Download as PDF 18276 Federal Register / Vol. 80, No. 64 / Friday, April 3, 2015 / Notices use of automated collection techniques or other forms of information technology. Please note that comments submitted in response to this Notice are public record. Before including any detailed personal information, you should be aware that your comments as submitted, including your personal information, will be available for public review. Abstract of Proposed Collection The DS–261 allows the beneficiary of an approved immigrant visa petition to provide the Department with his or her current address, which will be used for communications with the beneficiary. The DS–261 also allows the beneficiary to appoint an agent to receive communications relevant to the beneficiary’s visa application from the National Visa Center (NVC) and assist in the filing of various application forms and/or paying the required fees. The beneficiary is not required to use an agent. The NVC can contact them directly. If the beneficiary chooses to serve as their own agent and have the NVC contact them directly, they will need to provide the NVC with their current contact information. All cases will be held at NVC until the DS–261 is electronically submitted to the Department. Methodology Applicants will submit the DS–261 electronically to the Department via the internet. Applicants who submit the electronic form will no longer submit paper-based applications to the Department. Dated: March 26, 2015. Karin King, Managing Director, Bureau of Consular Affairs, Department of State. [FR Doc. 2015–07695 Filed 4–2–15; 8:45 am] BILLING CODE 4710–06–P SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing Susquehanna River Basin Commission. ACTION: Notice. AGENCY: The Susquehanna River Basin Commission will hold a public hearing on April 30, 2015, in Grantville, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled asabaliauskas on DSK5VPTVN1PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:49 Apr 02, 2015 Jkt 235001 for June 4, 2015, which will be noticed separately. The Commission will also hear testimony on amending its Regulatory Program Fee Schedule. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is May 11, 2015. DATES: The public hearing will convene on April 30, 2015, at 7:00 p.m. The public hearing will end at 9:00 p.m. or at the conclusion of public testimony, whichever is sooner. The deadline for the submission of written comments is May 11, 2015. ADDRESSES: The public hearing will be conducted at the Holiday Inn Harrisburg-Hershey, Grande 1 Room, 604 Station Road (Exit 80 off I–81), Grantville, Pa. FOR FURTHER INFORMATION CONTACT: Jason Oyler, Regulatory Counsel, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436. Information concerning the applications for these projects is available at the SRBC Water Resource Portal at www.srbc.net/wrp. Additional supporting documents are available to inspect and copy in accordance with the Commission’s Access to Records Policy at www.srbc.net/pubinfo/docs/2009-02_ Access_to_Records_Policy_ 20140115.pdf. SUPPLEMENTARY INFORMATION: The public hearing will cover amendments to its Regulatory Program Fee Schedule, as posted on the SRBC Public Participation Center Web page at www.srbc.net/pubinfo/ publicparticipation.htm. The public hearing will cover the following projects: Projects Scheduled for Action 1. Project Sponsor and Facility: Anadarko E&P Onshore LLC (Pine Creek), McHenry Township, Lycoming County, Pa. Application for renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20110601). 2. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Meshoppen Creek), Washington Township, Wyoming County, Pa. Application for renewal of surface water withdrawal of up to 2.160 mgd (peak day) (Docket No. 20110603). 3. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Unnamed Tributary to Middle Branch Wyalusing Creek), Forest Lake Township, Susquehanna County, Pa. Application for renewal of surface water withdrawal of up to 0.648 mgd (peak day) (Docket No. 20110605). PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 4. Project Sponsor and Facility: Chetremon Golf Course, LLC, Burnside Township, Clearfield County, Pa. Application for consumptive water use of up to 0.200 mgd (peak day). 