Department of Energy February 2023 – Federal Register Recent Federal Regulation Documents

Results 51 - 100 of 155
Application for Renewal of Authorization To Export Electric Energy; Rainbow Energy Marketing Corporation
Document Number: 2023-03435
Type: Notice
Date: 2023-02-17
Agency: Department of Energy
Rainbow Energy Marketing Corporation (the Applicant or Rainbow) has applied for authorization to transmit electric energy from the United States to Canada pursuant to the Federal Power Act.
Application for Renewal of Authorization To Export Electric Energy; AEP Energy Partners, Inc.
Document Number: 2023-03432
Type: Notice
Date: 2023-02-17
Agency: Department of Energy
AEP Energy Partners, Inc. (the Applicant or AEP-EP) has applied for authorization to transmit electric energy from the United States to Mexico pursuant to the Federal Power Act.
Idaho Irrigation District; New Sweden Irrigation District; Notice of Availability of Final Environmental Assessment
Document Number: 2023-03303
Type: Notice
Date: 2023-02-16
Agency: Department of Energy, Federal Energy Regulatory Commission
S&P Global Commodity Insights (Formerly Platts); Notice of Filing
Document Number: 2023-03302
Type: Notice
Date: 2023-02-16
Agency: Department of Energy, Federal Energy Regulatory Commission
Sunshine Act Meetings
Document Number: 2023-03461
Type: Notice
Date: 2023-02-16
Agency: Department of Energy, Federal Energy Regulatory Commission
Emergency Order Issued to the Electric Reliability Council of Texas, Inc. (ERCOT) To Operate Power Generating Facilities Under Limited Circumstances in Texas as a Result of Extreme Weather
Document Number: 2023-03314
Type: Notice
Date: 2023-02-16
Agency: Department of Energy
The U.S. Department of Energy (DOE or the Department) is issuing this Notice to document emergency actions that it has taken pursuant to the Federal Power Act. DOE issued an emergency order to the Electric Reliability Council of Texas, Inc. (ERCOT) to operate certain power generating facilities under limited circumstances as described further. ERCOT is the independent system operator for over 26 million people in Texas (ERCOT Region). The state of Texas experienced a severe winter weather system that caused a significant drop in temperatures. While the vast majority of generating units in the ERCOT region continued to operate without any problem, a small number of units experienced operating difficulties due to cold weather or gas curtailments. Additional generation required to serve the ERCOT Region was anticipated to result in a conflict with environmental standards and requirements, therefore DOE authorized only the necessary additional generation for ERCOT to sufficiently supply the amount of energy needed to prevent electrical disruption. Because no facilities operated above permitted levels during the emergency as authorized by the DOE order, no environmental impacts resulted from DOE issuing the order. Consequently, DOE has decided not to prepare a special environmental analysis.
Emergency Order Issued to PJM Interconnection, L.L.C. To Operate Power Generating Facilities Under Limited Circumstances in the PJM Region as a Result of Extreme Weather
Document Number: 2023-03313
Type: Notice
Date: 2023-02-16
Agency: Department of Energy
The U.S. Department of Energy (DOE or the Department) is issuing this Notice to document emergency actions that it has taken pursuant to the Federal Power Act. DOE issued an emergency order to PJM Interconnection, L.L.C. (PJM) to operate certain power generating facilities under limited circumstances as described further below. PJM is the regional transmission operator for 65 million people in thirteen states and the District of Columbia (PJM Region). The PJM Region experienced a significant drop in temperatures and high winds due to a severe winter weather system. As a consequence of the impact of wind and decreasing temperatures, the demand for electricity in the PJM Region rose to an unusually high peak load. While the vast majority of generating units in the PJM Region continued to function adequately under these stressed conditions, some units experienced operating difficulties due to cold weather or fuel limitations, primarily gas. Because the additional generation required to serve the PJM Region was anticipated to result in a conflict with environmental standards and requirements, DOE authorized only the necessary additional generation for PJM to sufficiently supply the amount of energy needed to prevent electrical disruption.
