Department of Energy December 30, 2024 – Federal Register Recent Federal Regulation Documents

Determination Regarding Energy Efficiency Improvements in the 2024 International Energy Conservation Code
Document Number: 2024-31024
Type: Notice
Date: 2024-12-30
Agency: Department of Energy
The U.S. Department of Energy (DOE) has reviewed the 2024 International Energy Conservation Code (IECC) and determined the updated edition would improve energy efficiency in residential buildings. DOE analysis indicates that buildings meeting the 2024 IECC, as compared with buildings meeting the 2021 IECC, would result in national site energy savings of 7.80 percent, source energy savings of 6.80 percent, and energy cost savings of approximately 6.60 percent of residential building energy consumption. Under the Energy Conservation and Production Act, as amended (ECPA), upon publication of an affirmative determination, each State must review the energy efficiency provisions of its residential building code and determine whether it is appropriate for such state to revise its building code to meet or exceed the 2024 IECC. Additionally, this notification provides guidance on state code review processes and associated certifications.
Wyoming Interstate Company, L.L.C.; Notice of Request for Extension of Time
Document Number: 2024-31052
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
White, William T.; Notice of Filing
Document Number: 2024-31051
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2024-31337
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2024-31336
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Institution of Section 206 Proceeding and Refund Effective Date
Document Number: 2024-31333
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Briar Hydro Associates; Notice of Authorization for Continued Project Operation
Document Number: 2024-31071
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2024-31070
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Swan Lake North Hydro LLC; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-31332
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Western Power Pool; Notice of Filing
Document Number: 2024-30870
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Federal Energy Regulatory Commission
Colorado River Storage Project-Rate Order No. WAPA-220
Document Number: 2024-30863
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Western Area Power Administration
The Colorado River Storage Project (CRSP) Management Center (MC) of the Western Area Power Administration (WAPA) proposes new formula rates for CRSP transmission and ancillary services for CRSP MC's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP MC decide to become a member of SPP. The proposed formula rates will become effective on the latter of CRSP MC's membership date or the go-live date of the expansion of the SPP Regional Transmission Organization (RTO) into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for 5 years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-218
Document Number: 2024-30858
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Western Area Power Administration
The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA) proposes new formula rates for the Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) transmission and ancillary services for UGP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should UGP decide to expand its participation in SPP in the Western Interconnection. These rates will be used by UGP to provide rate data to SPP, the Regional Transmission Organization (RTO) of which UGP is a member, after SPP's planned expansion of the RTO into the Western Interconnection on April 1, 2026. The existing UGP rates for services expire on September 30, 2025, but are being extended under a separate rate process, Rate Order No, WAPA-217, to continue to provide existing rate data to SPP between October 1, 2025, and final implementation date of the planned RTO expansion into the Western Interconnection. The proposed rates will address UGP operating changes and new provisions and settlement requirements under the proposed revisions to SPP's Tariff filed with the Federal Energy Regulatory Commission (FERC) to accommodate their RTO expansion into the Western Interconnection. The proposed formula rates will become effective on the go-live date of the expansion of the SPP RTO into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for five years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.