Nuclear Regulatory Commission July 2012 – Federal Register Recent Federal Regulation Documents

Sunshine Act Meetings
Document Number: 2012-18755
Type: Notice
Date: 2012-07-31
Agency: Nuclear Regulatory Commission, Agencies and Commissions
NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability
Document Number: 2012-18639
Type: Proposed Rule
Date: 2012-07-31
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is holding a public meeting to discuss a draft regulatory issue summary (RIS) that clarifies the NRC staff's position on the relationship between the general design criteria (GDC) for nuclear power plants and technical specification operability. In addition, the draft RIS clarifies the process for addressing nonconformances with GDC as incorporated into a plant's current licensing basis. The NRC is also seeking public comment on the draft RIS.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 2012-18380
Type: Notice
Date: 2012-07-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register Notice with a 60-day comment period on this information collection on April 4, 2012 (77 FR 20437). 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: Billing Instructions for NRC Cost Type Contracts. 3. Current OMB approval number: 3150-0109. 4. The form number if applicable: None. 5. How often the collection is required: Monthly and on occasion. 6. Who will be required or asked to report: NRC Contractors. 7. An estimate of the number of annual responses: 1,236. 8. The estimated number of annual respondents: 34. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 618. 10. Abstract: In administering its contracts, the NRC Division of Contracts provides billing instructions for its contractors to follow in preparing invoices. These instructions stipulate the level of detail in which supporting data must be submitted for NRC review. The review of this information ensures that all payments made by NRC for valid and reasonable costs are in accordance with the contract terms and conditions. The public may examine and have copied for a fee publicly available documents, including the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by August 27, 2012. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Chad Whiteman, Desk Officer, Office of Information and Regulatory Affairs (3150-0109), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be emailed to Chad_S_Whiteman@omb.eop.gov or submitted by telephone at 202-395-4718. The NRC Clearance Officer is Tremaine Donnell, telephone: 301-415- 6258.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-18379
Type: Notice
Date: 2012-07-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Reports Concerning Possible Non-Routine Emergency Generic Problems. 2. Current OMB approval number: 3150-0012. 3. How often the collection is required: On occasion. 4. Who is required or asked to report: Nuclear power reactor licensees, non-power reactors, and materials applicants and licensees. 5. The number of annual respondents: 235. 6. The number of hours needed annually to complete the requirement or request: 85,900. 7. Abstract: NRC is requesting approval authority to collect information concerning possible non-routine generic problems which would require prompt action from NRC to preclude potential threats to public health and safety. Submit, by September 25, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2012-0165. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2012-0165. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-6258; email: INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-18351
Type: Notice
Date: 2012-07-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 244, Registration CertificateUse of Depleted Uranium under General License. 2. Current OMB approval number: 3150-0031. 3. How often the collection is required: On occasion. NRC Form 244 is submitted when depleted uranium is received or transferred under a general license. Information on NRC Form 244 is collected and evaluated on a continuing basis as events occur. 4. Who is required or asked to report: Persons receiving, possessing, using, or transferring depleted uranium under the general license established in 10 CFR 40.25(a). 5. The number of annual respondents: 23. 6. The number of hours needed annually to complete the requirement or request: 23. 7. Abstract: Title 10 of the Code of Federal Regulations (10 CFR) Part 40, establishes requirements for licenses for the receipt, possession, use, and transfer of radioactive source and byproduct material. The NRC Form 244 is used to report receipt and transfer of depleted uranium under general license, as required by Section 40.25. The registration certification information required by the NRC Form 244 is necessary to permit the NRC to make a determination on whether the possession, use, and transfer of depleted uranium source and byproduct material is in conformance with the Commission's regulations for protection of public health and safety. Submit, by September 25, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2012-0155. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2012-0155. Mail comments to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415- 6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-18350
Type: Notice