Combined Notice of Filings #1
Document Number: 2023-03309
Type: Notice
Date: 2023-02-16
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2023-03308
Type: Notice
Date: 2023-02-16
Agency: Department of Energy, Federal Energy Regulatory Commission
Texas Eastern Transmission, LP; Notice of Waiver Period for Water Quality Certification Application
Document Number: 2023-03307
Type: Notice
Date: 2023-02-16
Agency: Department of Energy, Federal Energy Regulatory Commission
Commission Information Collection Activities (FERC-725I); Comment Request; Extension
Document Number: 2023-03305
Type: Notice
Date: 2023-02-16
Agency: Department of Energy, Federal Energy Regulatory Commission
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on a renewal of currently approved information collection, FERC-725I, (Reporting of Flow Volume and Capacity by Interstate Natural Gas Pipelines), which will be submitted to the Office of Management and Budget (OMB) for review. No Comments were received on the 60-day notice published on December 5, 2022.
Combined Notice of Filings
Document Number: 2023-03207
Type: Notice
Date: 2023-02-15
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2023-03203
Type: Notice
Date: 2023-02-15
Agency: Department of Energy, Federal Energy Regulatory Commission
Grid Deployment Office Draft Guidance on Implementing the Maintaining and Enhancing Hydroelectricity Incentives
Document Number: 2023-03201
Type: Notice
Date: 2023-02-15
Agency: Department of Energy
The U.S. Department of Energy (DOE) gives notice of availability of a Draft Guidance and requests comment on the Draft Guidance to inform its implementation of hydroelectric incentives in the Infrastructure Investment and Jobs Act of 2021 (IIJA). The Draft Guidance describes the application process and the information necessary for the Secretary of Energy to make incentive payments to owners and authorized operators of qualified hydroelectric facilities pursuant to the Energy Policy Act of 2005 (EPAct 2005), Maintaining and Enhancing Hydroelectricity Incentives.
Request for Information-Foundation for Energy Security and Innovation (FESI)
Document Number: 2023-03199
Type: Notice
Date: 2023-02-15
Agency: Department of Energy
The U.S. Department of Energy (DOE) publishes the following questions regarding potential engagement with the Foundation for Energy Security and Innovation (FESI), directed to be established under the CHIPS and Science Act. The purpose of this RFI is to seek input on how DOE stakeholders may engage with the FESI directly, and how DOE may engage with the FESI and the communities it will serve. Interested parties are requested to answer some or all of the questions at their discretion.
Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Public Meetings of the Commercial Unitary Air Conditioner and Commercial Unitary Heat Pump Working Group
Document Number: 2023-03035
Type: Proposed Rule
Date: 2023-02-14
Agency: Department of Energy
The U.S. Department of Energy (DOE or the Department) announces public meetings and webinars for the Commercial Unitary Air Conditioner and Commercial Unitary Heat Pump (CUAC and CUHP) working group.
Natural Gas Pipelines; Project Cost and Annual Limits
Document Number: 2023-02996
Type: Rule
Date: 2023-02-14
Agency: Department of Energy, Federal Energy Regulatory Commission
Pursuant to the authority delegated by the Commission's regulations, the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for each calendar year.
[Project No. 5596-020] HEADTown of Bedford, Virginia; Notice Soliciting Scoping Comments
Document Number: 2023-03105
Type: Notice
Date: 2023-02-14
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2023-03101
Type: Notice
Date: 2023-02-14
Agency: Department of Energy, Federal Energy Regulatory Commission
Energy Conservation Program: Energy Conservation Standards for General Service Fluorescent Lamps
Document Number: 2023-02863
Type: Rule
Date: 2023-02-13
Agency: Department of Energy
The Energy Policy and Conservation Act, as amended (EPCA), prescribes energy conservation standards for various consumer products and certain commercial and industrial equipment, including general service fluorescent lamps (GSFLs). EPCA also requires the U.S. Department of Energy (DOE) to periodically determine whether more- stringent, amended standards would be technologically feasible and economically justified, and would result in significant energy savings. In this final determination, DOE has determined that energy conservation standards for GSFLs do not need to be amended.
Energy Conservation Program: Energy Conservation Standards for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps
Document Number: 2023-02655
Type: Rule
Date: 2023-02-13
Agency: Department of Energy
The Energy Policy and Conservation Act, as amended (``EPCA''), prescribes energy conservation standards for various consumer products and certain commercial and industrial equipment, including Packaged Terminal Air Conditioners (``PTACs'') and Packaged Terminal Heat Pumps (``PTHPs''). EPCA also requires the U.S. Department of Energy (``DOE'') to periodically review standards. In this final determination, DOE has determined that it lacks clear and convincing evidence that more- stringent standards for PTACs and PTHPs would be economically justified. As such, DOE has determined that energy conservation standards for PTACs and PHTPs do not need to be amended.
