withdrawal of up to 0.162 mgd (30-day
average) from Well 1.
17. Project Sponsor: Pennsylvania
Department of Environmental
Protection—South-central Regional
Office, City of Harrisburg, Dauphin
County, Pa. Facility Location: Leacock
Township, Lancaster County, Pa.
Application for groundwater
withdrawal of up to 0.590 mgd (30-day
average) from Stoltzfus Well.
18. Project Sponsor: Pennsylvania
Department of Environmental
Protection—South-central Regional
Office, City of Harrisburg, Dauphin
County, Pa. Facility Location: Leacock
Township, Lancaster County, Pa.
Application for groundwater
withdrawal of up to 0.432 mgd (30-day
average) from Township Well.
19. Project Sponsor and Facility:
Somerset Regional Water Resources,
LLC (Salt Lick Creek), New Milford
Township, Susquehanna County, Pa.
Application for renewal of surface water
withdrawal of up to 0.720 mgd (peak
day) (Docket No. 20100905).
20. Project Sponsor and Facility:
Sugar Hollow Trout Park and Hatchery,
Eaton Township, Wyoming County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.864 mgd (30-day
average) from Wells 1, 2, and 3 (the
Hatchery Well Field) (Docket No.
20100913).
21. Project Sponsor and Facility:
Sunbury Generation LP, Shamokin Dam
Borough and Monroe Township, Snyder
County, Pa. Modification to project
features and reduction of the surface
water withdrawal from 354.000 mgd
(peak day) to 10.000 mgd (peak day)
(Docket No. 20081222).
22. Project Sponsor and Facility:
Sunbury Generation LP, Shamokin Dam
Borough and Monroe Township, Snyder
County, Pa. Modification to project
features and reduction of the
consumptive water use from 8.000 mgd
(peak day) to 6.500 mgd (peak day)
(Docket No. 20081222).
23. Project Sponsor and Facility:
SWEPI LP (Cowanesque River), Nelson
Township, Tioga County, Pa.
Application for renewal of surface water
withdrawal of up to 0.533 mgd (peak
day) (Docket No. 20100604).
24. Project Sponsor and Facility:
Talisman Energy USA Inc.
(Susquehanna River), Terry Township,
Bradford County, Pa. Application for
renewal of surface water withdrawal of
up to 2.000 mgd (peak day) (Docket No.
20100613).
25. Project Sponsor and Facility:
Talisman Energy USA Inc.
(Wappasening Creek), Windham
Township, Bradford County, Pa.
Application for surface water
VerDate Mar<15>2010
20:23 Jul 10, 2014
Jkt 232001
withdrawal of up to 0.999 mgd (peak
day).
26. Project Sponsor and Facility:
Upper Halfmoon Water Company,
Halfmoon Township, Centre County, Pa.
Application for groundwater
withdrawal of up to 0.396 mgd (30-day
average) from Well 6.
27. Project Sponsor and Facility:
Warwick Township Municipal
Authority, Warwick Township,
Lancaster County, Pa. Application for
groundwater withdrawal of up to 0.288
mgd (30-day average) from Rothsville
Well 2.
Dated: July 3, 2014.
Stephanie L. Richardson,
Secretary to the Commission.
Public Hearing—Projects Scheduled for
Action Involving a Diversion
40189
SUMMARY:
1. Project Sponsor and Facility: City
of Aberdeen, Harford County, Md.
Modification to extend the approval
term of the out-of-basin diversion
approval (Docket No. 20021210) to be
coterminous with the revised Maryland
Department of the Environment State
Water Appropriation and Use Permit for
the Aberdeen Proving Ground-Aberdeen
Area.
2. Project Sponsor: DS Services of
America, Inc. Project Facility: Bethany
Children’s Home, Heidelberg Township,
Berks County, Pa. Application of intobasin diversion from the Delaware River
Basin of up to 0.200 mgd (peak day)
from Bethany Children’s Home bulk
spring water source (Boreholes PWA
and PWB).
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on any project listed above.
The presiding officer reserves the right
to limit oral statements in the interest of
time and to otherwise control the course
of the hearing. Ground rules will be
posted on the Commission’s Web site,
www.srbc.net, prior to the hearing for
review. The presiding officer reserves
the right to modify or supplement such
rules at the hearing. Written comments
on any project listed above may also be
mailed to Mr. Jason Oyler, Regulatory
Counsel, Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, Pa. 17110–1788, or
submitted electronically through https://
www.srbc.net/pubinfo/
publicparticipation.htm. Comments
mailed or electronically submitted must
be received by the Commission on or
before August 18, 2014, to be
considered.
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR Parts 806, 807, and 808.
