application for renewal of surface water
withdrawal of up to 0.648 mgd (peak day) (Docket No. 20110605).
4. Project Sponsor and Facility: Chetremon Golf Course, LLC,
Burnside Township, Clearfield County, Pa. Application for consumptive
water use of up to 0.200 mgd (peak day).
5. Project Sponsor and Facility: Chetremon Golf Course, LLC
(Irrigation Storage Pond), Burnside Township, Clearfield County, Pa.
Application for surface water withdrawal of up to 0.200 mgd (peak day).
6. Project Sponsor and Facility: Chief Oil & Gas LLC (Loyalsock
Creek), Forksville Borough, Sullivan County, Pa. Application for
surface water withdrawal of up to 2.000 mgd (peak day).
7. Project Sponsor and Facility: Constitution Pipeline Company, LLC
(Charlotte Creek), Town of Davenport, Delaware County, N.Y. Application
for surface water withdrawal of up to 2.160 mgd (peak day).
8. Project Sponsor and Facility: Constitution Pipeline Company, LLC
(Ouleout Creek), Town of Sidney, Delaware County, N.Y. Application for
surface water withdrawal of up to 1.928 mgd (peak day).
9. Project Sponsor and Facility: Constitution Pipeline Company, LLC
(Starrucca Creek), Harmony Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 2.052 mgd (peak day).
10. Project Sponsor and Facility: Furman Foods, Inc., Point
Township, Northumberland County, Pa. Modification to add a source to
the consumptive water use approval (no increase requested in current
consumptive water use quantity) (Docket No. 20130608).
11. Project Sponsor and Facility: Furman Foods, Inc., Point
Township, Northumberland County, Pa. Application for groundwater
withdrawal of up to 0.504 mgd (30-day average) from Well 10.
12. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg
Borough, Tioga County, Pa. Application for renewal of groundwater
withdrawal of up to 0.216 mgd (30-day average) from Well HR-1 (Docket
No. 20110612).
13. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg
Borough, Tioga County, Pa. Application for renewal of consumptive water
use of up to 0.316 mgd (peak day) (Docket No. 20110612).
14. Project Sponsor and Facility: Keister Miller Investments, LLC
(West Branch Susquehanna River), Mahaffey Borough, Clearfield County,
Pa. Application for surface water withdrawal of up to 2.000 mgd (peak
day).
[[Page 18277]]
15. Project Sponsor and Facility: Keystone Clearwater Solutions,
LLC (Driftwood Branch Sinnemahoning Creek), Emporium Borough, Cameron
County, Pa. Application for renewal of surface water withdrawal of up
to 0.999 mgd (peak day) (Docket No. 20110614).
16. Project Sponsor and Facility: Keystone Clearwater Solutions,
LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Application
for renewal of surface water withdrawal of up to 1.250 mgd (peak day)
(Docket No. 20110616).
17. Project Sponsor and Facility: Millersville University of
Pennsylvania, Millersville Borough, Lancaster County, Pa. Application
for consumptive water use of up to 0.080 mgd (peak day).
18. Project Sponsor and Facility: Millersville University of
Pennsylvania, Millersville Borough, Lancaster County, Pa. Application
for groundwater withdrawal of up to 0.320 mgd (30-day average) from
Well 1.
19. Project Sponsor and Facility: Nature's Way Purewater Systems,
Inc., Dupont Borough, Luzerne County, Pa. Modification to increase
consumptive water use by an additional 0.092 mgd (peak day), for a
total of up to 0.349 mgd (peak day) (Docket No. 20110618).
20. Project Sponsor: Pennsylvania Department of Environmental
Protection--South-central Regional Office, City of Harrisburg, Dauphin
County, Pa. Facility Location: Leacock Township, Lancaster County, Pa.
Application for groundwater withdrawal of up to 0.590 mgd (30-day
average) from Stoltzfus Well.
21. Project Sponsor: Pennsylvania Department of Environmental
Protection--South-central Regional Office, City of Harrisburg, Dauphin
County, Pa. Facility Location: Leacock Township, Lancaster County, Pa.
Application for groundwater withdrawal of up to 0.432 mgd (30-day
average) from Township Well.
22. Project Sponsor and Facility: Shrewsbury Borough, York County,
Pa. Application for renewal and modification to increase groundwater
withdrawal by an additional 0.024 mgd (30-day average), for a total of
up to 0.089 mgd (30-day average) from the Blouse Well (Docket No.
19820103).
23. Project Sponsor and Facility: Shrewsbury Borough, York County,
Pa. Application for renewal of groundwater withdrawal of up to 0.099
mgd (30-day average) from the Smith Well (Docket No. 19811203).
24. Project Sponsor and Facility: Talisman Energy USA Inc.
(Wappasening Creek), Windham Township, Bradford County, Pa. Application
for renewal of surface water withdrawal of up to 1.000 mgd (peak day)
(Docket No. 20110621).
25. Project Sponsor: UGI Development Company. Project Facility:
Hunlock Creek Energy Center, Hunlock Township, Luzerne County, Pa.
Modification to increase consumptive water use by an additional 1.526
mgd (peak day), for a total of up to 2.396 mgd (peak day) (Docket No.
20090916).
Request for Waiver of Application and Approval of Transfer
1. Augusta Water, Inc. request for waiver of application required
by 18 CFR 806.6(d)(1) and transfer of Docket No. 20021014.
Opportunity To Appear and Comment
Interested parties may appear at the hearing to offer comments to
the Commission on the amended fee schedule or any project listed above.
The presiding officer reserves the right to limit oral statements in
the interest of time and to otherwise control the course of the
hearing. Ground rules will be posted on the Commission's Web site,
www.srbc.net, prior to the hearing for review. The presiding officer
reserves the right to modify or supplement such rules at the hearing.
Written comments on any project listed above may also be mailed to Mr.
Jason Oyler, Regulatory Counsel, Susquehanna River Basin Commission,
4423 North Front Street, Harrisburg, Pa. 17110-1788, or submitted
electronically through www.srbc.net/pubinfo/publicparticipation.htm.
Comments mailed or electronically submitted must be received by the
Commission on or before May 11, 2015, to be considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: March 27, 2015.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2015-07668 Filed 4-2-15; 8:45 am]
BILLING CODE 7040-01- P