Department of the Army, Corps of Engineers – Federal Register Recent Federal Regulation Documents

Results 1,101 - 1,150 of 1,276
Inland Waterways Users Board
Document Number: 06-8813
Type: Notice
Date: 2006-10-20
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcements is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: November 17, 2006. Location: Renaissance Pittsburgh Hotel, 107 6th Street, Pittsburgh, PA 15222, (412-562-1200). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund, and be provided updates of various inland waterways projects.
Notice of Availability of the Draft Environmental Impact Statement (DEIS) and the Announcement of a Public Hearing for the Proposed Potash Corporation of Saskatchewan Phosphate Mine Continuation Near Aurora, in Beaufort County, NC
Document Number: 06-8812
Type: Notice
Date: 2006-10-20
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Regulatory Division has been reviewing the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from Potash Corporation of Saskatchewan Phosphate Division (PCS) for the continuation of its phosphate mining operation near Aurora, Beaufort County, NC. PCS proposes to expand its existing open pit phosphate mining operation into a 3,412 acre tract immediately adjacent to the current mine. This expansion would impact 2,408 acres of waters of the U.S. including wetlands adjacent to the Pamlico River and South Creek.
Notice of Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Nourishment of 7.25 Miles of Beach, the Repositioning of the New River Inlet Channel, and the Implementation of an Inlet Management Plan, in North Topsail Beach, Onslow County, NC
Document Number: 06-8562
Type: Notice
Date: 2006-10-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Field Office has received an amendment to the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from the town of North Topsail Beach to nourish approximately 7.25 miles of shoreline. The modification will include an additional 3.85 miles of beachfront to protect residential homes and town infrastructures located along the south section of the Town limits. The proposed sources of material for the addition will be dredged from the same offshore borrow area as described in the original 7.25 mile plan. The placement of beach fill along the Town's southern shoreline would result in the initial widening of the beach 75 to 1590 feet seaward, depending on the final design volume and foreshore slopes that the fill assumes during construction. The 3.85 miles of shoreline are located at the southern end of North Topsail Beach. Unlike the original 7.25 miles of proposed nourishment, the additional section is outside the Coastal Barrier Resource System (CBRS) designation; therefore, it is not subject to the expenditure of Federal funding restrictions associated with the Coastal Barrier Resource Act of 1982 and the coastal Barrier Improvement Act of 1990. This south section, or stretch, of shoreline is currently being considered by the U.S. Army Corps of Engineers for a federal shoreline protection project. Due to delays to complete the federal plan formulation process, the North Topsail Beach Board of Alderman voted to include the 3.85 mile section in the non-federal 7.25 mile section that is currently under review pursuant to the Environmental Impact Statement (EIS) procedures. The decision to include the south section in the present EIS process is intended to act as interim or emergency beach fill by preserving existing development and infrastructure along the 3.85 miles of shoreline while the federal plan formulation continues. The original Notice of Intent was published on May 19, 2005 (70 FR 28924) with a commenting deadline of June 21, 2005.
Notice of Intent To Prepare a Supplemental Environmental Impact Statement on Rock Mining in Wetlands in the Lake Belt Region of Miami-Dade County, FL
Document Number: 06-8476
Type: Notice
Date: 2006-10-04
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army corps of Engineers (Corps) Jacksonville District intends to prepare a Supplemental Environmental Impact Statement (SEIS) to evaluate potential impacts of further rock mining within wetlands in western Miami-date county, FL. The original EIS, The Rock Mining- Freshwater Lakebelt Plan Programmatic Environmental Impact Statement, issued in May 2000 focused on the potential impacts of a 50-year mining plan within the Lake Belt area. After evaluating the EIS, the Corps issued a Record of Decision and permits that allowed mining within a smaller, 10-year plan in April 2002. The Corps decision was challenged in United States District Court and the Court's Order on Motions for Summary Judgement was issued on March 22, 2006 as part of Case No. 03- 23427-CIV-HOEVELER, United States District Court Southern District of Florida. The decision instructed the Corps to engage in additional analyses of rock mining in the Lake Belt region. Accordingly, the Corps is preparing this SEIS.
Intent To Prepare an Environmental Impact Statement for the Upper Ohio Navigation Study, PA, in Allegheny and Beaver Counties
Document Number: 06-8358
Type: Notice
Date: 2006-09-29
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), the Pittsburgh District of the U.S. Army Corps of Engineers (Corps) is seeking public comment on the environmental scope of an upcoming study, named the ``Upper Ohio Navigation Study, Pennsylvania.'' This study will consider and evaluate the feasibility of alternatives for maintaining commercial navigation on the Pennsylvania portion of the Ohio River, and also consider and evaluate the feasibility of ecosystem restoration opportunities. The focus of the upper Ohio River navigation feasibility study is to develop the best plan for maintaining safe, environmentally sustainable, and reliable navigation on the upper 40 miles of the Ohio River in Pennsylvania. Navigation is currently provided through three old lock and dam facilitiesEmsworth, Dashields and Montgomery locks and damsdating from the 1920s. The study will consider a 60-year period from 2010 to 2070. Navigation alternatives will consider facility operation and maintenance, rehabilitation, and new construction needs and opportunities. In order to facilitate early public involvement in the planning process, the Corps will be conducting two environmental scoping meetings open to the public in the study area. The public is invited to attend these meetings to hear an overview of the study, and assist in the identification of significant issues to be considered during the study process. (See DATES).