PO 00000
Frm 00132
Fmt 4703
Sfmt 4703
[FR Doc. 2014–16286 Filed 7–10–14; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists the projects
approved by rule by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: May 1–31, 2014.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 1306;
fax: (717) 238–2436; email: rcairo@
srbc.net. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22(f) for
the time period specified above:
Approvals By Rule Issued Under 18
CFR 806.22(f)
1. Citrus Energy Corporation, Pad ID:
Procter and Gamble Mehoopany Plant
1V, ABR–20091014.R1, Washington
Township, Wyoming County, Pa.;
Consumptive Use of Up to 5.000 mgd;
Approval Date: May 1, 2014.
2. Anadarko E&P Onshore LLC, Pad
ID: C.O.P. TRACT 343 PAD C, ABR–
20090908.R1, Noyes Township, Clinton
County, Pa.; Consumptive Use of Up to
5.000 mgd; Approval Date: May 6, 2014.
3. Anadarko E&P Onshore LLC, Pad
ID: COP Tr 244 #1000H, ABR–
20090927.R1, Rush Township, Centre
County, Pa.; Consumptive Use of Up to
5.000 mgd; Approval Date: May 6, 2014.
4. Anadarko E&P Onshore LLC, Pad
ID: COP Tr 244 #1001H & #1002H,
ABR–20090928.R1, Rush Township,
Centre County, Pa.; Consumptive Use of
Up to 5.000 mgd; Approval Date: May
6, 2014.
5. Seneca Resources Corporation, Pad
ID: DCNR 595 Pad A, ABR–201405001,
Covington Township, Tioga County, Pa.;
Consumptive Use of Up to 4.000 mgd;
Approval Date: May 12, 2014.
E:\FR\FM\11JYN1.SGM
11JYN1
tkelley on DSK3SPTVN1PROD with NOTICES
40190
Federal Register / Vol. 79, No. 133 / Friday, July 11, 2014 / Notices
6. Chief Oil & Gas LLC, Pad ID:
Blanchard Drilling Pad, ABR–
201405002, McNett Township,
Lycoming County, Pa.; Consumptive
Use of Up to 2.500 mgd; Approval Date:
May 12, 2014.
7. Range Resources—Appalachia,
LLC, Pad ID: Cornwall B Unit, ABR–
201405003, Lewis Township, Lycoming
County, Pa.; Consumptive Use of Up to
5.000 mgd; Approval Date: May 12,
2014.
8. WPX Energy Appalachia, LLC, Pad
ID: Five E’s FLP Pad Site, ABR–
20090801.R1, Middletown Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 3.000 mgd; Approval Date:
May 13, 2014.
9. WPX Energy Appalachia, LLC, Pad
ID: Markovitch Pad Site, ABR–
20090828.R1, Bridgewater Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 3.999 mgd; Approval Date:
May 13, 2014.
10. Inflection Energy (PA), LLC, Pad
ID: TLC Pad, ABR–201405004, Eldred
Township, Lycoming County, Pa.;
Consumptive Use of Up to 4.000 mgd;
Approval Date: May 13, 2014.
11. Inflection Energy (PA), LLC, Pad
ID: Griggs Pad, ABR–201405005, Eldred
and Loyalsock Townships, Lycoming
County, Pa.; Consumptive Use of Up to
4.000 mgd; Approval Date: May 13,
2014.
12. Southwestern Energy Production
Company, Pad ID: Lepley Pad—TI–04,
ABR–201405006, Liberty Township,
Tioga County, Pa.; Consumptive Use of
Up to 4.999 mgd; Approval Date: May
13, 2014.
13. Chesapeake Appalachia, LLC, Pad
ID: Dr. Marone, ABR–201405007,
Washington Township, Wyoming
County, Pa.; Consumptive Use of Up to
7.500 mgd; Approval Date: May 13,
2014.
14. WPX Energy Appalachia, LLC,
Pad ID: Carty Pad Site, ABR–
20090916.R1, Liberty Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 3.999 mgd; Approval Date:
May 15, 2014.
15. Chief Oil & Gas LLC, Pad ID: Teel
Unit #1H, ABR–20091115.R1,
Springville Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.000 mgd; Approval Date: May 15,
2014.
16. Cabot Oil & Gas Corporation, Pad
ID: PlonskiI P1, ABR–201405008,
Gibson Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.250 mgd; Approval Date: May 23,
2014.
17. Cabot Oil & Gas Corporation, Pad
ID: Friedland Farms P1, ABR–
201405009, Lenox Township,
Susquehanna County, Pa.; Consumptive
VerDate Mar<15>2010
20:23 Jul 10, 2014
Jkt 232001
Use of Up to 4.250 mgd; Approval Date:
May 23, 2014.
18. Chief Oil & Gas LLC, Pad ID: Teel
Unit Drilling Pad #2H, ABR–
20091204.R1, Springville Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 2.000 mgd; Approval Date:
May 27, 2014.