Date: 2012-07-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 590, ``Application/Permit for Use of the Two White Flint (TWFN) Auditorium.'' 2. Current OMB approval number: 3150-0181. 3. How often the collection is required: Each time public use of the auditorium is requested. 4. Who is required or asked to report: Members of the public requesting use of the NRC Auditorium. 5. The number of annual respondents: 5. 6. The number of hours needed annually to complete the requirement or request: 1.25 hours (5 requests x 15 minutes per request). 7. Abstract: In accordance with the Public Buildings Act of 1959, an agreement was reached between the Maryland-National Capital Park and Planning Commission, the General Services Administration, and the U.S. Nuclear Regulatory Commission (NRC) that the NRC auditorium will be made available for public use. Public users of the auditorium will be required to complete NRC Form 590, Application/Permit for Use of Two White Flint North Auditorium. The information is needed to allow for administrative and security review and scheduling, and to make a determination that there are no anticipated problems with the requester prior to utilization of the facility. Submit, by September 25, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine, and have copied for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2012-0150. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2012-0150. Mail comments to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415- 6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
Requirements for Distribution of Byproduct Material
Document Number: 2012-17711
Type: Rule
Date: 2012-07-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations to make requirements for distributors of byproduct material clearer, less prescriptive, and more risk-informed and up to date. The Commission is also redefining categories of devices to be used under exemptions, adding explicit provisions regarding the sealed source and device registration process, and adding flexibility to the licensing of users of sealed sources and devices. This action is primarily intended to make licensing processes more efficient and effective. These changes will affect manufacturers and distributors of sources and devices containing byproduct material and future users of some products currently used under a general or specific license.
Implementation of Requirements for Distribution of Byproduct Material
Document Number: 2012-17710
Type: Proposed Rule
Date: 2012-07-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations to make requirements for distributors of byproduct material clearer, less prescriptive, and more risk-informed and up to date. The rulemaking also redefines some categories of devices to be used under exemption from licensing requirements, adds explicit provisions regarding the sealed source and device registration process, and adds flexibility to the licensing of users of sealed sources and devices. This action was primarily intended to make licensing processes more efficient and effective. These changes will affect manufacturers and distributors of sources and devices containing byproduct material and future users of some products currently used under a general or specific license. The NRC has prepared interim guidance to address implementation of the final regulations. This document announces the availability of the implementation guidance document for public comment.
Notice of Sunshine Act Meetings
Document Number: 2012-18129
Type: Notice
Date: 2012-07-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Final Standard Review Plan, Branch Technical Position 7-19 on Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems
Document Number: 2012-18018
Type: Notice
Date: 2012-07-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) staff is issuing Final Revision 6 to NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Branch Technical Position (BTP) 7-19 on ``Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems.'' This BTP is to be cited as the acceptance criteria for Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems in the Standard Review Plan (SRP), Chapter 7, for those standard reactor designs that have not been certified prior to the date of this BTP. The purpose of this SRP update is to provide staff guidance for assessing combined license (COL) applicant compliance with the requirements.
Millstone Power Station, Unit 2; Exemption
Document Number: 2012-17735
Type: Notice
Date: 2012-07-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
License Renewal for the Dow Chemical TRIGA Research Reactor
Document Number: 2012-17733
Type: Notice
Date: 2012-07-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Act Meetings
Document Number: 2012-17571
Type: Notice
Date: 2012-07-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1
Document Number: 2012-17228
Type: Notice
Date: 2012-07-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an amendment to Facility Operating License No. NPF-29, issued to Entergy Operations, Inc. (Entergy, the licensee), for operation of the Grand Gulf Nuclear Station, Unit 1 (GGNS Unit 1), located in Claiborne County, Mississippi, in accordance with NRC's regulations. Therefore, the NRC has prepared this final environmental assessment (EA) and finding of no significant impact (FONSI) for the proposed action.
