Public Hearing, 43961-43962 [2013-17431]
Download as PDF
Federal Register / Vol. 78, No. 140 / Monday, July 22, 2013 / Notices
Section 1 of the State Department Basic
Authorities Act, as amended (22 U.S.C.
2651a), and the Iran Threat Reduction
and Syria Human Rights Act of 2012
(Pub. L. 112–158) (the Act), I hereby
delegate to the Assistant Secretary of
State for Consular Affairs, to the extent
authorized by law, the authority to
determine that a citizen of Iran is
seeking to enter the United States to
participate in coursework to prepare for
a career in the energy sector of Iran or
in nuclear science or nuclear
engineering or a related field in Iran, as
provided under section 501(a) of the
Act. This authority may be re-delegated.
Any act, executive order, regulation,
or procedure subject to, or affected by,
this delegation shall be deemed to be
such act, executive order, regulation, or
procedure as amended from time to
time.
Notwithstanding this delegation of
authority, the Secretary, the Deputy
Secretary, the Deputy Secretary for
Management and Resources, and the
Under Secretary for Management, may
at any time exercise any authority or
function delegated by this delegation of
authority.
This delegation of authority shall be
published in the Federal Register.
Dated: March 13, 2013.
John Forbes Kerry,
Secretary of State.
[FR Doc. 2013–17534 Filed 7–19–13; 8:45 am]
BILLING CODE 4710–06–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on August 15, 2013, in Harrisburg,
Pennsylvania. At this public hearing,
the Commission will hear testimony on
the projects listed in the Supplementary
Information section of this notice. Such
projects are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
for September 19, 2013, which will be
noticed separately. The public should
take note that this public hearing will be
the only opportunity to offer oral
comment to the Commission for the
listed projects. The deadline for the
submission of written comments is
August 26, 2013.
DATES: The public hearing will convene
on August 15, 2013, at 1:00 p.m. The
tkelley on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:15 Jul 19, 2013
Jkt 229001
public hearing will end at 2:45 p.m. or
at the conclusion of public testimony,
whichever is sooner. The deadline for
the submission of written comments is
August 26, 2013.
ADDRESSES: The public hearing will be
conducted at the Pennsylvania State
Capitol, Room 8E–B, East Wing,
Commonwealth Avenue, Harrisburg, Pa.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436. Information concerning
the applications for these projects is
available at the SRBC Water Resource
Portal at www.srbc.net/wrp. Materials
and supporting documents are available
to inspect and copy in accordance with
the Commission’s Access to Records
Policy at www.srbc.net/pubinfo/docs/
2009-02%20Access%20to%20Records
%20Policy%209-10-09.PDF.
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on any project listed
below. The presiding officer reserves the
right to limit oral statements in the
interest of time and to otherwise control
the course of the hearing. Ground rules
will be posted on the Commission’s
Web site, www.srbc.net, prior to the
hearing for review. The presiding officer
reserves the right to modify or
supplement such rules at the hearing.
Written comments on any project listed
below may also be mailed to Mr.
Richard Cairo, General Counsel,
Susquehanna River Basin Commission,
1721 North Front Street, Harrisburg, PA
17102–2391 (beginning July 29, 2013,
the Commission’s address is 4423 North
Front Street, Harrisburg, PA 17110–
1788), or submitted electronically
through https://www.srbc.net/pubinfo/
publicparticipation.htm. Comments
mailed or electronically submitted must
be received by the Commission on or
before August 26, 2013, to be
considered.
The
public hearing will cover the following
projects:
SUPPLEMENTARY INFORMATION:
Projects Scheduled for Rescission
Action
1. Project Sponsor and Facility:
Chevron Appalachia, LLC (Cambria
Somerset Authority), Summerhill
Township, Cambria County, PA (Docket
No. 20110630).
2. Project Sponsor and Facility:
Chevron Appalachia, LLC (Highland
Sewer and Water Authority), Portage
Township, Cambria County, PA (Docket
No. 20110631).
PO 00000
Frm 00114
Fmt 4703
Sfmt 4703
43961
Projects Scheduled for Action
1. Project Sponsor and Facility:
Borough of Akron, Lancaster County,
PA. Application for renewal of
groundwater withdrawal of up to 0.396
mgd (30-day average) from Well 5A
(Docket No. 19811201).
2. Project Sponsor and Facility:
Borough of Akron, Lancaster County,
PA. Application for renewal of
groundwater withdrawal of up to 0.166
mgd (30-day average) from Well 6
(Docket No. 19820101).