5. Project Sponsor and Facility: Chetremon Golf Course, LLC (Irrigation Storage Pond), Burnside Township, Clearfield County, Pa. Application for surface water withdrawal of up to 0.200 mgd (peak day). 6. Project Sponsor and Facility: Chief Oil & Gas LLC (Loyalsock Creek), Forksville Borough, Sullivan County, Pa. Application for surface water withdrawal of up to 2.000 mgd (peak day). 7. Project Sponsor and Facility: Constitution Pipeline Company, LLC (Charlotte Creek), Town of Davenport, Delaware County, N.Y. Application for surface water withdrawal of up to 2.160 mgd (peak day). 8. Project Sponsor and Facility: Constitution Pipeline Company, LLC (Ouleout Creek), Town of Sidney, Delaware County, N.Y. Application for surface water withdrawal of up to 1.928 mgd (peak day). 9. Project Sponsor and Facility: Constitution Pipeline Company, LLC (Starrucca Creek), Harmony Township, Susquehanna County, Pa. Application for surface water withdrawal of up to 2.052 mgd (peak day). 10. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, Pa. Modification to add a source to the consumptive water use approval (no increase requested in current consumptive water use quantity) (Docket No. 20130608). 11. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, Pa. Application for groundwater withdrawal of up to 0.504 mgd (30-day average) from Well 10. 12. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg Borough, Tioga County, Pa. Application for renewal of groundwater withdrawal of up to 0.216 mgd (30-day average) from Well HR–1 (Docket No. 20110612). 13. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg Borough, Tioga County, Pa. Application for renewal of consumptive water use of up to 0.316 mgd (peak day) (Docket No. 20110612). 14. Project Sponsor and Facility: Keister Miller Investments, LLC (West Branch Susquehanna River), Mahaffey Borough, Clearfield County, Pa. Application for surface water withdrawal of up to 2.000 mgd (peak day). E:\FR\FM\03APN1.SGM 03APN1 asabaliauskas on DSK5VPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 64 / Friday, April 3, 2015 / Notices 15. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Driftwood Branch Sinnemahoning Creek), Emporium Borough, Cameron County, Pa. Application for renewal of surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 20110614). 16. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Application for renewal of surface water withdrawal of up to 1.250 mgd (peak day) (Docket No. 20110616). 17. Project Sponsor and Facility: Millersville University of Pennsylvania, Millersville Borough, Lancaster County, Pa. Application for consumptive water use of up to 0.080 mgd (peak day). 18. Project Sponsor and Facility: Millersville University of Pennsylvania, Millersville Borough, Lancaster County, Pa. Application for groundwater withdrawal of up to 0.320 mgd (30-day average) from Well 1. 19. Project Sponsor and Facility: Nature’s Way Purewater Systems, Inc., Dupont Borough, Luzerne County, Pa. Modification to increase consumptive water use by an additional 0.092 mgd (peak day), for a total of up to 0.349 mgd (peak day) (Docket No. 20110618). 20. Project Sponsor: Pennsylvania Department of Environmental Protection—South-central Regional Office, City of Harrisburg, Dauphin County, Pa. Facility Location: Leacock Township, Lancaster County, Pa. Application for groundwater withdrawal of up to 0.590 mgd (30-day average) from Stoltzfus Well. 21. Project Sponsor: Pennsylvania Department of Environmental Protection—South-central Regional Office, City of Harrisburg, Dauphin County, Pa. Facility Location: Leacock Township, Lancaster County, Pa. Application for groundwater withdrawal of up to 0.432 mgd (30-day average) from Township Well. 22. Project Sponsor and Facility: Shrewsbury Borough, York County, Pa. Application for renewal and modification to increase groundwater withdrawal by an additional 0.024 mgd (30-day average), for a total of up to 0.089 mgd (30-day average) from the Blouse Well (Docket No. 19820103). 23. Project Sponsor and Facility: Shrewsbury Borough, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.099 mgd (30-day average) from the Smith Well (Docket No. 19811203). 24. Project Sponsor and Facility: Talisman Energy USA Inc. (Wappasening Creek), Windham Township, Bradford County, Pa. Application for renewal of surface water VerDate Sep<11>2014 17:49 Apr 02, 2015 Jkt 235001 withdrawal of up to 1.000 mgd (peak day) (Docket No. 20110621). 