Florida East Coast Railway's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
This document provides the public with notice that, on June 4, 2024, and July 22, 2024, Florida East Coast Railway (FECR) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP). As this RFA involves a request for FRA's approval of proposed material modifications to an FRA-certified positive train control (PTC) system, FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTCSP.
Brightline Trains Florida's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
This document provides the public with notice that, on May 29, 2024, and July 19, 2024, Brightline Trains Florida (BLF) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP). As this RFA involves a request for FRA's approval of proposed material modifications to an FRA-certified positive train control (PTC) system, FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTCSP.
Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of Information Collection: Airport Noise Compatibility Planning
In accordance with the Paperwork Reduction Act of 1995, the Federal Aviation Administration (FAA) invites public comments about our intention to request the Office of Management and Budget's (OMB) approval to renew an information collection. The collection involves information on voluntary airport noise compatibility programs. The information to be collected is necessary because noise compatibility program measures are eligible for Federal grants in-aid if they are provided to FAA for review and approval in advance. The respondents are airport sponsors/operators that voluntarily submit noise exposure maps and noise compatibility programs to the FAA for review and approval.
Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
This rule amends, suspends, or removes Standard Instrument Approach Procedures (SIAPs) and associated Takeoff Minimums and Obstacle Departure Procedures for operations at certain airports. These regulatory actions are needed because of the adoption of new or revised criteria, or because of changes occurring in the National Airspace System, such as the commissioning of new navigational facilities, adding new obstacles, or changing air traffic requirements. These changes are designed to provide for the safe and efficient use of the navigable airspace and to promote safe flight operations under instrument flight rules at the affected airports.
Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
This rule establishes, amends, suspends, or removes Standard Instrument Approach Procedures (SIAPS) and associated Takeoff Minimums and Obstacle Departure procedures (ODPs) for operations at certain airports. These regulatory actions are needed because of the adoption of new or revised criteria, or because of changes occurring in the National Airspace System, such as the commissioning of new navigational facilities, adding new obstacles, or changing air traffic requirements. These changes are designed to provide safe and efficient use of the navigable airspace and to promote safe flight operations under instrument flight rules at the affected airports.
Supplemental Initial Decision That Certain Frontal Driver and Passenger Air Bag Inflators Manufactured by ARC Automotive Inc. and Delphi Automotive Systems LLC, and Vehicles in Which Those Inflators Were Installed, Contain a Safety Defect
NHTSA is confirming its initial decision that certain frontal driver and passenger air bag inflators manufactured by ARC Automotive Inc. and Delphi Automotive Systems LLC, and vehicles in which those inflators were installed, contain a defect related to motor vehicle safety. NHTSA is issuing this supplemental initial decision to address in greater detail the basis for the agency's initial decision and to ensure that all vehicles and manufacturers that would be impacted by any recall order are included within the scope of the initial decision.
Amendment of Class D and Class E Airspace; Gainesville, FL
This action proposes to amend Class E airspace extending upward from 700 feet above the surface for Gainesville Regional Airport, Gainesville, FL, as new instrument approach procedures have been designed for Shands Cair Heliport and Shands Helistop Heliport, Gainesville, FL. This action would also replace the terms Notice to Airmen with Notice to Air Missions and Airport/Facility Directory with Chart Supplement in the Class D and Class E descriptions.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Request for Information on Collaboration and Data Sharing for Railroad Operations Analysis
On November 15, 2021, President Biden signed into law the Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL). The BIL provides historic appropriations for railroad transportation grant programs administered by the Federal Railroad Administration (FRA) and authorizes new programs to enhance rail safety and to repair, restore, improve, and expand the nation's rail network. Among those new programs is the Corridor Identification and Development Program (CID Program), which creates a new framework to facilitate the development of new, enhanced, and restored intercity passenger rail corridors throughout the country. Railroad Operations Analysis (OA) uses data to assess changes to railroad operations and/or capital project improvements to railroad infrastructure and is frequently part of the planning process for rail projects. OA involves the collaboration of various rail stakeholders and the sharing of data and information. As a result of the CID Program, there is an increased need for FRA and rail stakeholders to participate in OA and evaluate OA results. FRA finds value in conducting OA in a collaborative manner to promote increased confidence in the OA among stakeholders and support Federal FRA investments in infrastructure projects. In this RFI, FRA seeks public comments on the challenges involved in OA, how FRA may address those challenges, and how FRA may improve OA for Federally funded railroad projects.
60-Day Notice of Intent To Seek Extension of Approval of Collections: Rail Carrier Financial Reports
As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act of 1995 (PRA), the Surface Transportation Board (Board) gives notice of its intent to request from the Office of Management and Budget (OMB) approval without change of the six existing collections described below.