Northern States Power Company-Wisconsin; Notice Soliciting Scoping Comments, 8838-8839 [2023-02882]

Download as PDF 8838 Federal Register / Vol. 88, No. 28 / Friday, February 10, 2023 / Notices maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC on February 7, 2023. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2023–02854 Filed 2–9–23; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: lotter on DSK11XQN23PROD with NOTICES1 Filings Instituting Proceedings Docket Numbers: RP23–422–000. Applicants: Ruby Pipeline, L.L.C. Description: § 4(d) Rate Filing: RP 2023–02–03 Administrative Changes to be effective 3/6/2023. Filed Date: 2/3/23. Accession Number: 20230203–5147. Comment Date: 5 p.m. ET 2/15/23. Docket Numbers: RP23–423–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 2.3.23 Negotiated Rates—Freepoint Commodities LLC R–7250–45 to be effective 2/3/2023. Filed Date: 2/3/23. Accession Number: 20230203–5164. Comment Date: 5 p.m. ET 2/15/23. Docket Numbers: RP23–424–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 2.3.23 Negotiated Rates—Macquarie Energy LLC R–4090–26 to be effective 2/3/2023. Filed Date: 2/3/23. Accession Number: 20230203–5167. Comment Date: 5 p.m. ET 2/15/23. Docket Numbers: RP23–425–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 2.3.23 Negotiated Rates—Citadel Energy Marketing LLC R–7705–14 to be effective 2/3/2023. Filed Date: 2/3/23. Accession Number: 20230203–5169. VerDate Sep<11>2014 17:41 Feb 09, 2023 Jkt 259001 Comment Date: 5 p.m. ET 2/15/23. DEPARTMENT OF ENERGY Docket Numbers: RP23–426–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 2.3.23 Negotiated Rates—Castleton Commodities Merchant Trading L.P. R– 4010–35 to be effective 2/3/2023. Filed Date: 2/3/23. Accession Number: 20230203–5170. Comment Date: 5 p.m. ET 2/15/23. Federal Energy Regulatory Commission Docket Numbers: RP23–427–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 2.3.23 Negotiated Rates—Castleton Commodities Merchant Trading L.P. R– 4010–36 to be effective 2/3/2023. Filed Date: 2/3/23. Accession Number: 20230203–5171. Comment Date: 5 p.m. ET 2/15/23. Docket Numbers: RP23–428–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 2.3.23 Negotiated Rates—Uniper Global Commodities North America LLC R– 7650–05 to be effective2/3/2023. Filed Date: 2/3/23. Accession Number: 20230203–5189. Comment Date: 5 p.m. ET 2/15/23. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 6, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–02887 Filed 2–9–23; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 [Project No. 2639–028] Northern States Power Company— Wisconsin; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: P–2639–028. c. Date filed: November 30, 2021. d. Applicant: Northern States Power Company—Wisconsin. e. Name of Project: Cornell Hydroelectric Project. f. Location: The existing project is located on the Lower Chippewa River in the township of Cornell, Chippewa County, Wisconsin. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Donald R. Hartinger, Director, Hydro Plants, 1414 W Hamilton Avenue, P.O. Box 8; Eau Claire, WI 54701; donald.r.hartinger@ xcelenergy.com; (612) 321–3063. i. FERC Contact: Michael Davis at (202) 502–8339; or michael.davis@ ferc.gov. j. Deadline for filing scoping comments: March 8, 2023. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2639–028. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must E:\FR\FM\10FEN1.SGM 10FEN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 28 / Friday, February 10, 2023 / Notices also serve a copy of the document on that resource agency. k. This application is not ready for environmental analysis at this time. l. Project Description: The project consists of the following existing facilities: (1) a reservoir having 985 acres surface area, gross storage capacity of 8,000 acre-feet and a net storage capacity of 1,500 acre-feet at a maximum normal water surface elevation of 1,002.0 National Geodetic Vertical Datum 1929 (NGVD); (2) an 861-foot-long earth and concrete dam including: (a) a 42-foot-wide east concrete non-overflow section with a top elevation of 1,010.0 feet NGVD, (b) a 131-foot-long, 151.5-foot-wide, 82foot-high powerhouse-intake structure containing three horizontal shaft turbine-generators rated at 10 megawatts each and one vertical shaft turbinegenerator rated at 750 kilowatts, (c) an 85-foot-long gated spillway containing two 37-foot-wide by 23.3-foot-high Tainter gates with top of pier elevation of 1,008.0 feet NGVD, (d) a 10-foot-long non-overflow concrete dam section with a top elevation of 1,004.2 feet NGVD, (e) a 292-foot-long gated spillway containing 12 20-foot-long by 16-foothigh steel Tainter gates with a top of pier elevation of 1,004.2 