Federal Register / Vol. 89, No. 249 / Monday, December 30, 2024 / Notices
and necessity and whether the
Commission’s environmental analysis
for the certificate complied with the
National Environmental Policy Act
(NEPA).4 At the time a pipeline requests
an extension of time, orders on
certificates of public convenience and
necessity are final and the Commission
will not re-litigate their issuance.5 The
Director of the Office of Energy Projects,
or his or her designee, will act on all of
those extension requests that are
uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
The Commission strongly encourages
electronic filings of comments in lieu of
paper using the ‘‘eFile’’ link at https://
www.ferc.gov. In lieu of electronic filing,
you may submit a paper copy which
must reference the Project docket
number.
To file via USPS: Debbie-Anne A.
Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other courier: DebbieAnne A. Reese, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
4 Similarly,
the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
5 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
VerDate Sep<11>2014
23:58 Dec 27, 2024
Jkt 265001
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comment Date: 5:00 p.m. Eastern
Time on January 3, 2024.
Dated: December 19, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–31052 Filed 12–27–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ID–10232–000]
White, William T.; Notice of Filing
Take notice that on December 18,
2024, of William T. White. submitted for
filing, application for authority to hold
interlocking positions, pursuant to
section 305(b) of the Federal Power Act,
16 U.S.C. 825d (b) and Part 45.8 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR part
45.8.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
106463
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at 202–502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comment Date: 5:00 p.m. Eastern
Time on January 8, 2025.
Dated: December 19, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–31051 Filed 12–27–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR25–23–000.
Applicants: Black Hills/Kansas Gas
Utility Company, LLC.
E:\FR\FM\30DEN1.SGM
30DEN1
106464
Federal Register / Vol. 89, No. 249 / Monday, December 30, 2024 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
Description: 284.123(g) Rate Filing:
BHKG Revised SOC and Statement of
Rates to be effective 11/1/2024.
Filed Date: 12/18/24.
Accession Number: 20241218–5267.
Comment Date: 5 p.m. ET 1/8/25.
284.123(g) Protest: 5 p.m. ET 2/17/25.
Docket Numbers: RP25–291–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 4(d) Rate Filing: 12.18.24
Negotiated Rates—Mercury Energy
America, LLC H–7540–89 to be effective
12/18/2024.
Filed Date: 12/18/24.
Accession Number: 20241218–5232.
Comment Date: 5 p.m. ET 12/30/24.
Docket Numbers: RP25–292–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rate Agreement Update
(NRG Feb 2025) to be effective 2/1/2025.
Filed Date: 12/18/24.
Accession Number: 20241218–5240.
Comment Date: 5 p.m. ET 12/30/24.
Docket Numbers: RP25–293–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Shell Feb 2025) to be effective 2/1/
2025.
Filed Date: 12/19/24.
Accession Number: 20241219–5131.
Comment Date: 5 p.m. ET 12/31/24.
Docket Numbers: RP25–294–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: 4(d) Rate Filing: MEP
December 2024 NRA Filing to be
effective 1/1/2025.
Filed Date: 12/19/24.
Accession Number: 20241219–5180.
Comment Date: 5 p.m. ET 12/31/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: PR25–16–001.
Applicants: Black Hills Energy
Arkansas, Inc.
Description: 284.123(g) Rate Filing:
BHEA Amended SOC Filing to be
effective 10/14/2024.
Filed Date: 12/19/24.
Accession Number: 20241219–5151.
Comment Date: 5 p.m. ET 1/9/25.
Any person desiring to protest in any
the above proceedings must file in
VerDate Sep<11>2014
23:58 Dec 27, 2024
Jkt 265001
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 19, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
[FR Doc. 2024–31070 Filed 12–27–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3240–000]
Briar Hydro Associates; Notice of
Authorization for Continued Project
Operation
The license for the Rolfe Canal
Hydroelectric Project No. 3240 was
issued for a period ending November 30,
2024.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 3240
is issued to Briar Hydro Associates for
a period effective December 1, 2024,
through November 30, 2025, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first.
If issuance of a new license (or other
disposition) does not take place on or
before November 30, 2025, notice is
hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Briar Hydro Associates is
authorized to continue operation of the
Rolfe Canal Hydroelectric Project under
the terms and conditions of the prior
license until the issuance of a
subsequent license for the project or
other disposition under the FPA,
whichever comes first.
Dated: December 19, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
[FR Doc. 2024–31071 Filed 12–27–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC25–38–000]
Western Power Pool; Notice of Filing
Take notice that on December 13,
2024, Northwest Power Pool d/b/a
Western Power Pool (WPP) submitted a
request for waiver of the Federal Energy
Regulatory Commission’s (Commission)
requirement to file a certified public
accountant (CPA) certification on a
calendar-year basis and for extensions of
time to file certain CPA certifications.
Any person desiring to intervene or to
protest this filing must file in
E:\FR\FM\30DEN1.SGM
30DEN1
Agencies
[Federal Register Volume 89, Number 249 (Monday, December 30, 2024)]
[Notices]
[Pages 106463-106464]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-31070]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR25-23-000.
Applicants: Black Hills/Kansas Gas Utility Company, LLC.
[[Page 106464]]
Description: 284.123(g) Rate Filing: BHKG Revised SOC and Statement
of Rates to be effective 11/1/2024.
Filed Date: 12/18/24.
Accession Number: 20241218-5267.
Comment Date: 5 p.m. ET 1/8/25.
284.123(g) Protest: 5 p.m. ET 2/17/25.
Docket Numbers: RP25-291-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: 4(d) Rate Filing: 12.18.24 Negotiated Rates--Mercury
Energy America, LLC H-7540-89 to be effective 12/18/2024.
Filed Date: 12/18/24.
Accession Number: 20241218-5232.
Comment Date: 5 p.m. ET 12/30/24.
Docket Numbers: RP25-292-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: 4(d) Rate Filing: Negotiated Rate Agreement Update
(NRG Feb 2025) to be effective 2/1/2025.
Filed Date: 12/18/24.
Accession Number: 20241218-5240.
Comment Date: 5 p.m. ET 12/30/24.
Docket Numbers: RP25-293-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: 4(d) Rate Filing: Negotiated Rate Agreement Update
(Shell Feb 2025) to be effective 2/1/2025.
Filed Date: 12/19/24.
Accession Number: 20241219-5131.
Comment Date: 5 p.m. ET 12/31/24.
Docket Numbers: RP25-294-000.
Applicants: Midcontinent Express Pipeline LLC.
Description: 4(d) Rate Filing: MEP December 2024 NRA Filing to be
effective 1/1/2025.
Filed Date: 12/19/24.
Accession Number: 20241219-5180.
Comment Date: 5 p.m. ET 12/31/24.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: PR25-16-001.
Applicants: Black Hills Energy Arkansas, Inc.
Description: 284.123(g) Rate Filing: BHEA Amended SOC Filing to be
effective 10/14/2024.
Filed Date: 12/19/24.
Accession Number: 20241219-5151.
Comment Date: 5 p.m. ET 1/9/25.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: December 19, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
[FR Doc. 2024-31070 Filed 12-27-24; 8:45 am]
BILLING CODE 6717-01-P