Aging Management Associated With Wall Thinning Due to Erosion Mechanisms
Document Number: 2012-17117
Type: Notice
Date: 2012-07-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) requests public comment on Draft License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2012-01, ``Wall Thinning Due to Erosion Mechanisms.'' The draft LR-ISG proposes to revise an NRC staff-recommended aging management program (AMP) in NUREG-1801, Revision 2, ``Generic Aging Lessons Learned (GALL) Report,'' and the NRC staff's aging management review procedure and acceptance criteria contained in NUREG-1800, Revision 2, ``Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants'' (SRP-LR) to address wall thinning due to various erosion mechanisms for piping and components within the scope of the Requirements for Renewal of Operating Licenses for Nuclear Power Plants. This LR-ISG provides changes to the recommendations in GALL Report, Revision 2, AMP XI.M17, ``Flow- Accelerated Corrosion,'' based on the staff's review of several license renewal applications' flow-accelerated corrosion AMPs and stakeholder input.
Decommissioning Planning During Operations
Document Number: 2012-17014
Type: Proposed Rule
Date: 2012-07-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is seeking input from the public, licensees, Agreement States, non- Agreement States, and other stakeholders on revised draft regulatory guide (DG) 4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the NRC's Decommissioning Planning Rule. The NRC will hold a public meeting and concurrent Webinar to facilitate the public's and other stakeholders' comments.
Guidelines for Preparing and Reviewing Licensing Applications for Instrumentation and Control Upgrades for Non-Power Reactors
Document Number: 2012-17011
Type: Notice
Date: 2012-07-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on Chapter 7, Section 7.3, Reactor Control System, augmenting NUREG-1537, Part 1, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content,'' for instrumentation and control (I&C) upgrades and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria,'' for instrumentation and control (I&C) upgrades. This draft section of NUREG-1537 provides revised guidance for preparing and reviewing applications to amend a facility operating license for I&C upgrades.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 2012-17009
Type: Notice
Date: 2012-07-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register Notice with a 60-day comment period on this information collection on April 13, 2012 (77 FR 22360). 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: Generic Customer Satisfaction Surveys and NRC Form 671, Request for Review of a Customer Satisfaction Survey under Generic Clearance. 3. Current OMB approval number: 3150-0197. 4. The form number if applicable: NRC Form 671. 5. How often the collection is required: On occasion. 6. Who will be required or asked to report: NRC licensees and the public will be asked to report voluntarily. 7. An estimate of the number of annual responses: 3,988. 8. The estimated number of annual respondents: 3,884. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 1,614 hours. 10. Abstract: Voluntary customer satisfaction surveys will be used to contact users of NRC services and products to determine how the Commission can improve its services and products to better meet their needs. In addition, focus groups will be conducted to discuss questions concerning those services and products. Results from the surveys will provide insight into how NRC can make its services and products cost effective, efficient and responsive to customer needs. Each survey will be submitted to OMB for its review. The public may examine and have copied for a fee publicly available documents, including the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by August 13, 2012. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Chad S. Whiteman, Desk Officer, Office of Information and Regulatory Affairs (3150-0197), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be emailed to Chad_S_Whiteman@omb.eop.gov or submitted by telephone at: 202-395-4718. The NRC Clearance Officer is Tremaine Donnell, 301-415-6258.
Communication With Transport Vehicles
Document Number: 2012-16906
Type: Notice
Date: 2012-07-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission), is withdrawing Regulatory Guide 5.32, Revision 1, ``Communication with Transport Vehicles,'' published in May 1975. The guide is being withdrawn because it is outdated due to advances in technology.
Application and Amendment to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations Containing Sensitive Unclassified Non-Safeguard Information
Document Number: 2012-16904
Type: Notice
Date: 2012-07-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has received, by letter dated August 20, 2009, a license amendment application from the United States Department of Agriculture (USDA or the licensee), requesting approval of a Decommissioning Plan for its Low-Level Radioactive Burial Site located in Beltsville, Maryland. License No. 19-00915-03 authorizes the licensee to use radioactive byproduct material for research and development activities and for use in gauging and measurement devices. The licensee revised the original plan and re-submitted the amendment request. Specifically, the amendment provides a Decommissioning Plan for the excavation and disposal of low-level radioactive waste from its research and development activities that had been disposed in a previously permitted low-level waste burial area at the Beltsville site.
