Exelon Generation Company, LLC; Peach Bottom Atomic Power Station; Units 2 and 3, 11578 [2019-05804]

Download as PDF 11578 Federal Register / Vol. 84, No. 59 / Wednesday, March 27, 2019 / Notices exclusive fields of use may exclude all other fields, including but not limited to any outer space applications intended for use beyond 400,000 feet above Earth’s mean sea level. NASA has not yet made a determination to grant the requested license and may deny the requested license even if no objections are submitted within the comment period. The prospective partially exclusive license may be granted unless NASA receives written objections, including evidence and argument no later than April 11, 2019 that establish that the grant of the license would not be consistent with the requirements regarding the licensing of federally owned inventions as set forth in the Bayh-Dohl Act and implementing regulations. Competing applications completed and received by NASA no later than April 11, 2019 will also be treated as objections to the grant of the contemplated partially exclusive license. Objections submitted in response to this notice will not be made available to the public for inspection and, to the extent permitted by law, will not be released under the Freedom of Information Act. DATES: Objections relating to the prospective license may be submitted to Patent Counsel, Office of Chief Counsel, NASA Langley Research Center, MS 30, Hampton, Virginia 23681. Phone (757) 864–3221. Facsimile (757) 864–9190. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Jennifer L. Riley, Patent Attorney, Office of Chief Counsel, NASA Langley Research Center, MS 30, Hampton, Virginia 23681. Phone (757) 864–3221. Facsimile (757) 864–9190. This notice of intent to grant a partially exclusive patent license is issued in accordance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(1)(i). The patent rights in these invention(s) have been assigned to the United States of America as represented by the Administrator of the National Aeronautics and Space Administration. The prospective partially exclusive license will comply with the requirements of 35 U.S.C. 209 and 37 CFR 404.7. Information about other NASA inventions available for licensing can be found online at https:// technology.nasa.gov. SUPPLEMENTARY INFORMATION: Mark Dvorscak, Agency Counsel for Intellectual Property. [FR Doc. 2019–05778 Filed 3–26–19; 8:45 am] BILLING CODE 7510–13–P VerDate Sep<11>2014 21:13 Mar 26, 2019 Jkt 247001 FOR FURTHER INFORMATION CONTACT: NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–277 and 50–278; NRC– 2018–0266] Exelon Generation Company, LLC; Peach Bottom Atomic Power Station; Units 2 and 3 Nuclear Regulatory Commission. ACTION: License amendment application; withdrawal by applicant. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC to withdraw its application dated September 27, 2018, for proposed amendments to Renewed Facility Operating License Nos. DPR–44 and DPR–56. The proposed amendments would have modified Technical Specification (TS) 3.3.6.2, ‘‘Secondary Containment Isolation Instrumentation.’’ DATES: March 27, 2019. ADDRESSES: Please refer to Docket ID NRC–2018–0266 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0266. Address questions about Docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The ‘‘Peach Bottom, Units 2 and 3, License Amendment Request— Technical Specifications Section 3.3.6.2 Functions 3 and 4 Applicability Changes Pertaining to Reactor Building and Refueling Floor Ventilation,’’ is available in ADAMS under Accession No. ML18271A009. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. SUMMARY: PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 Jennifer Tobin, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555–0001; telephone: 301–415–2328; email: Jennifer.Tobin@nrc.gov. SUPPLEMENTARY INFORMATION: The NRC has granted the request of Exelon Generation Company, LLC (the licensee) to withdraw its September 27, 2018, application (ADAMS Accession No. ML18271A009) for proposed amendments to Renewed Facility Operating License Nos. DPR–44 and DPR–56 for the Peach Bottom Atomic Power Station, Units 2 and 3, respectively, located in York County, Pennsylvania. The proposed amendments would have authorized revisions to TS 3.3.6.2, ‘‘Secondary Containment Isolation Instrumentation,’’ to modify the applicability of Functions 3 and 4. Specifically, Function 3 (reactor building ventilation exhaust radiation— high) would have been revised to only be required when Function 4 (refueling floor ventilation exhaust radiation— high) was not maintained. Function 4 would have been revised to only be required when Function 3 was not maintained. Further, this change would have clarified which standby gas treatment subsystems were required to be put into operation or declared inoperable as described in TS 3.3.6.2, Condition C, for Required Actions C.2.1 and C.2.2. On November 20, 2018, a Federal Register notice was published (83 FR 58612) indicating a finding of no significant impact for the proposed license amendment. On March 11, 2019 (ADAMS Accession No. ML19071A062), the licensee sent a letter requesting withdrawal of the license amendment application. Dated at Rockville, Maryland, this 21st day of March, 2019. For the Nuclear Regulatory Commission. Jennifer C. Tobin, Project Manager, Plant Licensing Branch LPL– 1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2019–05804 Filed 3–26–19; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–18 and 50–183; NRC–2019– 0082] GE Hitachi Nuclear Energy; Vallecitos Nuclear Center Partial Site Release Nuclear Regulatory Commission. AGENCY: E:\FR\FM\27MRN1.SGM 27MRN1

