Notice of Intent Regarding the Future Release of Guidance and Application for the Hydroelectric Efficiency Improvement Incentives, 8837-8838 [2023-02854]
Download as PDF
Federal Register / Vol. 88, No. 28 / Friday, February 10, 2023 / Notices
DDRA Measure 3: The percentage of
DDRA fellows who found employment
that utilized their language and area
studies skills within eight years of
receiving their award.
DDRA Measure 4: Efficiency
Measure—The cost per DDRA fellow
who found employment that utilized
their language and area studies skills
within eight years.
The information provided by grantees
in their performance reports submitted
via the International Resource
Information System (IRIS) will be the
source of data for these measures.
Reporting screens for institutions and
fellows may be viewed at https://
iris.ed.gov/iris/pdfs/DDRA_director.pdf,
and https://iris.ed.gov/iris/pdfs/DDRA_
fellow.pdf.
VII. Other Information
lotter on DSK11XQN23PROD with NOTICES1
Accessible Format: On request to the
program contact person listed under FOR
FURTHER INFORMATION CONTACT,
individuals with disabilities can obtain
this document and a copy of the
application package in an accessible
format. The Department will provide the
requestor with an accessible format that
may include Rich Text Format (RTF) or
text format (txt), a thumb drive, an MP3
file, braille, large print, audiotape, or
compact disc, or other accessible format.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. You may access the official
edition of the Federal Register and the
Code of Federal Regulations at
www.govinfo.gov. At this site you can
view this document, as well as all other
documents of this Department
published in the Federal Register, in
text or Portable Document Format
(PDF). To use PDF, you must have
Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Nasser H. Paydar,
Assistant Secretary for Postsecondary
Education.
[FR Doc. 2023–02827 Filed 2–9–23; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Notice of Intent Regarding the Future
Release of Guidance and Application
for the Hydroelectric Efficiency
Improvement Incentives
Grid Deployment Office,
Department of Energy.
ACTION: Notice of intent (NOI).
AGENCY:
The Department of Energy
(DOE) Grid Deployment Office (GDO)
intends to release the final guidance and
open the 2023 application period for the
Hydroelectric Efficiency Improvement
Incentives as authorized through the
Energy Policy Act of 2005 (EPAct 2005)
and amended by the Infrastructure
Investment and Jobs Act (IIJA) of 2021,
in the second quarter of calendar year
2023. This notice provides preliminary
information regarding the GDO’s
Hydroelectric Efficiency Improvement
Incentives Program, including
application requirements and processes
that will be further described in the
guidance accompanying the upcoming
solicitation. All the information
contained in this notice is subject to
change.
ADDRESSES: The future application
period announcement will be published
in the Federal Register and guidance
will be made available via the GDO
website https://www.energy.gov/gdo/
section-243-hydroelectric-efficiencyimprovement-incentives-program.
FOR FURTHER INFORMATION CONTACT:
Questions may be addressed to Ms.
Luciana Ciocci, U.S. Department of
Energy, Grid Deployment Office, 1000
Independence Ave. SW, Washington,
DC, 20585, (202) 480–5768 or by email
at hydroelectricincentives@hq.doe.gov.
SUPPLEMENTARY INFORMATION: In the
coming weeks, the Grid Deployment
Office intends to open the 2023
application period for section 243 of
EPAct 2005, Hydroelectric Efficiency
Improvement Incentives, as amended by
section 40332 IIJA of 2021, Public Law
117–58.1 At that time, GDO will also
make available an accompanying
guidance document that will describe
the application process and the
information necessary for the Secretary
of Energy to make incentive payments to
owners and authorized operators of
qualified hydroelectric facilities at
existing dams to be used to make capital
improvements in the facilities that are
directly related to improving the
efficiency of such facilities by at least
three percent pursuant to section 243 of
EPAct 2005.2 GDO previously released a
SUMMARY:
VerDate Sep<11>2014
17:41 Feb 09, 2023
Jkt 259001
PO 00000
Law 117–58, div. D, title III, § 40332(a).
U.S.C. 15882(a).
request for information (RFI) and held a
public webinar related to section 243
incentive. See 87 FR 40515 (Jul. 7,
2022). The information gathered
through the RFI and webinar were used
to support the development of the
guidance.
The guidance will describe the
application process and the information
necessary for the Secretary of Energy to
make incentive payments to owners and
authorized operators of qualified
hydroelectric facilities pursuant to
section 243 of EPAct 2005,
Hydroelectric Efficiency Improvement
Incentives. Topics include, eligibility
requirements, general application
requirements and process, procedures
for processing applications, allocation of
funding for eligible projects in the event
of oversubscription, and funding
restrictions.
