Nuclear Regulatory Commission March 2019 – Federal Register Recent Federal Regulation Documents

Exelon Generation Company, LLC; Peach Bottom Atomic Power Station; Units 2 and 3
Document Number: 2019-05804
Type: Notice
Date: 2019-03-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC to withdraw its application dated September 27, 2018, for proposed amendments to Renewed Facility Operating License Nos. DPR-44 and DPR-56. The proposed amendments would have modified Technical Specification (TS) 3.3.6.2, ``Secondary Containment Isolation Instrumentation.''
GE Hitachi Nuclear Energy; Vallecitos Nuclear Center Partial Site Release
Document Number: 2019-05802
Type: Notice
Date: 2019-03-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering a request from GE Hitachi Nuclear Energy (GEH) to approve the release for unrestricted use of a portion of its property under the control of the NRC power reactor licenses for the Vallecitos Nuclear Center (VNC) in Sunol, California. Approval of the request would allow GEH to make available to the Alameda County Transportation Commission an approximately seven-acre portion on the southern boundary of the GEH- controlled property to support road development and widening of California State Highway 84. The NRC is soliciting public comment on the requested action and invites interested persons to participate. The NRC plans to hold a public meeting to promote full understanding of the requested actions and to facilitate public comment.
Sunshine Act Meetings
Document Number: 2019-05850
Type: Notice
Date: 2019-03-26
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2019-05266
Type: Notice
Date: 2019-03-26
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from February 26, 2019 to March 11, 2019. The last biweekly notice was published on March 12, 2019.
Credibility Assessment Framework for Critical Boiling Transition Models
Document Number: 2019-05606
Type: Notice
Date: 2019-03-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft NUREG (U.S. Nuclear Regulatory Commission technical report designation), knowledge management NUREG (NUREG/KM) - 0013, ``Credibility Assessment Framework for Critical Boiling Transition Models.'' This NUREG describes NRC past practice and staff experience in determining the credibility of critical heat flux and critical power models and, based on that experience, presents an assessment framework that combines aspects of goal structuring notation and maturity assessment.
Information Collection: “Nondiscrimination on the Basis of Sex in Education Programs or Activities Receiving Federal Financial Assistance”
Document Number: 2019-05605
Type: Notice
Date: 2019-03-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on this proposed collection of information OR the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``Nondiscrimination on the Basis of Sex in Education Programs or Activities Receiving Federal Financial Assistance''.
Information Collection: Form 790, Classification Record
Document Number: 2019-05604
Type: Notice
Date: 2019-03-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``Form 790, Classification Record.''
Information Collection: Operators' Licenses
Document Number: 2019-05596
Type: Notice
Date: 2019-03-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, Operators' Licenses.''
663rd Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2019-05593
Type: Notice
Date: 2019-03-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Branch Technical Position 5-3, Fracture Toughness Requirements
Document Number: 2019-05262
Type: Notice
Date: 2019-03-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to Branch Technical Position (BTP) 5-3, ``Fracture Toughness Requirements,'' of NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.''
Enhanced Security of Special Nuclear Material
Document Number: 2019-05261
Type: Proposed Rule
Date: 2019-03-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On March 1, 2019, the U.S. Nuclear Regulatory Commission (NRC) requested comments on a draft revised regulatory basis to support a rulemaking that would update special nuclear material physical protection requirements, including those applicable to fuel cycle facilities. The public comment period originally was scheduled to close on April 1, 2019. The NRC has decided to extend the public comment period to allow members of the public more time to develop and submit their comments.
List of Approved Spent Fuel Storage Casks: NAC International MAGNASTOR® Cask System; Certificate of Compliance No. 1031, Amendment No. 7; Correction
Document Number: 2019-05238
Type: Rule
Date: 2019-03-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) published a direct final rule in the Federal Register on June 6, 2017, amending its spent fuel storage regulations by revising the NAC International MAGNASTOR[supreg] Cask System listing within the ``List of approved spent fuel storage casks'' to include Amendment No. 7 to Certificate of Compliance No. 1031. The direct final rule was effective on August 21, 2017. The technical specifications for NAC International MAGNASTOR[supreg] Cask System, Amendment No. 7 included a minor editorial and non-substantive error. The purpose of this action is to correct the error.
Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the Mississippi State Department of Health
Document Number: 2019-05230
Type: Notice
Date: 2019-03-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This notice is to advise the public of the issuance of a Memorandum of Understanding (MOU) between the U.S. Nuclear Regulatory Commission (NRC) and the Mississippi State Department of Health (MSDH), an agency of the State of Mississippi. The MOU provides the basis for mutually agreeable procedures whereby the Mississippi State Department of Health may utilize the NRC Emergency Response Data System (ERDS) to receive data from a commercial nuclear power plant, for which any part of the plant's 10-mile Emergency Planning Zone lies within the State of Mississippi.
Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the Florida Department of Health
Document Number: 2019-05229
Type: Notice
Date: 2019-03-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This notice is to advise the public of the issuance of a Memorandum of Understanding (MOU) between the U.S. Nuclear Regulatory Commission (NRC) and the Florida Department of Health (FDOH), an agency of the State of Florida. The MOU provides the basis for mutually agreeable procedures whereby the Florida Department of Health may utilize the NRC Emergency Response Data System (ERDS) to receive data from a commercial nuclear power plant, for which any part of the plant's 10-mile Emergency Planning Zone lies within the State of Florida.
Information Collection: Survey of NRC Materials Licensees To Support Rulemaking for NRC's Small Entity Size Standards
Document Number: 2019-05185
Type: Notice
Date: 2019-03-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on this proposed collection of information. The information collection is entitled, ``Survey of NRC Materials Licensees to Support Rulemaking for NRC's Small Entity Size Standards.''
Sunshine Act Meetings
Document Number: 2019-05325
Type: Notice
Date: 2019-03-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Digital I&C Systems
Document Number: 2019-05077
Type: Notice
Date: 2019-03-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Revised Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on NuScale
Document Number: 2019-05025
Type: Notice
Date: 2019-03-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on NuScale
Document Number: 2019-05024
Type: Notice
Date: 2019-03-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Activities in Response to a Portion of the Nuclear Energy Innovation and Modernization Act
Document Number: 2019-04960
Type: Notice
Date: 2019-03-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is undertaking activities to implement the Nuclear Energy Innovation and Modernization Act (NEIMA) and develop a report identifying best practices for establishment and operation of local community advisory boards associated with decommissioning activities, including lessons learned from existing boards. As part of developing the report, the NRC will host a minimum of ten public meetings to consult with host States, communities within the emergency planning zone of a nuclear power reactor, and existing local community advisory boards. The NRC is seeking stakeholder input to inform the selection of public meeting locations.
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4, Reactor Coolant System Flow Coastdown
Document Number: 2019-04958
Type: Notice
Date: 2019-03-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 155 and 154 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (collectively SNC); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information requested in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
662nd Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2019-04931
Type: Notice
Date: 2019-03-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Information Collection: Exemptions and Continued Regulatory Authority in Agreement States and in Offshore Waters Under Section 274 of the Atomic Energy Act of 1954
Document Number: 2019-04910
Type: Notice
Date: 2019-03-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a proposed collection of information which included a request for revision of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``10 CFR part 150, Exemptions and Continued Regulatory Authority in Agreement States and in Offshore Waters Under Section 274 of the Atomic Energy Act of 1954.''
NextEra Energy Seabrook, LLC; Seabrook Station, Unit No. 1
Document Number: 2019-04832
Type: Notice
Date: 2019-03-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued an amendment to Facility Operating License No. NPF-86, issued to NextEra Energy Seabrook, LLC, for operation of the Seabrook Station, Unit No. 1. The amendment revised the Facility Operating License and Updated Final Safety Analysis Report to adopt a methodology for the analysis of seismic Category I structures with concrete affected by alkali-silica reaction.