25. Project Sponsor: UGI Development Company. Project Facility: Hunlock Creek Energy Center, Hunlock Township, Luzerne County, Pa. Modification to increase consumptive water use by an additional 1.526 mgd (peak day), for a total of up to 2.396 mgd (peak day) (Docket No. 20090916). Request for Waiver of Application and Approval of Transfer 1. Augusta Water, Inc. request for waiver of application required by 18 CFR 806.6(d)(1) and transfer of Docket No. 20021014. Opportunity To Appear and Comment Interested parties may appear at the hearing to offer comments to the Commission on the amended fee schedule or any project listed above. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Ground rules will be posted on the Commission’s Web site, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement such rules at the hearing. Written comments on any project listed above may also be mailed to Mr. Jason Oyler, Regulatory Counsel, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, Pa. 17110–1788, or submitted electronically through www.srbc.net/pubinfo/ publicparticipation.htm. Comments mailed or electronically submitted must be received by the Commission on or before May 11, 2015, to be considered. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: March 27, 2015. Stephanie L. Richardson, Secretary to the Commission. [FR Doc. 2015–07668 Filed 4–2–15; 8:45 am] BILLING CODE 7040–01– P TENNESSEE VALLEY AUTHORITY Meeting of the Regional Energy Resource Council and Public Session With the TVA Board Tennessee Valley Authority (TVA). ACTION: Notice of meeting and public session. AGENCY: The TVA Regional Energy Resource Council (RERC) will hold a meeting on Monday, April 20 and Tuesday April 21, 2015, regarding regional energy related issues in the SUMMARY: PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 18277 Tennessee Valley. In conjunction with the meeting, the RERC will join the TVA Board in a public session on April 20 to hear viewpoints from stakeholders regarding TVA’s recently released Draft 2015 Integrated Resource Plan (IRP) and associated Supplemental Environmental Impact Statement (SEIS). The RERC was established to advise TVA on its energy resource activities and the priorities among competing objectives and values. Notice of this meeting is given under the Federal Advisory Committee Act (FACA), 5 U.S.C. App. 2, and TVA’s procedures implementing the National Environmental Policy Act, 42 U.S.C. 4321 to 4370h. The meeting agenda includes the following: 1. Welcome and Introductions 2. Recap of February 2015 meeting 3. Presentations and discussion regarding TVA’s Draft IRP and Draft SEIS, public comments and feedback, and TVA’s response strategy 4. Panel discussions related to energy efficiency, renewables, and IRP implementation 5. Public Comments 6. Council discussion After panel presentations and discussions on April 20, members of the public will have the opportunity to comment on the Draft IRP and associated SEIS to the RERC and TVA Board. The public comment period will be approximately one hour and is scheduled to start at 3:15 and terminate at 4:15 (CDT), Monday, April 20, 2015. Participation in the public comment period of the meeting will be available on a first-come, first-served basis. Speakers will be limited to three (3) minutes in order to allow as many people as possible to participate. You can register to speak on TVA’s Board Web site until noon (CDT) on Friday April 19. In addition, you can register at the door on April 20 before 2:15 (CDT). Comments also can be submitted by mail to the Regional Energy Resource Council, Tennessee Valley Authority, 400 West Summit Hill Drive, WT–9D, Knoxville, Tennessee 37902; to Charles P. Nicholson, NEPA Project Manager, Tennessee Valley Authority, 400 West Summit Hill Dr., WT–11D, Knoxville, TN 37902; by email to IRP@tva.gov; or online via https://www.tva.gov/irp. All comments, oral and written, including names and addresses, will become part of the administrative record associated with TVA’s IRP and SEIS review and will be available for public inspection. Comments must be received no later than April 27, 2015, to be considered. E:\FR\FM\03APN1.SGM 03APN1