DOE/NSF Nuclear Science Advisory Committee
Document Number: 2023-03015
Type: Notice
Date: 2023-02-13
Agency: Department of Energy
This notice announces a meeting of the DOE/NSF Nuclear Science Advisory Committee (NSAC). The Federal Advisory Committee Act requires that public notice of these meetings be announced in the Federal Register.
Energy Conservation Program: Test Procedure for Compressors
Document Number: 2023-02589
Type: Proposed Rule
Date: 2023-02-13
Agency: Department of Energy
The U.S. Department of Energy (``DOE'') proposes to amend the test procedure for compressors to correct an error. DOE also proposes to amend the definition of air compressor to include a minor clarification and revise a typographical error. DOE is seeking comment from interested parties on the proposals.
City of Riverside, California; Notice of Filing
Document Number: 2023-03009
Type: Notice
Date: 2023-02-13
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2023-03008
Type: Notice
Date: 2023-02-13
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2023-02892
Type: Notice
Date: 2023-02-10
Agency: Department of Energy, Federal Energy Regulatory Commission
DC Energy, LLC v. PJM Interconnection, L.L.C.; Notice of Request for Comments
Document Number: 2023-02891
Type: Notice
Date: 2023-02-10
Agency: Department of Energy, Federal Energy Regulatory Commission
Pacificorp; Notice of Institution of Section 206 Proceeding and Refund Effective Date
Document Number: 2023-02890
Type: Notice
Date: 2023-02-10
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2023-02887
Type: Notice
Date: 2023-02-10
Agency: Department of Energy, Federal Energy Regulatory Commission
Northern States Power Company-Wisconsin; Notice Soliciting Scoping Comments
Document Number: 2023-02882
Type: Notice
Date: 2023-02-10
Agency: Department of Energy, Federal Energy Regulatory Commission
Interregional High Voltage Direct, Current Merchant Transmission; Notice of Request for Technical Conference
Document Number: 2023-02881
Type: Notice
Date: 2023-02-10
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Intent Regarding the Future Release of Guidance and Application for the Hydroelectric Efficiency Improvement Incentives
Document Number: 2023-02854
Type: Notice
Date: 2023-02-10
Agency: Department of Energy
The Department of Energy (DOE) Grid Deployment Office (GDO) intends to release the final guidance and open the 2023 application period for the Hydroelectric Efficiency Improvement Incentives as authorized through the Energy Policy Act of 2005 (EPAct 2005) and amended by the Infrastructure Investment and Jobs Act (IIJA) of 2021, in the second quarter of calendar year 2023. This notice provides preliminary information regarding the GDO's Hydroelectric Efficiency Improvement Incentives Program, including application requirements and processes that will be further described in the guidance accompanying the upcoming solicitation. All the information contained in this notice is subject to change.
Internal Network Security Monitoring for High and Medium Impact Bulk Electric System Cyber Systems
Document Number: 2023-01453
Type: Rule
Date: 2023-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) is directing the North American Electric Reliability Corporation (NERC) to develop and submit within 15 months of the effective date of this final action for Commission approval new or modified Reliability Standards that require internal network security monitoring within a trusted Critical Infrastructure Protection networked environment for all high impact bulk electric system (BES) Cyber Systems with and without external routable connectivity and medium impact BES Cyber Systems with external routable connectivity. In addition, the Commission directs NERC to perform a study of all low impact BES Cyber Systems with and without external routable connectivity and medium impact BES Cyber Systems without external routable connectivity, as set forth in the final action, and to submit its study report to the Commission within 12 months of the issuance of this final action.
Combined Notice of Filings
Document Number: 2023-02765
Type: Notice
Date: 2023-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #3
Document Number: 2023-02764
Type: Notice
Date: 2023-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2023-02763
Type: Notice
Date: 2023-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #2
Document Number: 2023-02762
Type: Notice
Date: 2023-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2023-02608
Type: Notice
Date: 2023-02-08
Agency: Department of Energy, Federal Energy Regulatory Commission
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.