Intent To Convey the “Drum Stick” Parcel of the Former Fort Ord, Located in Monterey County, CA in Return for the “Stillwell Kidney” Parcel Owned by the City of Seaside
Document Number: 06-8357
Type: Notice
Date: 2006-09-29
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to 10 U.S.C. 2869(d)(1) the Department of the Army (Army) is providing notice of its intent to convey the ``Drum Stick'' parcel of the former Fort Ord, located in Monterey County, CA in return for the ``Stillwell Kidney'' parcel owned by the City of Seaside. Fort Ord was selected for closure by the Base Realignment and Closure Commission in 1991. The Drum Stick parcel is an undeveloped, densely- vegetated 11.28-acre property adjacent to California State Route 1 on the former Fort Ord. the Stillwell Kidney parcel currently contains approximately 400 abandoned housing units. Under 10 U.S.C. 2869, the Army is authorized to enter into an agreement to convey real property, including any improvements thereon, located on a military installation that is closed or realigned under a Base Realignment and Closure (BRAC) Act to any person who agrees to convey to the Army real property of at least equal value. The Army has concluded that the Stillwell Kidney parcel has a fair market value that is at least equal to that of the Drum Stick parcel.
Coastal Engineering Research Board (CERB)
Document Number: 06-8249
Type: Notice
Date: 2006-09-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Proposal To Reissue and Modify Nationwide Permits
Document Number: 06-7986
Type: Notice
Date: 2006-09-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is soliciting comments for the reissuance of the existing nationwide permits (NWPs), general conditions, and definitions, with some modifications. The Corps is also proposing to issue six new NWPs and one new general condition. The reissuance process starts with today's publication of the proposed NWPs in the Federal Register for a 60-day comment period. The purpose of this Federal Register notice is to solicit comments on the proposed new and modified NWPs, as well as the NWP general conditions and definitions. Shortly after the publication of this Federal Register notice, each Corps district will publish a public notice to solicit comments on their proposed regional conditions for the new and modified NWPs. The comment period for these district public notices will be 45 days.
Notice of Intent To Prepare an Environmental Impact Statement and Conduct a Public Scoping Meeting for the Bluestone Hydropower Project, Hinton, Summers County, WV
Document Number: 06-8126
Type: Notice
Date: 2006-09-25
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act of 1969 (NEPA), the U.S. Army Corps of Engineers, DoD, Huntington District will prepare an Environmental Impact Statement (EIS) to evaluate potential impacts to the natural, physical, and human environment as a result of the proposed installation of hydropower generation facilities at Bluestone Dam, Hinton, Summers County, WV (Hydropower Project). The proposed hydropower project would utilize three of the six existing penstocks which were part of the original construction of the dam. The proposed project would also involve the discharge of dredged and fill material into waters of the United States (U.S.) and would involve work in the New River, a navigable water of the U.S. Therefore, the subject proposal would require a Department of the Army (DA) permit pursuant to section 404 of the Clean Water Act (Section 404) and Section 10 of the Rivers and Harbors Act of 1899 (Section 10). This EIS will document the agency's evaluation of all reasonable alternatives as they affect stability of the dam and control the release of water from Bluestone Dam, and will document analysis of impacts to Waters of the U.S. sufficient to accommodate the NEPA process for permitting under section 10 and section 404.
Availability of a Final Environmental Impact Statement To Consider Issuance of a Department of the Army Permit Pursuant to Section 404 of the Clean Water Act for Mingo Logan Coal Company's (Mingo Logan) Proposal To Construct and Operate Spruce No. 1 Mine in Logan County, WV
Document Number: 06-8120
Type: Notice
Date: 2006-09-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE) Huntington District has prepared a Final Environmental Impact Statement (FEIS). This FEIS evaluates potential impacts to the natural, physical and human environment as a result of the proposed mining activities associated with the Mingo Logan's proposed Spruce No. 1 Mine. The USACE regulates this proposed project pursuant to Section 404 of the Clean Water Act. The proposed activity would involve the discharge of dredged and fill material into waters of the United States associated with the proposed construction and operation of a bituminous coal mine. The document was prepared following a public review and a 60-day comment period on the Draft Environmental Impact Statement (DEIS), during which time a public hearing meeting was held on May 1, 2006. The meeting was held at the Earl Ray Tomlin Convention Center in Chapmanville, Logan County, WV.