Under the statute, the incentive
payments include the following
limitations: an incentive payment shall
not exceed 30 percent of the costs of the
applicable capital improvement(s); and
no more than one incentive payment
may be made to a single qualified
hydroelectric facility in any fiscal year
that shall not exceed $5,000,000.3
GDO intends to open the 2023
application period by publishing a
notice in the Federal Register, in the
coming weeks, and releasing the
guidance online, which will be located
at https://www.energy.gov/gdo/section243-hydroelectric-efficiencyimprovement-incentives-program. GDO
anticipates utilizing the Clean Energy
Infrastructure Funding Opportunity
eXCHANGE for submission of
applications once the application period
is opened. The Clean Energy
Infrastructure Funding Opportunity
eXCHANGE is located at https://
infrastructure-exchange.energy.gov/.
A public webinar will be held in the
weeks following the release of the
guidance and 2023 solicitation to
provide clarity on the guidance
document, as necessary. The webinar
will be held in a question and answer
format with registration details available
at https://www.energy.gov/gdo/section243-hydroelectric-efficiencyimprovement-incentives-program in the
near future.
Signing Authority
This document of the Department of
Energy was signed on February 6, 2023,
by Maria Duaime Robinson, Director of
the Grid Deployment Office, pursuant to
delegated authority from the Secretary
of Energy. That document with the
original signature and date is
1 Public
2 42
Frm 00046
Fmt 4703
Sfmt 4703
8837
3 42
E:\FR\FM\10FEN1.SGM
U.S.C. 15882(b).
10FEN1
8838
Federal Register / Vol. 88, No. 28 / Friday, February 10, 2023 / Notices
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on February 7,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–02854 Filed 2–9–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
lotter on DSK11XQN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: RP23–422–000.
Applicants: Ruby Pipeline, L.L.C.
Description: § 4(d) Rate Filing: RP
2023–02–03 Administrative Changes to
be effective 3/6/2023.
Filed Date: 2/3/23.
Accession Number: 20230203–5147.
Comment Date: 5 p.m. ET 2/15/23.
Docket Numbers: RP23–423–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 2.3.23
Negotiated Rates—Freepoint
Commodities LLC R–7250–45 to be
effective 2/3/2023.
Filed Date: 2/3/23.
Accession Number: 20230203–5164.
Comment Date: 5 p.m. ET 2/15/23.
Docket Numbers: RP23–424–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 2.3.23
Negotiated Rates—Macquarie Energy
LLC R–4090–26 to be effective 2/3/2023.
Filed Date: 2/3/23.
Accession Number: 20230203–5167.
Comment Date: 5 p.m. ET 2/15/23.
Docket Numbers: RP23–425–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 2.3.23
Negotiated Rates—Citadel Energy
Marketing LLC R–7705–14 to be
effective 2/3/2023.
Filed Date: 2/3/23.
Accession Number: 20230203–5169.
VerDate Sep<11>2014
17:41 Feb 09, 2023
Jkt 259001
Comment Date: 5 p.m. ET 2/15/23.
DEPARTMENT OF ENERGY
Docket Numbers: RP23–426–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 2.3.23
Negotiated Rates—Castleton
Commodities Merchant Trading L.P. R–
4010–35 to be effective 2/3/2023.
Filed Date: 2/3/23.
Accession Number: 20230203–5170.
Comment Date: 5 p.m. ET 2/15/23.
Federal Energy Regulatory
Commission
Docket Numbers: RP23–427–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 2.3.23
Negotiated Rates—Castleton
Commodities Merchant Trading L.P. R–
4010–36 to be effective 2/3/2023.
Filed Date: 2/3/23.
Accession Number: 20230203–5171.
Comment Date: 5 p.m. ET 2/15/23.
Docket Numbers: RP23–428–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 2.3.23
Negotiated Rates—Uniper Global
Commodities North America LLC R–
7650–05 to be effective2/3/2023.
Filed Date: 2/3/23.
Accession Number: 20230203–5189.
Comment Date: 5 p.m. ET 2/15/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 6, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–02887 Filed 2–9–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
[Project No. 2639–028]
Northern States Power Company—
Wisconsin; Notice Soliciting Scoping
Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–2639–028.
c. Date filed: November 30, 2021.
d. Applicant: Northern States Power
Company—Wisconsin.
e. Name of Project: Cornell
Hydroelectric Project.
f. Location: The existing project is
located on the Lower Chippewa River in
the township of Cornell, Chippewa
County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Donald R.
Hartinger, Director, Hydro Plants, 1414
W Hamilton Avenue, P.O. Box 8; Eau
Claire, WI 54701; donald.r.hartinger@
xcelenergy.com; (612) 321–3063.
i. FERC Contact: Michael Davis at
(202) 502–8339; or michael.davis@
ferc.gov.
j. Deadline for filing scoping
comments: March 8, 2023.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2639–028.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
E:\FR\FM\10FEN1.SGM
10FEN1
Agencies
[Federal Register Volume 88, Number 28 (Friday, February 10, 2023)]
[Notices]
[Pages 8837-8838]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-02854]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Notice of Intent Regarding the Future Release of Guidance and
Application for the Hydroelectric Efficiency Improvement Incentives
AGENCY: Grid Deployment Office, Department of Energy.