Low-Level Radioactive Waste Regulatory Management Issues
Document Number: 2012-16657
Type: Proposed Rule
Date: 2012-07-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) plans to conduct a public meeting to discuss proposed changes to its current regulatory requirements as directed by the Commission in a January 19, 2012, Staff Requirements Memorandum. Information will be gathered from invited subject matter experts, stakeholders, and other interested members of the public regarding the changes proposed by the Commission. Specifically, the NRC staff is interested in gaining a better understanding of the issues associated with specifying a regulatory time of compliance for a low-level radioactive waste disposal facility, allowing licensees the flexibility to implement waste acceptance criteria as an alternative to the current waste classification system, and revising the NRC's licensing requirements for land disposal of radioactive waste.
Sunshine Act Meetings
Document Number: 2012-16791
Type: Notice
Date: 2012-07-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Withdrawal of Regulatory Guide 7.3; Procedures for Picking Up and Receiving Packages of Radioactive Material
Document Number: 2012-16661
Type: Notice
Date: 2012-07-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This document is correcting the document published in the Federal Register on June 15, 2012 (77 FR 36017). Today's document supersedes that document and republishes it in its entirety with corrections. This document, by way of explanation, is including previously omitted text that establishes a better rationale for withdrawing the regulatory guide (RG). The U.S. Nuclear Regulatory Commission (NRC or Commission) is withdrawing RG 7.3, ``Procedures for Picking Up and Receiving Packages of Radioactive Material.'' The RG is being withdrawn because it is outdated and the relevant information contained in it has been updated and incorporated into Revision 1 of RG 7.7, ``Administrative Guide for Verifying Compliance with Packaging Requirements for Shipment and Receipt of Radioactive Material,'' which was issued in March 28, 2012 (77 FR 18871).
Tennessee Valley Authority; Notice of Withdrawal of Application for Amendment to Facility Operating License
Document Number: 2012-16658
Type: Notice
Date: 2012-07-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Fuel Oil Systems for Emergency Power Supplies
Document Number: 2012-16426
Type: Notice
Date: 2012-07-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1282, ``Fuel Oil Systems for Emergency Power Supplies.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the Commission's requirements regarding fuel oil systems for safety-related emergency diesel generators and oil-fueled gas turbine generators, including assurance of adequate fuel oil quality.
Sunshine Act Meeting
Document Number: 2012-16405
Type: Notice
Date: 2012-07-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Application for a License To Export Nuclear Reactor Major Components and Equipment
Document Number: 2012-16266
Type: Notice
Date: 2012-07-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Receipts-Based, Small Business Size Standard
Document Number: 2012-16258
Type: Proposed Rule
Date: 2012-07-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is proposing to amend the size standard that it uses to qualify an NRC licensee as a ``small entity'' under the Regulatory Flexibility Act of 1980, as amended. The NRC is proposing to increase its receipts-based, small business size standard from $6.5 million to $7 million to conform to the standard set by the Small Business Administration (SBA). This size standard reflects the most commonly used SBA size standard for nonmanufacturing industries. The SBA adjusted this standard on July 18, 2008 (73 FR 41237), to account for inflation.
Receipts-Based, Small Business Size Standard
Document Number: 2012-16252
Type: Rule
Date: 2012-07-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending the size standard that it uses to qualify an NRC licensee as a ``small entity'' under the Regulatory Flexibility Act of 1980, as amended. The NRC is increasing its receipts-based, small business size standard from $6.5 million to $7 million to conform to the standard set by the Small Business Administration (SBA). This size standard reflects the most commonly used SBA size standard for nonmanufacturing industries. The SBA adjusted this standard on July 18, 2008 (73 FR 41237), to account for inflation.
In the Matter of Mr. Timothy Goold; Order Prohibiting Involvement in NRC-Licensed Activities
Document Number: 2012-16172
Type: Notice
Date: 2012-07-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.