3. Project Sponsor and Facility:
Borough of Akron, Lancaster County,
PA. Application for renewal of
groundwater withdrawal of up to 0.187
mgd (30-day average) from Well 8
(Docket No. 19820101).
4. Project Sponsor and Facility: Aqua
Infrastructure, LLC (Tioga River),
Hamilton Township, Tioga County, PA.
Application for surface water
withdrawal of up to 2.500 mgd (peak
day).
5. Project Sponsor and Facility:
Bending River Estates (Tioga River),
Town of Lindley, Steuben County, NY.
Application for surface water
withdrawal of up to 0.400 mgd (peak
day).
6. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Meshoppen
Creek), Lemon Township, Wyoming
County, PA. Modification to increase
surface water withdrawal by an
additional 0.446 mgd (peak day), for a
total of 0.500 mgd (peak day) (Docket
No. 20121202).
7. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Meshoppen
Creek), Springville Township,
Susquehanna County, PA. Application
for surface water withdrawal of up to
0.500 mgd (peak day).
8. Project Sponsor and Facility:
Chesapeake Appalachia, LLC (Chemung
River), Athens Township, Bradford
County, PA. Application for renewal of
surface water withdrawal of up to 0.999
mgd (peak day) (Docket No. 20090603).
9. Project Sponsor and Facility:
Chesapeake Appalachia, LLC (Sugar
Creek), Burlington Township, Bradford
County, PA. Application for renewal of
surface water withdrawal of up to 0.499
mgd (peak day) (Docket No. 20090604).
10. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River), Athens Township,
Bradford County, PA. Application for
renewal of surface water withdrawal of
up to 1.440 mgd (peak day) (Docket No.
20080906).
11. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River), Terry Township,
Bradford County, PA. Application for
E:\FR\FM\22JYN1.SGM
22JYN1
tkelley on DSK3SPTVN1PROD with NOTICES
43962
Federal Register / Vol. 78, No. 140 / Monday, July 22, 2013 / Notices
renewal of surface water withdrawal of
up to 1.440 mgd (peak day) (Docket No.
20090605).
12. Project Sponsor and Facility: DS
Waters of America, Inc., Clay Township,
Lancaster County, PA. Application for
renewal of groundwater withdrawal of
up to 0.115 mgd (30-day average) from
Well 6 (Docket No. 20000203).
13. Project Sponsor and Facility:
Town of Erwin, City of Corning,
Steuben County, NY. Application for
groundwater withdrawal of up to 0.504
mgd (30-day average) from Well 5R.
14. Project Sponsor and Facility:
Global Tungsten & Powders Corp.,
Towanda Borough, Bradford County,
PA. Application for groundwater
withdrawal of up to 4.800 mgd (30-day
average) from a Well Field (Wells 1, 2,
6, 7, 8, 9, 10, 11, and 12).
15. Project Sponsor and Facility:
Houtzdale Municipal Authority, Gulich
Township, Clearfield County, PA.
Application for groundwater
withdrawal of up to 0.537 mgd (30-day
average) from Well 14R.
16. Project Sponsor and Facility: LHP
Management, LLC (Fishing Creek—
Clinton Country Club), Bald Eagle
Township, Clinton County, PA.
Application for renewal of surface water
withdrawal of up to 0.999 mgd (peak
day) (Docket No. 20090906).
17. Project Sponsor and Facility:
Millersburg Area Authority, Upper
Paxton Township, Dauphin County, PA.
Application for renewal of groundwater
withdrawal of up to 0.173 mgd (30-day
average) from Well 10 (Docket No.
19830309).
18. Project Sponsor and Facility:
Millersburg Area Authority, Upper
Paxton Township, Dauphin County, PA.
Application for renewal of groundwater
withdrawal of up to 0.187 mgd (30-day
average) from Well 11 (Docket No.
19830309).
19. Project Sponsor and Facility:
Southwestern Energy Production
Company (Wyalusing Creek), Wyalusing
Township, Bradford County, PA.
Application for renewal of surface water
withdrawal with modification to
increase by an additional 0.500 mgd
(peak day), for a total of 2.000 mgd
(peak day) (Docket No. 20090914).
20. Project Sponsor and Facility: State
College Borough Water Authority,
Ferguson Township, Centre County, PA.
Application for renewal of groundwater
withdrawal of up to 0.432 mgd (30-day
average) from Well 41 (Docket No.
19820501).