ACTION: Notice of intent (NOI).
-----------------------------------------------------------------------
SUMMARY: The Department of Energy (DOE) Grid Deployment Office (GDO)
intends to release the final guidance and open the 2023 application
period for the Hydroelectric Efficiency Improvement Incentives as
authorized through the Energy Policy Act of 2005 (EPAct 2005) and
amended by the Infrastructure Investment and Jobs Act (IIJA) of 2021,
in the second quarter of calendar year 2023. This notice provides
preliminary information regarding the GDO's Hydroelectric Efficiency
Improvement Incentives Program, including application requirements and
processes that will be further described in the guidance accompanying
the upcoming solicitation. All the information contained in this notice
is subject to change.
ADDRESSES: The future application period announcement will be published
in the Federal Register and guidance will be made available via the GDO
website https://www.energy.gov/gdo/section-243-hydroelectric-efficiency-improvement-incentives-program.
FOR FURTHER INFORMATION CONTACT: Questions may be addressed to Ms.
Luciana Ciocci, U.S. Department of Energy, Grid Deployment Office, 1000
Independence Ave. SW, Washington, DC, 20585, (202) 480-5768 or by email
at [email protected].
SUPPLEMENTARY INFORMATION: In the coming weeks, the Grid Deployment
Office intends to open the 2023 application period for section 243 of
EPAct 2005, Hydroelectric Efficiency Improvement Incentives, as amended
by section 40332 IIJA of 2021, Public Law 117-58.\1\ At that time, GDO
will also make available an accompanying guidance document that will
describe the application process and the information necessary for the
Secretary of Energy to make incentive payments to owners and authorized
operators of qualified hydroelectric facilities at existing dams to be
used to make capital improvements in the facilities that are directly
related to improving the efficiency of such facilities by at least
three percent pursuant to section 243 of EPAct 2005.\2\ GDO previously
released a request for information (RFI) and held a public webinar
related to section 243 incentive. See 87 FR 40515 (Jul. 7, 2022). The
information gathered through the RFI and webinar were used to support
the development of the guidance.
---------------------------------------------------------------------------
\1\ Public Law 117-58, div. D, title III, Sec. 40332(a).
\2\ 42 U.S.C. 15882(a).
---------------------------------------------------------------------------
The guidance will describe the application process and the
information necessary for the Secretary of Energy to make incentive
payments to owners and authorized operators of qualified hydroelectric
facilities pursuant to section 243 of EPAct 2005, Hydroelectric
Efficiency Improvement Incentives. Topics include, eligibility
requirements, general application requirements and process, procedures
for processing applications, allocation of funding for eligible
projects in the event of oversubscription, and funding restrictions.
Under the statute, the incentive payments include the following
limitations: an incentive payment shall not exceed 30 percent of the
costs of the applicable capital improvement(s); and no more than one
incentive payment may be made to a single qualified hydroelectric
facility in any fiscal year that shall not exceed $5,000,000.\3\
---------------------------------------------------------------------------
\3\ 42 U.S.C. 15882(b).
---------------------------------------------------------------------------
GDO intends to open the 2023 application period by publishing a
notice in the Federal Register, in the coming weeks, and releasing the
guidance online, which will be located at https://www.energy.gov/gdo/section-243-hydroelectric-efficiency-improvement-incentives-program.
GDO anticipates utilizing the Clean Energy Infrastructure Funding
Opportunity eXCHANGE for submission of applications once the
application period is opened. The Clean Energy Infrastructure Funding
Opportunity eXCHANGE is located at https://infrastructure-exchange.energy.gov/.
A public webinar will be held in the weeks following the release of
the guidance and 2023 solicitation to provide clarity on the guidance
document, as necessary. The webinar will be held in a question and
answer format with registration details available at https://www.energy.gov/gdo/section-243-hydroelectric-efficiency-improvement-incentives-program in the near future.
Signing Authority
This document of the Department of Energy was signed on February 6,
2023, by Maria Duaime Robinson, Director of the Grid Deployment Office,
pursuant to delegated authority from the Secretary of Energy. That
document with the original signature and date is
[[Page 8838]]
maintained by DOE. For administrative purposes only, and in compliance
with requirements of the Office of the Federal Register, the
undersigned DOE Federal Register Liaison Officer has been authorized to
sign and submit the document in electronic format for publication, as
an official document of the Department of Energy. This administrative
process in no way alters the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on February 7, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-02854 Filed 2-9-23; 8:45 am]
BILLING CODE 6450-01-P