NextEra Energy Seabrook, LLC; Seabrook Station, Unit No. 1
Document Number: 2019-04821
Type: Notice
Date: 2019-03-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued Renewed Facility Operating License No. NPF-86 to NextEra Energy Seabrook, LLC (NextEra), Hudson Light & Power Department, Massachusetts Municipal Wholesale Electric Company, and Taunton Municipal Lighting Plant. Renewed Facility Operating License No. NPF-86 authorizes NextEra to operate Seabrook Station, Unit No. 1 (Seabrook) at reactor core power levels not in excess of 3,648 megawatts thermal, and in accordance with the provisions of the Seabrook renewed operating license and technical specifications. In addition, the NRC has prepared a record of decision (ROD) that supports the agency's decision to issue Renewed Facility Operating License No. NPF-86 authorizing operations at Seabrook for an additional 20 years.
Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2
Document Number: 2019-04755
Type: Notice
Date: 2019-03-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC (Exelon) to withdraw its application dated August 10, 2018, as supplemented by letter dated December 21, 2018, for proposed amendments to Facility Operating License Nos. NPF-37 and NPF-66, issued to Exelon for operation of the Byron Station, Unit Nos. 1 and 2. The proposed amendment would have extended the Completion Time for Technical Specification 3.8.1, ``AC Sources-Operating,'' Required Action A.2, on a one-time, temporary basis, based on a risk-informed approach.
Information Collection: Nuclear Material Events Database (NMED) for the Collection of Event Report, Response, Analyses, and Follow-Up Data on Events Involving the Use of Atomic Energy Act (AEA) Radioactive Byproduct Material
Document Number: 2019-04754
Type: Notice
Date: 2019-03-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``Nuclear Material Events Database (NMED) for the Collection of Event Report, Response, Analyses, and Follow-Up Data on Events Involving the Use of Atomic Energy Act (AEA) Radioactive Byproduct Material.''
South Carolina Electric & Gas Company; Virgil C. Summer Nuclear Station, Units 2 and 3
Document Number: 2019-04601
Type: Notice
Date: 2019-03-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is terminating the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3, Combined Licenses (COLs) designated as NPF-93, and NPF-94, and their included licenses to manufacture, produce, transfer, receive, acquire, own, possess, or use byproduct material. By letter dated December 27, 2017, the South Carolina Electric & Gas Company (SCE&G) requested that the NRC terminate the VCSNS COLs. Although construction was initiated for VCSNS Units 2 and 3, nuclear materials were never possessed under these licenses. Consequently, the VCSNS site is approved for unrestricted use.
United Nuclear Corporation Church Rock Project
Document Number: 2019-04569
Type: Notice
Date: 2019-03-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On September 24, 2018, United Nuclear Corporation (UNC) requested an amendment to its reclamation plan for its Uranium Mill site near Gallup, New Mexico. UNC is a wholly owned indirect subsidiary corporation of the General Electric Company (GE). This amendment, if granted, would allow construction of a repository for mine-impacted soil. This mine waste would be removed from the Northeast Church Rock Mine Site and transported to be placed in the repository, located on and beside the existing Tailings Disposal Area.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2019-03911
Type: Notice
Date: 2019-03-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from February 12, 2019 to February 25, 2019. The last biweekly notice was published on February 26, 2019.
Sunshine Act Meetings
Document Number: 2019-04480
Type: Notice
Date: 2019-03-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Crediting Previously Completed First Plant and First Three Plant Tests
Document Number: 2019-04309
Type: Notice
Date: 2019-03-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is correcting a notice that was published in the Federal Register, (FR) on February 28. 2019, granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 151 and 150 to Combined Licenses (COLs), NPF 91 and NPF-92. This action is necessary to correct the date the amendment and exemption were issued. The amendment and exemption were issued on January 22, 2019.