Notice of Availability for the Draft Environmental Impact Statement for Hemet/San Jacinto Integrated Recharge and Recovery Project, Riverside County, CA; Correction
Document Number: 06-7977
Type: Notice
Date: 2006-09-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Branch), in coordination with the Eastern Municipal Water District (EMWD), announced availability of a Draft Environmental Impact Statement (EIS) for the Hemet/San Jacinto Integrated Recharge and Recovery Project. The announced deadline for submittal of comments has been corrected in order to meet the statutory 45-day requirement. The new deadline is October 31, 2006.
Spring Viremia of Carp; Import Restrictions on Certain Live Fish, Fertilized Eggs, and Gametes
Document Number: Z6-14478
Type: Rule
Date: 2006-09-15
Agency: Department of Agriculture, Animal and Plant Health Inspection Service, Department of Defense, Department of the Interior, Bureau of Land Management, Department of the Army, Corps of Engineers
Notice of Availability for the Draft Environmental Impact Statement for Hemet/San Jacinto Integrated Recharge and Recovery Project, Riverside County, CA
Document Number: 06-7649
Type: Notice
Date: 2006-09-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Branch), in coordination with the Eastern Municipal Water District (EMWD), has completed a Draft Environmental Impact Statement (EIS) for the Hemet/San Jacinto Integrated Recharge and Recovery Project. EMWD requires authorization pursuant to Section 404 of the Clean Water Act for 53.1 acres of fill into waters of the U.S. A public hearing will be held at the Simpson Center (305 East Devonshire Avenue, Hemet, CA 92543) on September 19, 2006 from 5:30 to 6:30 p.m.
Availability of a Draft Integrated Feasibility Report and Environmental Impact Statement for the Mid-Chesapeake Bay Island Ecosystem Restoration Project in Dorchester County, on Maryland's Eastern Shore
Document Number: 06-7506
Type: Notice
Date: 2006-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft Integrated Feasibility Report and Environmental Impact Statement (EIS) for the Mid-Chesapeake Bay Island Ecosystem Restoration Project in Dorchester County, on Maryland's Eastern Shore. Approximately 90 to 95 million cubic yards of material, primarily dredged during maintenance of the Chesapeake Bay approach channels to Baltimore Harbor, would be placed behind dikes at James Island. Material placed at Barren Island would be from authorized maintenance dredging of Federal navigation channels in the Honga River. After placement, the material would be shaped and planted to provide 2,144 acres of island habitat at James and Barren Islands as well as protect existing island ecosystem habitat, including critical submerged aquatic vegetation.
Notice of Intent To Prepare a Draft Environmental Impact Statement for a Proposed Cumberland County Regional Water Supply Project, Cumberland County, TN
Document Number: E6-14144
Type: Notice
Date: 2006-08-25
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Corps of Engineers, Nashville District intends to prepare a Draft Environmental Impact Statement (DEIS) for a regional water supply project in Cumberland County, TN. This DEIS is necessary to provide National Environmental Policy Act (NEPA) coverage for a proposed regional water supply system capable of providing the county a reliable water supply for 50 years. The county is currently served by six water systems and development of individual water sources has been problematic from an environmental perspective. The county's current water supply capacity is approximately ten million gallons per day. A regional approach has been recommended to allow more efficient planning to develop future water supplies in an environmentally acceptable manner.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for the Berth 97-109 Container Terminal Project, Los Angeles County, CA
Document Number: E6-13755
Type: Notice
Date: 2006-08-21
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Branch), in coordination with the Port of Los Angeles, has completed a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Berth 97-109 Container Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act for wharf and terminal development (142 acres) in three phases, dredging up to 41,000 cubic yards of sediment, construction of two new concrete pile-supported wharves (for a total of 2,500 feet), new terminal buildings and two new terminal bridges.
Intent To Prepare an Environmental Impact Statement To Evaluate the Impacts Associated With a Previously Authorized Pier Extension in Strait of Georgia at Cherry Point, Near Ferndale, Whatcom County, WA
Document Number: E6-13473
Type: Notice
Date: 2006-08-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) Seattle District is the permitting agency and lead Federal agency for this action. The U.S Coast Guard (USCG) is cooperating agency. The Corps is announcing its intent to prepare an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). The EIS will support the Corps' permit evaluation process under Section 10 of the Rivers and Harbors Act for the BP Cherry Point marine pier extension.
Intent To Prepare a Draft Environmental Impact Statement for Mississippi Coastal Improvements Program, Hancock, Harrison, and Jackson Counties, MS
Document Number: 06-6794
Type: Notice
Date: 2006-08-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with actions to comprehensively address hurricane and storm damage reduction, prevention of saltwater intrusion, preservation of fish and wildlife, prevention of erosion, and other related water resource purposes in coastal Mississippi. These actions are related to the consequences of hurricanes in the Gulf of Mexico in 2005. The Corps will forward recommendations to Congress authorized by the Department of Defense Appropriations Act, 2006 (Pub. L. 109-148) dated December 30, 2005. The EIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA).