Agencies

[Federal Register Volume 84, Number 59 (Wednesday, March 27, 2019)]
[Notices]
[Page 11578]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05804]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-277 and 50-278; NRC-2018-0266]


Exelon Generation Company, LLC; Peach Bottom Atomic Power 
Station; Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; withdrawal by applicant.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has granted the 
request of Exelon Generation Company, LLC to withdraw its application 
dated September 27, 2018, for proposed amendments to Renewed Facility 
Operating License Nos. DPR-44 and DPR-56. The proposed amendments would 
have modified Technical Specification (TS) 3.3.6.2, ``Secondary 
Containment Isolation Instrumentation.''

DATES: March 27, 2019.

ADDRESSES: Please refer to Docket ID NRC-2018-0266 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0266. Address 
questions about Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: Jennifer.Borges@nrc.gov. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to pdr.resource@nrc.gov. The ``Peach Bottom, Units 2 and 3, 
License Amendment Request--Technical Specifications Section 3.3.6.2 
Functions 3 and 4 Applicability Changes Pertaining to Reactor Building 
and Refueling Floor Ventilation,'' is available in ADAMS under 
Accession No. ML18271A009.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Jennifer Tobin, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 
20555-0001; telephone: 301-415-2328; email: Jennifer.Tobin@nrc.gov.

SUPPLEMENTARY INFORMATION: The NRC has granted the request of Exelon 
Generation Company, LLC (the licensee) to withdraw its September 27, 
2018, application (ADAMS Accession No. ML18271A009) for proposed 
amendments to Renewed Facility Operating License Nos. DPR-44 and DPR-56 
for the Peach Bottom Atomic Power Station, Units 2 and 3, respectively, 
located in York County, Pennsylvania.
    The proposed amendments would have authorized revisions to TS 
3.3.6.2, ``Secondary Containment Isolation Instrumentation,'' to modify 
the applicability of Functions 3 and 4. Specifically, Function 3 
(reactor building ventilation exhaust radiation--high) would have been 
revised to only be required when Function 4 (refueling floor 
ventilation exhaust radiation--high) was not maintained. Function 4 
would have been revised to only be required when Function 3 was not 
maintained. Further, this change would have clarified which standby gas 
treatment subsystems were required to be put into operation or declared 
inoperable as described in TS 3.3.6.2, Condition C, for Required 
Actions C.2.1 and C.2.2.
    On November 20, 2018, a Federal Register notice was published (83 
FR 58612) indicating a finding of no significant impact for the 
proposed license amendment. On March 11, 2019 (ADAMS Accession No. 
ML19071A062), the licensee sent a letter requesting withdrawal of the 
license amendment application.

    Dated at Rockville, Maryland, this 21st day of March, 2019.

    For the Nuclear Regulatory Commission.
Jennifer C. Tobin,
Project Manager, Plant Licensing Branch LPL-1, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2019-05804 Filed 3-26-19; 8:45 am]