feet NGVD, (f) a 210-foot-long by 28-foot-high overflow concrete section topped with 48-inchhigh flashboards with top of flashboard elevation of 1,002.2 feet NGVD, and (g) a 91-foot-long west earthen embankment with a top elevation of 1,010.0 feet NGVD; (3) four 160-foot-long, 7.2kilovolt (kV) transmission lines connecting the powerhouse to an adjacent project owned substation that is the point of interconnection to a 115kV distribution line belonging to the Northern States Power Company— Wisconsin; and (4) appurtenant facilities. The project average annual generation between 2016 and 2020 was 113,839 megawatt hours. m. In addition to publishing the full text of this notice in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well as other documents in the proceeding (e.g., scoping document) via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document (P–2639). For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TYY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ VerDate Sep<11>2014 17:41 Feb 09, 2023 Jkt 259001 esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Scoping Process: Commission staff will prepare either an environmental assessment (EA) or an environmental impact statement (EIS) that describes and evaluates the probable effects, if any, of the licensee’s proposed action and alternatives. The EA or EIS will consider environmental impacts and reasonable alternatives to the proposed action. The Commission’s scoping process will help determine the required level of analysis and satisfy the National Environmental Policy Act (NEPA) scoping requirements, irrespective of whether the Commission prepares an EA or an EIS. At this time, we do not anticipate holding on-site scoping meetings. Instead, we are soliciting written comments and suggestions on the preliminary list of issues and alternatives to be addressed in the NEPA document, as described in scoping document 1 (SD1), issued February 6, 2023. Copies of the SD1 outlining the subject areas to be addressed in the NEPA document were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866– 208–3676 or for TTY, (202) 502–8659. Dated: February 6, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–02882 Filed 2–9–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–54–000. Applicants: Evergy Kansas Central, Inc., Evergy, Inc., Persimmon Creek Wind Farm 1, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Evergy Kansas Central, Inc., et al. Filed Date: 2/6/23. Accession Number: 20230206–5088. Comment Date: 5 p.m. ET 2/27/23. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 8839 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–80–000. Applicants: Lockhart ESS, LLC. Description: Lockhart ESS, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 2/3/23. Accession Number: 20230203–5205. Comment Date: 5 p.m. ET 2/24/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1841–028; ER10–1849–030; ER10–1851–018; ER10–1852–076; ER10–1857–021; ER10–1890–025; ER10–1899–020; ER13–712–032; ER13–752–019; ER13– 1991–026; ER13–1992–026; ER15–2582– 014; ER15–2676–023; ER16–1672–021; ER17–804–004; ER17–2152–017; ER18– 882–017; ER18–1534–012; ER18–1863– 015; ER18–1978–011; ER19–987–015; ER19–1003–015; ER19–1393–015; ER19–1394–015; ER19–2269–008; ER19–2437–011; ER19–2461–011; ER20–122–009; ER20–1769–009; ER20– 1980–008; ER20–1986–007; ER20–1987– 010; ER20–2049–007; ER21–1320–005; ER21–1519–005; ER21–1682–005; ER21–1879–006; ER21–2118–008; ER21–2293–008; ER21–2296–007; ER22–381–006; ER22–2518–002; ER22– 2634–002; ER23–71–001; ER22–2516– 001. Applicants: Chaves County Solar II, LLC, Buena Vista Energy Center, LLC, Buffalo Ridge Wind, LLC, Clearwater Wind I, LLC, Dunns Bridge Solar Center, LLC, Ensign Wind Energy, LLC, Fish Springs Ranch Solar, LLC, Dodge Flat Solar, LLC, Farmington Solar, LLC, Elora Solar, LLC, Cool Springs Solar, LLC, Crystal Lake Wind Energy III, LLC, Cedar Springs Wind III, LLC, Cerro Gordo Wind, LLC, Day County Wind I, LLC, Cedar Springs Wind, LLC, Chicot Solar, LLC, Crowned Ridge Interconnection, LLC, Crowned Ridge Wind, LLC, Emmons-Logan Wind, LLC, Dougherty County Solar, LLC, Endeavor Wind II, LLC, Endeavor Wind I, LLC, Crystal Lake Wind Energy II, LLC, Crystal Lake Wind Energy I, LLC, Casa Mesa Wind, LLC, Coolidge Solar I, LLC, East Hampton Energy Storage Center, LLC, Elk City Renewables II, LLC, Cottonwood Wind Project, LLC, Coram California Development, L.P., Chaves County Solar, LLC, Cedar Bluff Wind, LLC, Carousel Wind Farm, LLC, Desert Sunlight 300, LLC, Desert Sunlight 250, LLC, Energy Storage Holdings, LLC, Cimarron Wind Energy, LLC, FPL Energy Illinois Wind, LLC, FPL Energy Green Power Wind, LLC, FPL Energy Cape, LLC, Florida Power & Light E:\FR\FM\10FEN1.SGM 10FEN1

