Department of Energy December 23, 2015 – Federal Register Recent Federal Regulation Documents

Sam Rayburn Dam Project Power Rate
Document Number: 2015-32366
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Southwestern Power Administration
Pursuant to Delegation Order Nos. 00-037.00A, effective October 25, 2013, and 00-001.00F, effective November 17, 2014, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-69, which increases the power rate for the Sam Rayburn Dam Project (Rayburn) pursuant to the Rayburn Rate Schedule (SRD-15) to supersede the existing rate schedule.
Robert D. Willis Hydropower Project Power Rate
Document Number: 2015-32365
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Southwestern Power Administration
Pursuant to Delegation Order Nos. 00-037.00A, effective October 25, 2013, and 00-001.00F, effective November 17, 2014, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-70, which increases the power rate for the Robert D. Willis Hydropower Project (Willis) pursuant to the Willis Rate Schedule (RDW-15) which supersedes the existing rate schedule.
Invitation for Public Comment To Inform the Design of a Consent-Based Siting Process for Nuclear Waste Storage and Disposal Facilities
Document Number: 2015-32346
Type: Notice
Date: 2015-12-23
Agency: Department of Energy
The U.S Department of Energy (DOE) is implementing a consent- based siting process to establish an integrated waste management system to transport, store, and dispose of commercial spent nuclear fuel and high level defense radioactive waste. In a consent-based siting approach, DOE will work with communities, tribal governments and states across the country that express interest in hosting any of the facilities identified as part of an integrated waste management system. As part of this process, the Department wants public input on implementing this system. In order to solicit public feedback, DOE is submitting this Invitation for Public Comment (IPC). Through this IPC, we are requesting feedback from communities, states, Tribes, and other interested stakeholders on how to design a consent-based siting process. In addition, the Department intends to host a series of public meetings to engage communities and discuss the development of a consent-based approach to managing our nation's nuclear waste.
Town of Walnut, Mississippi; Notice of Application
Document Number: 2015-32275
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2015-32274
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Federal Energy Regulatory Commission
City of Banning, California; Notice of Filing
Document Number: 2015-32270
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Williams Field Services-Gulf Coast Company LP; Notice of Petition for Declaratory Order
Document Number: 2015-32269
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2015-32268
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Federal Energy Regulatory Commission
ETRACOM LLC; Michael Rosenberg; Notice of Designation of Commission Staff as Non-Decisional
Document Number: 2015-32129
Type: Notice
Date: 2015-12-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment
Document Number: 2015-31906
Type: Rule
Date: 2015-12-23
Agency: Department of Energy
In this final rule, the U.S. Department of Energy (DOE) reaffirms that the currently prescribed test procedure, with certain amendments adopted in this rulemaking, must be used when measuring the energy efficiency of certain categories of small, large, and very large air-cooled commercial package air conditioners and heating equipment. The final rule, in addition to satisfying the agency's obligation to periodically review its test procedures for covered equipment, also clarifies specific certification, compliance, and enforcement provisions related to this equipment. The final rule limits the incorporation by reference of the industry test procedure ANSI/AHRI Standard 340/360-2007, ``2007 Standard for Performance Rating of Commercial and Industrial Unitary Air-Conditioning and Heat Pump Equipment,'' to certain sections and addenda; clarifies indoor airflow tolerance and adjustment specifications when meeting other rating conditions; clarifies requirements for condenser head pressure controls; clarifies units of measurement for airflow; establishes a tolerance on part-load rating points and specifies the ambient temperatures used for the part-load rating points; and defines the term, ``integrated energy efficiency ratio.''
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.