Agencies

[Federal Register Volume 80, Number 64 (Friday, April 3, 2015)]
[Notices]
[Pages 18276-18277]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07668]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on April 30, 2015, in Grantville, Pennsylvania. At this public 
hearing, the Commission will hear testimony on the projects listed in 
the Supplementary Information section of this notice. Such projects are 
intended to be scheduled for Commission action at its next business 
meeting, tentatively scheduled for June 4, 2015, which will be noticed 
separately. The Commission will also hear testimony on amending its 
Regulatory Program Fee Schedule. The public should take note that this 
public hearing will be the only opportunity to offer oral comment to 
the Commission for the listed projects. The deadline for the submission 
of written comments is May 11, 2015.

DATES: The public hearing will convene on April 30, 2015, at 7:00 p.m. 
The public hearing will end at 9:00 p.m. or at the conclusion of public 
testimony, whichever is sooner. The deadline for the submission of 
written comments is May 11, 2015.

ADDRESSES: The public hearing will be conducted at the Holiday Inn 
Harrisburg-Hershey, Grande 1 Room, 604 Station Road (Exit 80 off I-81), 
Grantville, Pa.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, Regulatory Counsel, 
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436.
    Information concerning the applications for these projects is 
available at the SRBC Water Resource Portal at www.srbc.net/wrp. 
Additional supporting documents are available to inspect and copy in 
accordance with the Commission's Access to Records Policy at 
www.srbc.net/pubinfo/docs/2009-02_Access_to_Records_Policy_20140115.pdf.

SUPPLEMENTARY INFORMATION: The public hearing will cover amendments to 
its Regulatory Program Fee Schedule, as posted on the SRBC Public 
Participation Center Web page at www.srbc.net/pubinfo/publicparticipation.htm. The public hearing will cover the following 
projects:

Projects Scheduled for Action

    1. Project Sponsor and Facility: Anadarko E&P Onshore LLC (Pine 
Creek), McHenry Township, Lycoming County, Pa. Application for renewal 
of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 
20110601).
    2. Project Sponsor and Facility: Carrizo (Marcellus), LLC 
(Meshoppen Creek), Washington Township, Wyoming County, Pa. Application 
for renewal of surface water withdrawal of up to 2.160 mgd (peak day) 
(Docket No. 20110603).
    3. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Unnamed 
Tributary to Middle Branch Wyalusing Creek), Forest Lake Township, 
Susquehanna County, Pa. Application for renewal of surface water 
withdrawal of up to 0.648 mgd (peak day) (Docket No. 20110605).
    4. Project Sponsor and Facility: Chetremon Golf Course, LLC, 
Burnside Township, Clearfield County, Pa. Application for consumptive 
water use of up to 0.200 mgd (peak day).
    5. Project Sponsor and Facility: Chetremon Golf Course, LLC 
(Irrigation Storage Pond), Burnside Township, Clearfield County, Pa. 
Application for surface water withdrawal of up to 0.200 mgd (peak day).
    6. Project Sponsor and Facility: Chief Oil & Gas LLC (Loyalsock 
Creek), Forksville Borough, Sullivan County, Pa. Application for 
surface water withdrawal of up to 2.000 mgd (peak day).
    7. Project Sponsor and Facility: Constitution Pipeline Company, LLC 
(Charlotte Creek), Town of Davenport, Delaware County, N.Y. Application 
for surface water withdrawal of up to 2.160 mgd (peak day).
    8. Project Sponsor and Facility: Constitution Pipeline Company, LLC 
(Ouleout Creek), Town of Sidney, Delaware County, N.Y. Application for 
surface water withdrawal of up to 1.928 mgd (peak day).
    9. Project Sponsor and Facility: Constitution Pipeline Company, LLC 
(Starrucca Creek), Harmony Township, Susquehanna County, Pa. 
Application for surface water withdrawal of up to 2.052 mgd (peak day).
    10. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, Pa. Modification to add a source to 
the consumptive water use approval (no increase requested in current 
consumptive water use quantity) (Docket No. 20130608).
    11. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, Pa. Application for groundwater 
withdrawal of up to 0.504 mgd (30-day average) from Well 10.
    12. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg 
Borough, Tioga County, Pa. Application for renewal of groundwater 
withdrawal of up to 0.216 mgd (30-day average) from Well HR-1 (Docket 
No. 20110612).
    13. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg 
Borough, Tioga County, Pa. Application for renewal of consumptive water 
use of up to 0.316 mgd (peak day) (Docket No. 20110612).
    14. Project Sponsor and Facility: Keister Miller Investments, LLC 
(West Branch Susquehanna River), Mahaffey Borough, Clearfield County, 
Pa. Application for surface water withdrawal of up to 2.000 mgd (peak 
day).