19. Chief Oil & Gas LLC, Pad ID: Teel
Unit Drilling Pad #3H, ABR–
20091205.R1, Springville Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 2.000 mgd; Approval Date:
May 27, 2014.
20. Cabot Oil & Gas Corporation, Pad
ID: ButlerL P1, ABR–201405010,
Lathrop Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.250 mgd; Approval Date: May 27,
2014.
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR Parts 806, 807, and 808.
Dated: July 2, 2014.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2014–16250 Filed 7–10–14; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists the projects
approved by rule by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: April 1–30, 2014.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 1306;
fax: (717) 238–2436; email: rcairo@
srbc.net. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22(f) for
the time period specified above:
SUMMARY:
Approvals By Rule Issued Under 18
CFR 806.22(f)
1. Cabot Oil & Gas Corporation, Pad
ID: Shields G P1, ABR–20090930.R1,
Dimock Township, Susquehanna
County, Pa.; Consumptive Use of Up to
PO 00000
Frm 00133
Fmt 4703
Sfmt 4703
3.575 mgd; Approval Date: April 14,
2014.
2. Cabot Oil & Gas Corporation, Pad
ID: HunsingerA P2, ABR–20090931.R1,
Dimock Township, Susquehanna
County, Pa.; Consumptive Use of Up to
3.575 mgd; Approval Date: April 14,
2014.
3. Cabot Oil & Gas Corporation, Pad
ID: Hoover P1, ABR–20090937.R1,
Dimock Township, Susquehanna
County, Pa.; Consumptive Use of Up to
3.575 mgd; Approval Date: April 14,
2014.
4. Pennsylvania General Energy
Company, LLC, Pad ID: COP TRACT
724—PAD A, ABR–20091118.R1,
Gamble Township, Lycoming County,
Pa.; Consumptive Use of Up to 2.000
mgd; Approval Date: April 14, 2014.
5. Chief Oil & Gas LLC, Pad ID:
Herbert Drilling Pad, ABR–201404001,
Harford Township, Susquehanna
County, Pa.; Consumptive Use of Up to
2.500 mgd; Approval Date: April 16,
2014.
6. Cabot Oil & Gas Corporation, Pad
ID: PijanowskiJ P1, ABR–201404002,
Springville Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.250 mgd; Approval Date: April 25,
2014.
7. Anadarko E&P Onshore, LLC, Pad
ID: Bonnel Run H&F Pad D, ABR–
201404003, Pine Township, Lycoming
County, Pa.; Consumptive Use of Up to
4.000 mgd; Approval Date: April 25,
2014.
8. Chesapeake Appalachia, LLC, Pad
ID: Three Reasons, ABR–201404004,
Overton Township, Bradford County,
Pa.; Consumptive Use of Up to 7.500
mgd; Approval Date: April 25, 2014.
9. Chesapeake Appalachia, LLC, Pad
ID: Eileen, ABR–20090806.R1,
Smithfield Township, Bradford County,
Pa.; Consumptive Use of Up to 7.500
mgd; Approval Date: April 25, 2014.
10. Chesapeake Appalachia, LLC, Pad
ID: Claudia, ABR–20090807.R1, Terry
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.500 mgd;
Approval Date: April 25, 2014.
11. Chesapeake Appalachia, LLC, Pad
ID: Bonnie, ABR–20090904.R1, Albany
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.500 mgd;
Approval Date: April 25, 2014.
12. Talisman Energy USA Inc., Pad
ID: Eick 013, ABR–20091105.R1,
Columbia Township, Bradford County,
Pa.; Consumptive Use of Up to 3.000
mgd; Approval Date: April 25, 2014.
13. Chief Oil & Gas LLC, Pad ID:
Marcy Drilling Pad, ABR–201404005,
Lenox Township, Susquehanna County,
Pa.; Consumptive Use of Up to 2.500
mgd; Approval Date: April 29, 2014.
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 79, Number 133 (Friday, July 11, 2014)]
[Notices]
[Pages 40189-40190]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16250]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Projects Approved for Consumptive Uses of Water
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists the projects approved by rule by the
Susquehanna River Basin Commission during the period set forth in
DATES.
DATES: May 1-31, 2014.
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 1306; fax: (717) 238-2436; email:
rcairo@srbc.net. Regular mail inquiries may be sent to the above
address.
SUPPLEMENTARY INFORMATION: This notice lists the projects, described
below, receiving approval for the consumptive use of water pursuant to
the Commission's approval by rule process set forth in 18 CFR 806.22(f)
for the time period specified above:
Approvals By Rule Issued Under 18 CFR 806.22(f)
1. Citrus Energy Corporation, Pad ID: Procter and Gamble Mehoopany
Plant 1V, ABR-20091014.R1, Washington Township, Wyoming County, Pa.;
Consumptive Use of Up to 5.000 mgd; Approval Date: May 1, 2014.