21. Project Sponsor and Facility: State
College Borough Water Authority,
Ferguson Township, Centre County, PA.
Application for renewal of groundwater
withdrawal of up to 1.440 mgd (30-day
VerDate Mar<15>2010
18:15 Jul 19, 2013
Jkt 229001
average) from Well 43 (Docket No.
19820501).
22. Project Sponsor and Facility: State
College Borough Water Authority,
Ferguson Township, Centre County, PA.
Application for renewal of groundwater
withdrawal of up to 1.720 mgd (30-day
average) from Well 53 (Docket No.
19820501).
23. Project Sponsor and Facility:
Susquehanna Gas Field Services, L.L.C.
(Meshoppen Creek), Meshoppen
Borough, Wyoming County, PA.
Application for renewal of surface water
withdrawal of up to 0.145 mgd (peak
day) (Docket No. 20090628).
24. Project Sponsor: SWEPI LP (Tioga
River), Richmond Township, Tioga
County, PA. Application for renewal of
surface water withdrawal with
modification to increase by an
additional 0.843 mgd (peak day), for a
total of 0.950 mgd (peak day) (Docket
No. 20090612).
25. Project Sponsor and Facility:
Winner Water Services, Inc. (Manor #44
Deep Mine), Girard Township,
Clearfield County, PA. Application for
surface water withdrawal of up to 0.144
mgd (peak day).
Project Scheduled for Action Involving
a Diversion
1. Project Sponsor: Winner Water
Services, Inc. Project Facility: Sykesville
Mine AMD, Borough of Sykesville,
Jefferson County, PA. Application for an
into-basin diversion of up to 1.000 mgd
from the Ohio River Basin.
Authority: Public Law 91–575, 84 Stat.
1509 et seq., 18 CFR Parts 806–808.
Dated: July 12, 2013.
Paul O. Swartz,
Executive Director.
[FR Doc. 2013–17431 Filed 7–19–13; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Meeting: RTCA Program Management
Committee
Federal Aviation
Administration (FAA), U.S. Department
of Transportation (DOT).
ACTION: Notice of RTCA Program
Management Committee Meeting.
AGENCY:
The FAA is issuing this notice
to advise the public of a meeting of
RTCA Program Management Committee.
DATES: The meeting will be held August
12, from 10:00 a.m.–2:00 p.m.
ADDRESSES: The meeting will be held at
RTCA, Inc., 1150 18th Street NW., Suite
910, Washington, DC 20036.
The
RTCA Secretariat, 1150 18th Street NW.,
Suite 910, Washington, DC 20036, or by
telephone at (202) 833–9339, fax at (202)
833–9434, or Web site at https://
www.rtca.org.
SUPPLEMENTARY INFORMATION: Pursuant
to section 10(a)(2) of the Federal
Advisory Committee Act (Pub. L. 92–
463, 5 U.S.C., App.), notice is hereby
given for a Program Management
Committee meeting. The agenda will
include the following:
FOR FURTHER INFORMATION CONTACT:
Aug 12, 2013
• Welcome and Introductions.
• Review/Approve Meeting Summary.
• June 19, 2013, RTCA Paper no. 137–
13/PMC–1106
• Action Item Review
• SC–214—Standards for Air Traffic
Data Communication ServicesDiscussion-Review/Approve Terms
of Reference Revision 5–RTCA
Paper No. 134–13/PMC–1103.
• Include 4D trajectory with dynamic
RNP, fixed radius transitions,
advanced interval management, and
transmission of ATC winds into the
operational capabilities of the
message set for Baseline 2.
• Extend the completion dates from
January 2014 to March 2015 for
Baseline 2-Interoperability
Standards.
• Other Business.
• Schedule for Committee Deliverables
and Next Meeting Date.
• Adjourn.
Attendance is open to the interested
public but limited to space availability.
With the approval of the chairman,
members of the public may present oral
statements at the meeting.
Persons wishing to present statements
or obtain information should contact the
person listed in the FOR FURTHER
INFORMATION CONTACT section. Members
of the public may present a written
statement to the committee at any time.
Issued in Washington, DC, on June 28,
2013.
Paige Williams,
Management Analyst, NextGen, Business
Operations Group, Federal Aviation
Administration.
[FR Doc. 2013–17564 Filed 7–19–13; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
SUMMARY:
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
Federal Aviation Administration
Meeting: Cancellation of RTCA
Program Management Committee
Federal Aviation
Administration (FAA), U.S. Department
of Transportation (DOT).