Intent To Prepare a Second Supplemental Environmental Impact Statement to the Final EIS on Herbert Hoover Dike Major Rehabilitation and Evaluation Report, Reaches 2 and 3, in Palm Beach and Glades Counties, FL
Document Number: 06-6793
Type: Notice
Date: 2006-08-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On July 8, 2005, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued a Final Supplemental Environmental Impact Statement (FSEIS) for the Major Rehabilitation actions proposed for Herbert Hoover Dike (HHD), Reach One. Herbert Hoover Dike is the levee that completely surrounds Lake Okeechobee. On September 23, 2005, a Record of Decision was signed adopting the preferred alternative as the Selected Plan for Reach One. At this time the Corps plans to extend rehabilitation along Reaches Two and Three of HHD. This stretch of HHD extends for approximately 27 miles between an area west of Belle Glade, Palm Beach County to east of Moore Haven, Glades County, FL.
Record of Decision for the Boston Harbor Inner Harbor Maintenance Dredging Project
Document Number: 06-6792
Type: Notice
Date: 2006-08-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New England District announces its decision to maintenance dredge the following Federal navigation channels in Boston Harbor, Massachusetts: the Main Ship Channel upstream of Spectacle Island to the Inner Confluence, the upper Reserved Channel, the approach to the Navy Dry Dock, a portion of the Mystic River, and a portion of the Chelsea River (previously permitted). Maintenance dredging of the navigation channels landward of Spectacle Island is needed to remove shoals and restore the Federal navigation channels to their authorized depths. Dredged material suitable for unconfined open water disposal will be disposed at the Massachusetts Bay Disposal Site; material not suitable for unconfined open water disposal will be disposed in confined aquatic disposal (CAD) cell(s) located within the navigation channels. Major navigation channel improvements (deepening) were made in 1999 through 2001 in the Reserved Channel, the Mystic River, Inner Confluence, and the Chelsea River. A Final Environmental Impact Statement (EIS) prepared in June 1995 for this previous navigation improvement project (Boston Harbor Navigation Improvement ProjectBHNIP) identified selected use of CAD cells in the Mystic River, Inner Confluence, and Chelsea River for disposal. A Supplemental Draft and Final EIS was prepared for this maintenance dredging project and built on the lessons learned from the previous improvement project. A new CAD cell for the proposed maintenance project will be constructed in the Mystic River (previously permitted) and in the Main Ship Channel just below the Inner Confluence.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed SunCreek Project, in Sacramento County, CA
Document Number: 06-6193
Type: Notice
Date: 2006-07-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Sacramento District, will prepare a Draft Environmental Impact Statement (DEIS) for Corps authorization actions on the proposed SunCreek Specific Plan project, which as proposed would result in the permanent loss of approximately 18.25 acres of waters of the United States, including vernal pools and other wetlands. The overall project purpose is to construct large scale mixed-use development in Sacramento County.
Intent To Prepare a Draft Environmental Impact Statement for a Proposed First Broad First Reservoir in Cleveland County, NC
Document Number: 06-6139
Type: Notice
Date: 2006-07-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Cleveland County Sanitary District (CCSD) is applying for a Department of the Army permit under Section 404 of the Clean Water Act (33 U.S.C. 134) to impact approximately 24 miles of river and stream habitat and approximately 1 acre of wetlands with the construction of a dam and water supply reservoir on the First Broad River. The proposed dam site is one mile north of the Town of Lawndale in Cleveland County, NC. The CCSD is proposing this action for the purpose of increasing the water supply for its service area and the region. Based on current rates of growth, CCSD has projected that water needs for its customers will double by the year 2050. Projected regional water demand indicate that existing water supplies are inadequate for future needs. The proposed reservoir would also lessen the occurrence of water shortages during drought conditions. In accordance with the National Environmental Policy Act (NEPA), a Draft Environmental Impact Statement (DEIS) will be prepared to evaluate and compare alternatives for increasing water supply and to assess associated impacts.
Notice of Availability of Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project
Document Number: 06-6138
Type: Notice
Date: 2006-07-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The comment period for the Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project published in the Federal Register on Friday, May 5, 2006 (71 FR 26478), required comments be submitted 45 days (June 19, 2006) following publication in the Federal Register. The comment period was extended to 60 days (July 5, 2006) in the Federal Register on Tuesday, June 13, 2006 (71 FR 34077). The comment period has now been extended to 100 days (August 14, 2006).
