Department of Energy February 12, 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 16 of 16
Decision and Order Granting a Waiver to Sub-Zero From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedures
The U.S. Department of Energy (DOE) gives notice of the decision and order in Case No. RF-040 that grants to Sub-Zero Group, Inc. a waiver from the DOE electric refrigerator and refrigerator- freezer test procedures for determining the energy consumption of residential refrigerator-freezers. Sub-Zero's request pertains to the specific hybrid refrigerated ``storage-wine storage'' basic models set forth in its petition. Sub-Zero seeks permission to use an alternate test procedure to test the wine chiller compartment of these devices at 55 [deg]F instead of the prescribed temperature of 39 [deg]F. That procedure would apply a K factor (correction factor) value of 0.85 when calculating the energy consumption of a tested model and replace the energy consumption calculation. Under today's decision and order, Sub- Zero shall be required to test and rate the hybrid refrigerated ``storage-wine storage'' basic models identified in its petition using an alternate test procedure that takes the nature of these products into account when measuring energy consumption.
Provo River Project Rate Order No. WAPA-165
Western Area Power Administration (Western) extends, on an interim basis, the existing Provo River Project Formula Rate through March 31, 2020. The existing Formula Rate under Rate Order No. WAPA-149 expires on March 31, 2015. The Formula Rate will be in effect until the Federal Energy Regulatory Commission (FERC) places it into effect on a final basis or until it is replaced by another rate.
Decision and Order Granting a Waiver to GE Appliances From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedures
The U.S. Department of Energy (DOE) gives notice of the decision and order in Case No. RF-042 that grants to GE Appliances (GE) a waiver from the DOE electric refrigerator and refrigerator-freezer test procedures for determining the energy consumption of the specific residential refrigerator-freezer basic models set forth in GE's petition for waiver. Under today's decision and order, GE shall be required to test and rate these refrigerator-freezer basic models, which use dual compressors, using an alternate test procedure that takes this technology into account when measuring energy consumption.
Extension of Public Comment Period, Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project
The U.S. Department of Energy (DOE) published a notice of availability and public hearing on December 17, 2014 and a correction on December 29, 2014 that provided for a comment period ending March 19, 2015. DOE is extending the public comment period for the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS-0486) to April 20, 2015.