2. Anadarko E&P Onshore LLC, Pad ID: C.O.P. TRACT 343 PAD C, ABR-
20090908.R1, Noyes Township, Clinton County, Pa.; Consumptive Use of Up
to 5.000 mgd; Approval Date: May 6, 2014.
3. Anadarko E&P Onshore LLC, Pad ID: COP Tr 244 1000H,
ABR-20090927.R1, Rush Township, Centre County, Pa.; Consumptive Use of
Up to 5.000 mgd; Approval Date: May 6, 2014.
4. Anadarko E&P Onshore LLC, Pad ID: COP Tr 244 1001H &
1002H, ABR-20090928.R1, Rush Township, Centre County, Pa.;
Consumptive Use of Up to 5.000 mgd; Approval Date: May 6, 2014.
5. Seneca Resources Corporation, Pad ID: DCNR 595 Pad A, ABR-
201405001, Covington Township, Tioga County, Pa.; Consumptive Use of Up
to 4.000 mgd; Approval Date: May 12, 2014.
[[Page 40190]]
6. Chief Oil & Gas LLC, Pad ID: Blanchard Drilling Pad, ABR-
201405002, McNett Township, Lycoming County, Pa.; Consumptive Use of Up
to 2.500 mgd; Approval Date: May 12, 2014.
7. Range Resources--Appalachia, LLC, Pad ID: Cornwall B Unit, ABR-
201405003, Lewis Township, Lycoming County, Pa.; Consumptive Use of Up
to 5.000 mgd; Approval Date: May 12, 2014.
8. WPX Energy Appalachia, LLC, Pad ID: Five E's FLP Pad Site, ABR-
20090801.R1, Middletown Township, Susquehanna County, Pa.; Consumptive
Use of Up to 3.000 mgd; Approval Date: May 13, 2014.
9. WPX Energy Appalachia, LLC, Pad ID: Markovitch Pad Site, ABR-
20090828.R1, Bridgewater Township, Susquehanna County, Pa.; Consumptive
Use of Up to 3.999 mgd; Approval Date: May 13, 2014.
10. Inflection Energy (PA), LLC, Pad ID: TLC Pad, ABR-201405004,
Eldred Township, Lycoming County, Pa.; Consumptive Use of Up to 4.000
mgd; Approval Date: May 13, 2014.
11. Inflection Energy (PA), LLC, Pad ID: Griggs Pad, ABR-201405005,
Eldred and Loyalsock Townships, Lycoming County, Pa.; Consumptive Use
of Up to 4.000 mgd; Approval Date: May 13, 2014.
12. Southwestern Energy Production Company, Pad ID: Lepley Pad--TI-
04, ABR-201405006, Liberty Township, Tioga County, Pa.; Consumptive Use
of Up to 4.999 mgd; Approval Date: May 13, 2014.
13. Chesapeake Appalachia, LLC, Pad ID: Dr. Marone, ABR-201405007,
Washington Township, Wyoming County, Pa.; Consumptive Use of Up to
7.500 mgd; Approval Date: May 13, 2014.
14. WPX Energy Appalachia, LLC, Pad ID: Carty Pad Site, ABR-
20090916.R1, Liberty Township, Susquehanna County, Pa.; Consumptive Use
of Up to 3.999 mgd; Approval Date: May 15, 2014.
15. Chief Oil & Gas LLC, Pad ID: Teel Unit 1H, ABR-
20091115.R1, Springville Township, Susquehanna County, Pa.; Consumptive
Use of Up to 5.000 mgd; Approval Date: May 15, 2014.
16. Cabot Oil & Gas Corporation, Pad ID: PlonskiI P1, ABR-
201405008, Gibson Township, Susquehanna County, Pa.; Consumptive Use of
Up to 4.250 mgd; Approval Date: May 23, 2014.
17. Cabot Oil & Gas Corporation, Pad ID: Friedland Farms P1, ABR-
201405009, Lenox Township, Susquehanna County, Pa.; Consumptive Use of
Up to 4.250 mgd; Approval Date: May 23, 2014.
18. Chief Oil & Gas LLC, Pad ID: Teel Unit Drilling Pad
2H, ABR-20091204.R1, Springville Township, Susquehanna County,
Pa.; Consumptive Use of Up to 2.000 mgd; Approval Date: May 27, 2014.
19. Chief Oil & Gas LLC, Pad ID: Teel Unit Drilling Pad
3H, ABR-20091205.R1, Springville Township, Susquehanna County,
Pa.; Consumptive Use of Up to 2.000 mgd; Approval Date: May 27, 2014.
20. Cabot Oil & Gas Corporation, Pad ID: ButlerL P1, ABR-201405010,
Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to
4.250 mgd; Approval Date: May 27, 2014.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR Parts
806, 807, and 808.
Dated: July 2, 2014.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2014-16250 Filed 7-10-14; 8:45 am]