Intent To Prepare a Draft Programmatic Environmental Impact Statement for the Beneficial Use of Dredged Material Program Study as Introduced in the 2004 Louisiana Coastal Area, Louisiana Ecosystem Restoration Study, Programmatic Environmental Impact Statement
Document Number: E6-10273
Type: Notice
Date: 2006-06-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New Orleans District, is initiating this study under the authority provided by the resolutions adopted by the Committees on Public Works of the U.S. Senate and House of Representatives, dated April 19, 1967 and October 19, 1967, respectively, an expansion of the authority created under section 3 of the River and Harbor Act approved June 13, 1902. The Louisiana Coastal Area (LCA) Beneficial Use of Dredged Material Program will optimize the use of dredged material resulting from the maintenance of federally maintained navigational channels to (1) restore formerly existing coastal wetlands; (2) reduce, halt or reverse the loss of existing coastal wetlands; (3) create coastal wetlands where none existed previously; or (4) provide protection to any of the above wetland situations or other coastal landscape features within the study placement area. The LCA Beneficial Use of Dredged Material Program costs are those costs incurred above and beyond the ordinary costs incurred with USACE Operations and Maintenance dredging and disposal operations in accordance with their established base plan for maintenance dredging activities. The base plan is determined by applying the Federal Standard which requires maintenance dredging and disposal activities to be conducted in the most cost effective, environmentally acceptable manner. The study area is Louisiana's coastal area from Mississippi to Texas. Louisiana parishes included in the study area include Ascension, Assumption, Calcasieu, Cameron, Iberia, Jefferson, Lafourche, Livingston, Orleans, Plaquemines, St. Bernard, St. Charles, St. James, St. John the Baptist, St. Martin, St. Mary, St. Tammany, Tangipahoa, Terrebonne, and Vermilion. The following seven navigation channels represent an initial list of areas with the most significant opportunities (1) Calcasieu River and Pass; (2) Houma Navigation Canal; (3) Atchafalaya River and Bayous Chene, Boeuf, and Black; (4) Bayou Lafourche; (5) Mississippi River and Tributaries Project, Head of Passes and Southwest Pass; (6) Barataria Bay Waterway; and (7) Mississippi River Gulf Outlet (although this channel is not currently funded for O&M dredging).
Notice of Solicitation for Estuary Habitat Restoration Program
Document Number: 06-5927
Type: Notice
Date: 2006-06-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Congress has appropriated limited funds to the U.S. Army Corps of Engineers (Corps) to implement the Estuary Habitat Restoration Program as authorized in Section 104 of the Estuary Restoration Act of 2000, Title I of the Estuaries and Clean Waters Act of 2000 (Pub. L. 106-457) (accessible at https://era.noaa.gov/pdfs/acts835.pdf). On behalf of the Estuary Habitat Restoration Council (Council), the Corps is soliciting proposals for estuary habitat restoration projects. This document describes project criteria and evaluation criteria the Council will use to determine which projects to recommend. Recommended projects must provide ecosystem benefits, have scientific merit, be technically feasible, and be cost-effective. Proposals selected for Estuary Habitat Restoration Program funding will be implemented in accordance with a cost-share agreement with the Corps. This is not a grants program.
Chief of Engineers Environmental Advisory Board
Document Number: 06-5922
Type: Notice
Date: 2006-06-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Date of Meeting: July 19, 2006. Place: U.S. Army Engineer Research and Development Center, Coastal and Hydraulics Laboratory, 3909 Halls Ferry Road, Vicksburg, MS 39180- 6199. Time: 8:30 a.m. to 3 p.m.
Intent to Prepare a Draft Environmental Impact Statement for the Brooklyn Navy Yard, Brooklyn, Kings County, NY
Document Number: 06-5921
Type: Notice
Date: 2006-06-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), New York District, is preparing a Draft Environmental Impact Statement (DEIS) to ascertain compliance with and to lead to the production of a National Environmental Policy Act (NEPA) document in accordance with the President's Council of Environmental Quality (CEQ) Rules and Regulations, as defined and amended in 40 Code of Federal Regulations (CFR), Parts 1500-1508, Corps principals and guidelines as defined in Engineering Regulations (ER) 1105-2-100, other applicable Federal and State environmental laws for the proposed Brooklyn Navy Yard Project. The study area consists of the portion of the Navy Yard commonly known as ``Admiral's Row'' and ``Officer Quarters''. The Navy Yard is located in the Greenpoint section of Brooklyn, Kings County, NY. This parcel, located within the former Brooklyn Navy Yard, would be transferred to the City of New York. The EIS process will determine if there are any environmental and cultural concerns that will affect the sale of the land. The land would be developed in accordance with the mission of the Brooklyn Navy Yard Development Corporation and the City of New York.