Revision of Guidelines on Use of Firearms by Security Personnel
Document Number: 2019-04163
Type: Notice
Date: 2019-03-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing, with the approval of the U.S. Attorney General, revised guidelines on the use of weapons by the security personnel of licensees and certificate holders whose official duties include the protection of designated facilities, certain radioactive material or other property owned or operated by an NRC licensee or certificate holder, or radioactive material or other property that is being transported to or from a facility owned or operated by such a licensee or certificate holder. The revised guidelines are entitled ``Guidelines on the Use of Firearms by Security Personnel in Protecting U.S. NRC-Regulated Facilities, Radioactive Material, and Other Property, Revision 2.'' The NRC first issued firearms guidelines on September 11, 2009.
Sunshine Act Meetings
Document Number: 2019-04081
Type: Notice
Date: 2019-03-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Connecticut Yankee Atomic Power Company, Haddam Neck Independent Spent Fuel Storage Installation
Document Number: 2019-03966
Type: Notice
Date: 2019-03-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and a finding of no significant impact (FONSI) for its review and approval of the decommissioning funding plans submitted by Connecticut Yankee Atomic Power Company (CYAPCO) on December 17, 2012, and December 14, 2015, for the independent spent fuel storage installation (ISFSI) at Haddam Neck in East Hampton, Connecticut.
Energy Northwest, Columbia Generating Station, Independent Spent Fuel Storage Installation
Document Number: 2019-03965
Type: Notice
Date: 2019-03-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and a finding of no significant impact (FONSI) for its review and approval of the decommissioning funding plans submitted by Energy Northwest (EN) on December 17, 2012, and December 15, 2015, for the independent spent fuel storage installation (ISFSI) at Columbia Generating Station in Richland, Washington.
REVISED 661st Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2019-03898
Type: Notice
Date: 2019-03-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Planning and Procedures
Document Number: 2019-03897
Type: Notice
Date: 2019-03-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Physical Security
Document Number: 2019-03862
Type: Notice
Date: 2019-03-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing final Revision 4 to Section 13.6, ''Physical Security'' of NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.''
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
Document Number: 2019-02418
Type: Notice
Date: 2019-03-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of two amendment requests. The amendment requests are for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 and Diablo Canyon Nuclear Power Plant, Units 1 and 2. For each amendment request, the NRC proposes to determine that they involve no significant hazards consideration. Because each amendment request contains sensitive unclassified non-safeguards information (SUNSI) an order imposes procedures to obtain access to SUNSI for contention preparation.
Enhanced Security of Special Nuclear Material
Document Number: 2019-03718
Type: Proposed Rule
Date: 2019-03-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is requesting comments on a draft revised regulatory basis to support a rulemaking that would update special nuclear material (SNM) physical protection requirements for fuel cycle facilities. The rule would establish generically applicable security requirements similar to those imposed by security orders issued by the NRC following the terrorist attacks of September 11, 2001.
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Containment Pressure Analysis
Document Number: 2019-03680
Type: Notice
Date: 2019-03-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow departure from elements of the certification information of Tier 1 of the generic AP1000 design control document (DCD) and issuing License Amendment Nos. 147 and 146 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (collectively SNC); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The amendment changes the VEGP Updated Final Safety Analysis Report by departing from the incorporated plant-specific DCD Tier 2 and Tier 2 * information and related changes to the VEGP Units 3 and 4, COL Appendix A and COL Appendix C (and corresponding plant-specific DCD Tier 1) to modify an administrative program to incorporate the results of various updated plant-specific containment integrity analyses. The granting of the exemption allows the changes to Tier 1 information requested in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemptions and amendments are being issued concurrently.
Ground Water Protection at Uranium In Situ Recovery Facilities
Document Number: 2019-03556
Type: Proposed Rule
Date: 2019-03-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On January 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) requested comments on whether it should proceed with a rulemaking to promulgate a generic set of regulations for the operation of uranium in situ recovery (ISR) facilities, including ground water protection requirements, to standardize existing NRC ISR licensing and oversight practices. The public comment period originally was scheduled to close on March 4, 2019. The NRC has decided to extend the public comment period to allow more time for members of the public to develop and submit their comments.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.