[[Page 18277]]

    15. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (Driftwood Branch Sinnemahoning Creek), Emporium Borough, Cameron 
County, Pa. Application for renewal of surface water withdrawal of up 
to 0.999 mgd (peak day) (Docket No. 20110614).
    16. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Application 
for renewal of surface water withdrawal of up to 1.250 mgd (peak day) 
(Docket No. 20110616).
    17. Project Sponsor and Facility: Millersville University of 
Pennsylvania, Millersville Borough, Lancaster County, Pa. Application 
for consumptive water use of up to 0.080 mgd (peak day).
    18. Project Sponsor and Facility: Millersville University of 
Pennsylvania, Millersville Borough, Lancaster County, Pa. Application 
for groundwater withdrawal of up to 0.320 mgd (30-day average) from 
Well 1.
    19. Project Sponsor and Facility: Nature's Way Purewater Systems, 
Inc., Dupont Borough, Luzerne County, Pa. Modification to increase 
consumptive water use by an additional 0.092 mgd (peak day), for a 
total of up to 0.349 mgd (peak day) (Docket No. 20110618).
    20. Project Sponsor: Pennsylvania Department of Environmental 
Protection--South-central Regional Office, City of Harrisburg, Dauphin 
County, Pa. Facility Location: Leacock Township, Lancaster County, Pa. 
Application for groundwater withdrawal of up to 0.590 mgd (30-day 
average) from Stoltzfus Well.
    21. Project Sponsor: Pennsylvania Department of Environmental 
Protection--South-central Regional Office, City of Harrisburg, Dauphin 
County, Pa. Facility Location: Leacock Township, Lancaster County, Pa. 
Application for groundwater withdrawal of up to 0.432 mgd (30-day 
average) from Township Well.
    22. Project Sponsor and Facility: Shrewsbury Borough, York County, 
Pa. Application for renewal and modification to increase groundwater 
withdrawal by an additional 0.024 mgd (30-day average), for a total of 
up to 0.089 mgd (30-day average) from the Blouse Well (Docket No. 
19820103).
    23. Project Sponsor and Facility: Shrewsbury Borough, York County, 
Pa. Application for renewal of groundwater withdrawal of up to 0.099 
mgd (30-day average) from the Smith Well (Docket No. 19811203).
    24. Project Sponsor and Facility: Talisman Energy USA Inc. 
(Wappasening Creek), Windham Township, Bradford County, Pa. Application 
for renewal of surface water withdrawal of up to 1.000 mgd (peak day) 
(Docket No. 20110621).
    25. Project Sponsor: UGI Development Company. Project Facility: 
Hunlock Creek Energy Center, Hunlock Township, Luzerne County, Pa. 
Modification to increase consumptive water use by an additional 1.526 
mgd (peak day), for a total of up to 2.396 mgd (peak day) (Docket No. 
20090916).

Request for Waiver of Application and Approval of Transfer

    1. Augusta Water, Inc. request for waiver of application required 
by 18 CFR 806.6(d)(1) and transfer of Docket No. 20021014.

Opportunity To Appear and Comment

    Interested parties may appear at the hearing to offer comments to 
the Commission on the amended fee schedule or any project listed above. 
The presiding officer reserves the right to limit oral statements in 
the interest of time and to otherwise control the course of the 
hearing. Ground rules will be posted on the Commission's Web site, 
www.srbc.net, prior to the hearing for review. The presiding officer 
reserves the right to modify or supplement such rules at the hearing. 
Written comments on any project listed above may also be mailed to Mr. 
Jason Oyler, Regulatory Counsel, Susquehanna River Basin Commission, 
4423 North Front Street, Harrisburg, Pa. 17110-1788, or submitted 
electronically through www.srbc.net/pubinfo/publicparticipation.htm. 
Comments mailed or electronically submitted must be received by the 
Commission on or before May 11, 2015, to be considered.

    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: March 27, 2015.
Stephanie L. Richardson,