Coastal Engineering Research Board (CERB)
Document Number: 06-5919
Type: Notice
Date: 2006-06-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Availability of a Supplement to the Draft Environmental Impact Statement for the Proposed Construction of a Dredged Material Containment Facility in the Patapsco River, at Masonville, Baltimore City, MD
Document Number: 06-5918
Type: Notice
Date: 2006-06-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed construction of a dredged material containment facility (DMCF) by the Maryland Port Administration (MPA). This DEIS was prepared as part of the submission of MPA's application for a Department of the Army permit to construct the facility in the Patapsco River, Baltimore City, MD. This application will be evaluated pursuant to Section 10 or the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. The preferred alternative is for the construction of a stone, sand, and cofferdam structure that would impact approximately 131 acres of waters of the United States, including jurisdictional wetlands. The structure would be initially constructed to 10 feet above the mean lowe low water (MLLW) elevation, with a future temporary elevation to 42 feet above MLLW, and an ultimate elevation of 36 feet above MLLW. The project would also include mechanical dredging of approximately 1.7 million cubic yards of overburden material within the footprint of the proposed disposal site, and the placement of this material at the Hart Miller Island disposal site, Baltimore County, MD. On-site and off-site borrow material would be used for the construction of the containment facility. This proposal was advertised in the Federal Register on May 19, 2006 (71 FR 29128). The need to prepare a Supplement is due to the applicant's proposal to change the source of borrow material for the proposed construction of the preferred alternative. The applicant wishes to use suitable material dredged from the channel at the Seagirt Marine Terminal for the construction of a portion of the containment structure. Approximately 0.5 to 0.8 million cubic yards of sand and gravel obtained from dredging to a maximum of 54 feet below mean low water at Seagirt Marine Terminal would be used at the proposed Masonville DMCF. Detailed description of the proposed modifications and effects to the human environment are discussed in the supplement to the DEIS for the Masonville DMCF.
Intent To Prepare Draft Environmental Impact Statement for the Proposed Implementation of Interim Water Storage Contracts Associated With the Southeastern Federal Power Customers Settlement Agreement, at Lake Sidney Lanier/Buford Dam, GA
Document Number: 06-5444
Type: Notice
Date: 2006-06-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Mobile District, intends to prepare a Draft Environmental Impact Statement (EIS), as required by the National Environmental Policy Act (NEPA), to address the proposed implementation of interim water storage contracts at Lake Sidney Lanier/Buford Dam, GA, as contained in a settlement agreement associated with the Southeastern Federal Power Customers, Inc. (SeFPC) v. Secretary of the Army, et al. (1:00CV02954-TPJ) lawsuit. The Draft EIS will also address any changes in water management operations at the reservoir project, as well as the potential for other changes to operations in downstream reservoir projects, which would result from implementation of the settlement agreement.
Availability of the Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, AR
Document Number: C6-5057
Type: Notice
Date: 2006-06-14
Agency: Department of Defense, Federal Communications Commission, Agencies and Commissions, Department of Homeland Security, Department of the Army, Corps of Engineers, Customs and Border Protection, Engineers Corps, Army Department
Intent To Prepare a Draft Supplement to the Environmental Impact Statement to Evaluate Construction of Authorized Improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS
Document Number: 06-5385
Type: Notice
Date: 2006-06-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Supplement to the Environmental Impact Statement (DSEIS) to address the potential impacts associated with construction of authorized improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS. The DSEIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA) and evaluating the following two alternative plans: ``No Action'' and widening and deepening to the authorized project dimensions. Construction of some of the authorized improvements was completed in 1999. Remaining authorized elements which will be evaluated include widening the Gulf Entrance channel from 450 feet to 550 feet wide and deepening the Upper Pascagoula channel from 38 feet to 42 feet deep.
Notice of Availability of Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project
Document Number: 06-5339
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The comment period for the Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project published in the Federal Register on Friday, May 5, 2006 (71 FR 26478), required comments be submitted 45 days (June 19, 2006) following publication in the Federal Register. The comment period has been extended to 60 days (July 5, 2006).
Inland Waterways Users Board
Document Number: 06-5337
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Intent to Prepare a Supplement to the Final Environmental Statement for the Area VI (Elm Fork of the North Fork of the Red River) Portion of the Red River Chloride Control Project, Texas and Oklahoma
Document Number: 06-5336
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The purpose of the Supplement to the Final Environmental Statement (SFES) is to address alternatives and modifications to the authorized plan for chloride control at Area VI on the Elm Fork of the North Fork of the Red River, OK.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for Millington and Vicinity, Tennessee
Document Number: 06-5317
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Millington, Tennessee and Vicinity Feasibility Study will be conducted to analyze problems being experienced in the Big Creek drainage basin and evaluate alternatives to provide plans for ecosystem restoration, flood damage reduction, and recreation. National Ecosystem Restoration (NER) benefits will be evaluated with respect to the net change in habitat quantity and/or quality and expressed quantitatively in physical units and indices, but not monetary units. If justified, the feasibility study and EIS will recommend a plan.
Intent To Hold a North Dakota River Task Force Meeting as Established by the Missouri River Protection and Improvement Act of 2000 (Title VII)
Document Number: 06-5275
Type: Notice
Date: 2006-06-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The duties of the Task Force are to prepare and approve a plan for the use of the funds made available under Title VII to promote conservation practices in the Missouri River watershed, control and remove the sediment from the Missouri River, protect recreation on the Missouri River from sedimentation and protect Indian and non-Indian historical and cultural sites along the Missouri River from erosion.