AGENCY:
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 78, Number 140 (Monday, July 22, 2013)]
[Notices]
[Pages 43961-43962]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-17431]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on August 15, 2013, in Harrisburg, Pennsylvania. At this public
hearing, the Commission will hear testimony on the projects listed in
the Supplementary Information section of this notice. Such projects are
intended to be scheduled for Commission action at its next business
meeting, tentatively scheduled for September 19, 2013, which will be
noticed separately. The public should take note that this public
hearing will be the only opportunity to offer oral comment to the
Commission for the listed projects. The deadline for the submission of
written comments is August 26, 2013.
DATES: The public hearing will convene on August 15, 2013, at 1:00 p.m.
The public hearing will end at 2:45 p.m. or at the conclusion of public
testimony, whichever is sooner. The deadline for the submission of
written comments is August 26, 2013.
ADDRESSES: The public hearing will be conducted at the Pennsylvania
State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg,
Pa.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436. Information
concerning the applications for these projects is available at the SRBC
Water Resource Portal at www.srbc.net/wrp. Materials and supporting
documents are available to inspect and copy in accordance with the
Commission's Access to Records Policy at www.srbc.net/pubinfo/docs/2009-02%20Access%20to%20Records%20Policy%209-10-09.PDF.
Opportunity To Appear and Comment
Interested parties may appear at the hearing to offer comments to
the Commission on any project listed below. The presiding officer
reserves the right to limit oral statements in the interest of time and
to otherwise control the course of the hearing. Ground rules will be
posted on the Commission's Web site, www.srbc.net, prior to the hearing
for review. The presiding officer reserves the right to modify or
supplement such rules at the hearing. Written comments on any project
listed below may also be mailed to Mr. Richard Cairo, General Counsel,
Susquehanna River Basin Commission, 1721 North Front Street,
Harrisburg, PA 17102-2391 (beginning July 29, 2013, the Commission's
address is 4423 North Front Street, Harrisburg, PA 17110-1788), or
submitted electronically through https://www.srbc.net/pubinfo/publicparticipation.htm. Comments mailed or electronically submitted
must be received by the Commission on or before August 26, 2013, to be
considered.
SUPPLEMENTARY INFORMATION: The public hearing will cover the following
projects:
Projects Scheduled for Rescission Action
1. Project Sponsor and Facility: Chevron Appalachia, LLC (Cambria
Somerset Authority), Summerhill Township, Cambria County, PA (Docket
No. 20110630).
2. Project Sponsor and Facility: Chevron Appalachia, LLC (Highland
Sewer and Water Authority), Portage Township, Cambria County, PA
(Docket No. 20110631).
Projects Scheduled for Action
1. Project Sponsor and Facility: Borough of Akron, Lancaster
County, PA. Application for renewal of groundwater withdrawal of up to
0.396 mgd (30-day average) from Well 5A (Docket No. 19811201).
2. Project Sponsor and Facility: Borough of Akron, Lancaster
County, PA. Application for renewal of groundwater withdrawal of up to
0.166 mgd (30-day average) from Well 6 (Docket No. 19820101).
3. Project Sponsor and Facility: Borough of Akron, Lancaster
County, PA. Application for renewal of groundwater withdrawal of up to
0.187 mgd (30-day average) from Well 8 (Docket No. 19820101).
4. Project Sponsor and Facility: Aqua Infrastructure, LLC (Tioga
River), Hamilton Township, Tioga County, PA. Application for surface
water withdrawal of up to 2.500 mgd (peak day).
5. Project Sponsor and Facility: Bending River Estates (Tioga
River), Town of Lindley, Steuben County, NY. Application for surface
water withdrawal of up to 0.400 mgd (peak day).
6. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Meshoppen Creek), Lemon Township, Wyoming County, PA. Modification to
increase surface water withdrawal by an additional 0.446 mgd (peak
day), for a total of 0.500 mgd (peak day) (Docket No. 20121202).
7. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Meshoppen Creek), Springville Township, Susquehanna County, PA.
Application for surface water withdrawal of up to 0.500 mgd (peak day).
8. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Chemung River), Athens Township, Bradford County, PA. Application for
renewal of surface water withdrawal of up to 0.999 mgd (peak day)
(Docket No. 20090603).
9. Project Sponsor and Facility: Chesapeake Appalachia, LLC (Sugar
Creek), Burlington Township, Bradford County, PA. Application for
renewal of surface water withdrawal of up to 0.499 mgd (peak day)
(Docket No. 20090604).
10. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River), Athens Township, Bradford County, PA. Application
for renewal of surface water withdrawal of up to 1.440 mgd (peak day)
(Docket No. 20080906).
11. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River), Terry Township, Bradford County, PA. Application
for
[[Page 43962]]
renewal of surface water withdrawal of up to 1.440 mgd (peak day)
(Docket No. 20090605).
12. Project Sponsor and Facility: DS Waters of America, Inc., Clay
Township, Lancaster County, PA. Application for renewal of groundwater
withdrawal of up to 0.115 mgd (30-day average) from Well 6 (Docket No.
20000203).
13. Project Sponsor and Facility: Town of Erwin, City of Corning,
Steuben County, NY. Application for groundwater withdrawal of up to
0.504 mgd (30-day average) from Well 5R.
14. Project Sponsor and Facility: Global Tungsten & Powders Corp.,
Towanda Borough, Bradford County, PA. Application for groundwater
withdrawal of up to 4.800 mgd (30-day average) from a Well Field (Wells
1, 2, 6, 7, 8, 9, 10, 11, and 12).
15. Project Sponsor and Facility: Houtzdale Municipal Authority,
Gulich Township, Clearfield County, PA. Application for groundwater
withdrawal of up to 0.537 mgd (30-day average) from Well 14R.
16. Project Sponsor and Facility: LHP Management, LLC (Fishing
Creek--Clinton Country Club), Bald Eagle Township, Clinton County, PA.
Application for renewal of surface water withdrawal of up to 0.999 mgd
(peak day) (Docket No. 20090906).
17. Project Sponsor and Facility: Millersburg Area Authority, Upper
Paxton Township, Dauphin County, PA. Application for renewal of
groundwater withdrawal of up to 0.173 mgd (30-day average) from Well 10
(Docket No. 19830309).
18. Project Sponsor and Facility: Millersburg Area Authority, Upper
Paxton Township, Dauphin County, PA. Application for renewal of
groundwater withdrawal of up to 0.187 mgd (30-day average) from Well 11
(Docket No. 19830309).
19. Project Sponsor and Facility: Southwestern Energy Production
Company (Wyalusing Creek), Wyalusing Township, Bradford County, PA.
Application for renewal of surface water withdrawal with modification
to increase by an additional 0.500 mgd (peak day), for a total of 2.000
mgd (peak day) (Docket No. 20090914).
20. Project Sponsor and Facility: State College Borough Water
Authority, Ferguson Township, Centre County, PA. Application for
renewal of groundwater withdrawal of up to 0.432 mgd (30-day average)
from Well 41 (Docket No. 19820501).
21. Project Sponsor and Facility: State College Borough Water
Authority, Ferguson Township, Centre County, PA. Application for
renewal of groundwater withdrawal of up to 1.440 mgd (30-day average)
from Well 43 (Docket No. 19820501).
22. Project Sponsor and Facility: State College Borough Water
Authority, Ferguson Township, Centre County, PA. Application for
renewal of groundwater withdrawal of up to 1.720 mgd (30-day average)
from Well 53 (Docket No. 19820501).
23. Project Sponsor and Facility: Susquehanna Gas Field Services,
L.L.C. (Meshoppen Creek), Meshoppen Borough, Wyoming County, PA.
Application for renewal of surface water withdrawal of up to 0.145 mgd
(peak day) (Docket No. 20090628).
24. Project Sponsor: SWEPI LP (Tioga River), Richmond Township,
Tioga County, PA. Application for renewal of surface water withdrawal
with modification to increase by an additional 0.843 mgd (peak day),
for a total of 0.950 mgd (peak day) (Docket No. 20090612).
25. Project Sponsor and Facility: Winner Water Services, Inc.
(Manor 44 Deep Mine), Girard Township, Clearfield County, PA.
Application for surface water withdrawal of up to 0.144 mgd (peak day).
Project Scheduled for Action Involving a Diversion
1. Project Sponsor: Winner Water Services, Inc. Project Facility:
Sykesville Mine AMD, Borough of Sykesville, Jefferson County, PA.
Application for an into-basin diversion of up to 1.000 mgd from the
Ohio River Basin.
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR
Parts 806-808.
Dated: July 12, 2013.
Paul O. Swartz,
Executive Director.
[FR Doc. 2013-17431 Filed 7-19-13; 8:45 am]
BILLING CODE 7040-01-P