Agencies

[Federal Register Volume 88, Number 28 (Friday, February 10, 2023)]
[Notices]
[Pages 8838-8839]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-02882]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2639-028]


Northern States Power Company--Wisconsin; Notice Soliciting 
Scoping Comments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: P-2639-028.
    c. Date filed: November 30, 2021.
    d. Applicant: Northern States Power Company--Wisconsin.
    e. Name of Project: Cornell Hydroelectric Project.
    f. Location: The existing project is located on the Lower Chippewa 
River in the township of Cornell, Chippewa County, Wisconsin.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Donald R. Hartinger, Director, Hydro Plants, 
1414 W Hamilton Avenue, P.O. Box 8; Eau Claire, WI 54701; 
[email protected]; (612) 321-3063.
    i. FERC Contact: Michael Davis at (202) 502-8339; or 
[email protected].
    j. Deadline for filing scoping comments: March 8, 2023.
    The Commission strongly encourages electronic filing. Please file 
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-2639-028.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must

[[Page 8839]]

also serve a copy of the document on that resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. Project Description: The project consists of the following 
existing facilities: (1) a reservoir having 985 acres surface area, 
gross storage capacity of 8,000 acre-feet and a net storage capacity of 
1,500 acre-feet at a maximum normal water surface elevation of 1,002.0 
National Geodetic Vertical Datum 1929 (NGVD); (2) an 861-foot-long 
earth and concrete dam including: (a) a 42-foot-wide east concrete non-
overflow section with a top elevation of 1,010.0 feet NGVD, (b) a 131-
foot-long, 151.5-foot-wide, 82-foot-high powerhouse-intake structure 
containing three horizontal shaft turbine-generators rated at 10 
megawatts each and one vertical shaft turbine-generator rated at 750 
kilowatts, (c) an 85-foot-long gated spillway containing two 37-foot-
wide by 23.3-foot-high Tainter gates with top of pier elevation of 
1,008.0 feet NGVD, (d) a 10-foot-long non-overflow concrete dam section 
with a top elevation of 1,004.2 feet NGVD, (e) a 292-foot-long gated 
spillway containing 12 20-foot-long by 16-foot-high steel Tainter gates 
with a top of pier elevation of 1,004.2 feet NGVD, (f) a 210-foot-long 
by 28-foot-high overflow concrete section topped with 48-inch-high 
flashboards with top of flashboard elevation of 1,002.2 feet NGVD, and 
(g) a 91-foot-long west earthen embankment with a top elevation of 
1,010.0 feet NGVD; (3) four 160-foot-long, 7.2-kilovolt (kV) 
transmission lines connecting the powerhouse to an adjacent project 
owned substation that is the point of interconnection to a 115-kV 
distribution line belonging to the Northern States Power Company--
Wisconsin; and (4) appurtenant facilities. The project average annual 
generation between 2016 and 2020 was 113,839 megawatt hours.
    m. In addition to publishing the full text of this notice in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this notice, as well 
as other documents in the proceeding (e.g., scoping document) via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number, excluding the last 
three digits, in the docket number field to access the document (P-
2639). For assistance, contact FERC at [email protected] or 
call toll-free, (866) 208-3676 or TYY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Scoping Process:
    Commission staff will prepare either an environmental assessment 
(EA) or an environmental impact statement (EIS) that describes and 
evaluates the probable effects, if any, of the licensee's proposed 
action and alternatives. The EA or EIS will consider environmental 
impacts and reasonable alternatives to the proposed action. The 
Commission's scoping process will help determine the required level of 
analysis and satisfy the National Environmental Policy Act (NEPA) 
scoping requirements, irrespective of whether the Commission prepares 
an EA or an EIS. At this time, we do not anticipate holding on-site 
scoping meetings. Instead, we are soliciting written comments and 
suggestions on the preliminary list of issues and alternatives to be 
addressed in the NEPA document, as described in scoping document 1 
(SD1), issued February 6, 2023.
    Copies of the SD1 outlining the subject areas to be addressed in 
the NEPA document were distributed to the parties on the Commission's 
mailing list and the applicant's distribution list. Copies of SD1 may 
be viewed on the web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, call 1-866-
208-3676 or for TTY, (202) 502-8659.

    Dated: February 6, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-02882 Filed 2-9-23; 8:45 am]
BILLING CODE 6717-01-P