Availability of the Final Supplemental Environmental Impact Statement for the Boston Harbor Inner Harbor Maintenance Dredging Project
Document Number: 06-5058
Type: Notice
Date: 2006-06-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New England District has prepared a Final Supplemental Environmental Impact Statement to maintenance dredge the following Federal navigation channels: The Main Ship Channel upstream of Spectacle Island to the Inner Confluence, the upper Reserved Channel, the approach to the Navy Dry Dock, a portion of the Mystic River, and a portion of the Chelsea River (previously permitted) in Boston Harbor, MA. Maintenance dredging of the navigation channels landward of Spectacle Island is needed to remove shoals and restore the Federal navigation channels to their authorized depths. Materials dredged from the Federal channels will either be disposed at the Massachusetts Bay Disposal Site (for the material suitable for unconfined open water disposal) or, for the material not suitable for unconfined open water disposal, in confined aquatic disposal (CAD) cell(s). Major navigation channel improvements (deepening) were made in 1999 through 2001 in the Reserved Channel, the Mystic River, Inner Confluence and the Chelsea River. A Final EIS prepared for this previous navigation improvement project in June of 1995 identified selected use of CAD cells in the Mystic River, Inner Confluence, and Chelsea River were investigated. A new CAD cell for the proposed maintenance project will be constructed in the Mystic River and in the Main Ship Channel just below the Inner Confluence.
Availability of the Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, AR
Document Number: 06-5057
Type: Notice
Date: 2006-06-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers (USACE), Little Rock District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed implementation of the White River Minimum Flow, Arkansas. This DEIS is being made available for a 45-day public comment period.
Notice of Availability of a Draft Integrated System Investment Plan and Programmatic Environmental Impact Statement for the Ohio River Mainstem System Study
Document Number: C6-4884
Type: Notice
Date: 2006-06-01
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Notice of Availability of a Draft Integrated System Investment Plan and Programmatic Environmental Impact Statement for the Ohio River Mainstem System Study
Document Number: 06-4884
Type: Notice
Date: 2006-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
a. Pursuant to the National Environmental Policy Act (NEPA), the Great Lakes and Ohio River Division of the U.S. Army Corps of Engineers (Corps) is seeking comments on a draft System Investment Plan and Programmatic Environmental Impact Statement (SIP/PEIS) that evaluates alternative investment strategies for the maintenance of commercial navigation infrastructure along with the ecosystem sustainability needs on the Ohio River System for the next 60 years. b. The primary purpose of the Ohio River Mainstem Systems Study (ORMSS) is to develop the best SIP for maintaining safe, environmentally sustainable, and reliable navigation on the Ohio River over a 60-year period from 2010 to 2070. The study evaluated the operation and maintenance, rehabilitation, and construction reinvestment needs at the 19 navigation lock and dam sites on the Ohio River Mainstem. The study reports on five plans for meeting these needs based on five different traffic forecast scenarios. The future reliable operation of these structures is critical to the continued growth in commercial navigation throughout the Ohio River basin. In response to stakeholder input, the study purpose was modified to include the identification of measures to improve ecological sustainability to provide a balance between economic and environmental improvements. c. In order to facilitate review, the Corps will be conducting six public meetings along the Ohio River to solicit comments on its proposed plan. (See SUPPLEMENTARY INFORMATION for dates, times and locations). d. The Corps will be providing copies of the SIP/PEIS at numerous locations for review by the public. (See SUPPLEMENTARY INFORMATION for locations). e. The review and comment period for this draft document will be 60 days.
Intent To Prepare a Real Estate Supplement/Third Supplemental Environmental Impact Statement (RES/SEIS) to the Final SEIS on Modified Water Deliveries to Everglades National Park, Tamiami Trail Feature, Miami-Dade County, FL, November 2005
Document Number: 06-4883
Type: Notice
Date: 2006-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In November 2005, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued a Final 2nd Supplemental Environmental Impact Statement (SEIS) for the Tamiami Trail feature of the Modified Water Deliveries (MWD) project to Everglades National Park in Miami- Dade County, FL. That SEIS assumed that the National Park Service (NPS) would acquire the necessary real estate interests in seven privately- owned parcels of land adjacent to the south side of Tamiami Trail to avoid flooding impacts after the Tamiami Trail project was constructed and ecosystem restoration water flows were directed south into Everglades National Park. It is now concluded that the NPS will be unable to complete the acquisition of real estate rights in time to meet the overall schedule of the MWD project. The Corps now proposes to take over responsibility for the acquisition and address the related impacts in a supplement to the previous SEIS.
Intent to Prepare a Draft Environmental Impact Statement for Residential, Commercial, and Marine Development Along the Gulf Intracoastal Waterway
Document Number: 06-4881
Type: Notice
Date: 2006-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with mixed-use waterfront development along the Gulf Intracoastal Waterway (GIWW) in Baldwin County, AL, specifically the stretch known as the ``Foley Land Cut''. The Corps will be evaluating 14 separate permit applications for the proposed work under the authority of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The EIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA).
