Nuclear Regulatory Commission July 31, 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is holding a public meeting to discuss a draft regulatory issue summary (RIS) that clarifies the NRC staff's position on the relationship between the general design criteria (GDC) for nuclear power plants and technical specification operability. In addition, the draft RIS clarifies the process for addressing nonconformances with GDC as incorporated into a plant's current licensing basis. The NRC is also seeking public comment on the draft RIS.