Compensatory Mitigation for Losses of Aquatic Resources
Document Number: E6-7837
Type: Proposed Rule
Date: 2006-05-23
Agency: Department of Defense, Environmental Protection Agency, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On March 28, 2006, the U.S. Army Corps of Engineers (the Corps) and the Environmental Protection Agency (EPA) published a proposed rule to revise regulations governing compensatory mitigation for activities authorized by permits issued by the Department of the Army. The Corps and EPA announce the extension of the public comment period for this proposed rule until June 30, 2006. The 30-day extension of the comment period is a result of requests from a number of entities to allow more time to comment on the proposed rule. Comments previously submitted need not be resubmitted, as they have already been incorporated into the public record and will be fully considered in the final rule.
Availability of Partially Exclusive, Exclusive or Non Exclusive License
Document Number: Z6-7331
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Employee Benefits Security Administration, Department of Labor, Department of Energy, Federal Aviation Administration, Department of Transportation, Management and Budget Office, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Notice of Availability of the Final Environmental Impact Statement for the Proposed Everglades Agricultural Area (EAA) A-1 Reservoir located in Palm Beach County, FL
Document Number: E6-7644
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Final Environmental Impact Statement (FEIS) has been completed and is available for review and comment.
Exchange of Government Property at Devens Reserve Forces Training Area to MassDevelopment for Future Development
Document Number: E6-7643
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10 United States Code 2869, the Department of the Army intends to enter into an Exchange Agreement with MassDevelopment for the exchange of 13.57+/- acres of Government owned land at Devens Reserve Forces Training Area, Devens, Massachusetts, in exchange for renovations to several buildings at Devens Reserve Forces Training Area. The purpose of this notice is to effect the exchange pursuant to provisions of 10 U.S.C. 2869. This is a partial transfer of the entire acreage located at the facility. Additional information is on file with the U.S. Army Engineer District, Corps of Engineers, Louisville, Kentucky.
Intent To Prepare a Draft Environmental Impact Statement for the Seven Oaks Dam Water Quality Study, San Bernadino County, CA
Document Number: 06-4685
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
With the construction of Seven Oaks Dam, during and immediately after storm events, water flows into the pool of water impounded behind the dam may be turbid. Once water is impounded behind the dam, all water flowing in the Santa Ana River that enters Seven Oaks Reservoir must pass through that impoundment before being released at the dam. To the extent that water impounded behind the dam can have a higher level of sediment or algae than water flowing in the Santa Ana River below the Southern California Edison (SCE) No. 1 Powerhouse, the quality of water released from Seven Oaks Dam into the Santa Ana River may be reduced. The purpose of the study is to evaluate the potential impacts, if any, of the Seven Oaks Dam regarding downstream water quality and to characterize upstream water quality. This will entail characterization of the water quality conditions that existed prior to dam construction and determination of how or whether the dam has contributed to water quality impairment as part of the ``baseline conditions analysis''. After the analysis, future studies would be determined with the resource agencies, Local Sponsors, and Stakeholders.
Availability of Draft Environmental Impact Statement for the Proposed Construction of a Dredged Material Containment Facility in the Patapsco River, at Masonville, Baltimore City, MD
Document Number: 06-4683
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed construction of a dredged material containment facility (DMCF) by the Maryland Port Administration (MPA). This DEIS was prepared as part of the submission of MPA's application for a Department of the Army permit to construct the facility in the Patapsco River, Baltimore City, MD. This application will be evaluated pursuant to section 10 or the Rivers and Harbors Act of 1899 and section 404 of the Clean Water Act. The preferred alternative is for the construction of a stone, sand, and cofferdam structure that would impact approximately 131 acres of waters of the United States, including jurisdictional wetlands. The structure would be initially constructed to 10 feet above the mean lower low water (MLLW) elevation, with a future temporary elevation to 42 feet above MLLW, and an ultimate elevation of 36 feet above MLLW. The project would also include mechanical dredging of approximately 1.7 million cubic yards of overburden material within the footprint of the proposed disposal site, and the placement of this material at the Hart Miller Island disposal site, Baltimore County, MD. Hydraulic dredging of approximately 1.5 million cubic yards of sand would be performed, and the sand used to construct the outer portion of the containment structure. Approximately 0.5 million cubic yards of clay is to be mechanically/hydraulically dredged and placed on the inside of this structure. Two new spillway structures and discharge outfalls are to be included in the construction of the DMCF. Other work associated with the construction of the DMCF is the relocation of a city water main line and storm drain systems, and the relocation of a commercial mooring buoy. The total proposed footprint of the proposed project is 141 acres.
Availability of Partially Exclusive, Exclusive or Non Exclusive License
Document Number: E6-7331
Type: Notice
Date: 2006-05-15
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Department of the Army, U.S. Army Corps of Engineers, announces the general availability of partially exclusive, exclusive or non exclusive licenses under the following pending patents listed under SUPPLEMENTARY INFORMATION. Any license granted shall comply with 35 U.S.C. 209 and 37 CFR part 404.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.