Combined Notice of Filings #1, 7857-7859 [2015-02936]
Download as PDF
Federal Register / Vol. 80, No. 29 / Thursday, February 12, 2015 / Notices
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: February 5, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–02935 Filed 2–11–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–70–000]
Rmajette on DSK2VPTVN1PROD with NOTICES
Regency Field Services, LLC; Notice of
Application
Take notice that on January 23, 2015,
Regency Field Services, LLC (RFS), 2001
Bryan St., Suite 3700, Dallas, Texas
75201, filed in Docket No. CP15–70–000
an application pursuant to section 7(c)
of the Natural Gas Act (NGA) and Part
157 of the Commission’s regulations,
requesting: (i) A certificate of public
convenience and necessity authorizing
RFS to own, operate and maintain its
Beaver Residue Line, located in Beaver
County, Oklahoma, for the purpose of
transporting its own natural gas; (ii) a
blanket certificate, pursuant to Part 157,
Subpart F, of the Commission’s
regulations; (iii) waivers of certain
regulatory requirements; and (iv)
confirmation that the Commission’s
assertion of jurisdiction over the Beaver
Residue Line will not jeopardize the
non-jurisdictional status of RFS’s
otherwise non-jurisdictional gathering
and processing facilities and operations.
The Beaver Residue line is a 13 mile,
12-inch diameter natural gas residue
pipeline, that transports RFS’s own
natural gas to the pipeline system of
Southern Star Central Gas Pipeline, Inc.,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document.
Any questions regarding this
application should be directed to Ms.
Deena L. Jordan, Chief Compliance
Officer, Regency Field Services, LLC,
VerDate Sep<11>2014
13:54 Feb 11, 2015
Jkt 235001
2001 Bryan Street, Suite 3700, Dallas,
Texas 75201, by telephone at (214) 840–
5812 or by email at deena.jordan@
regencygas.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
7857
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and five copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: February 26, 2015.
Dated: February 5, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–02934 Filed 2–11–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–68–000.
Applicants: Samchully Power &
Utilities 1 LLC.
Description: Application for
Authorization for Disposition of
E:\FR\FM\12FEN1.SGM
12FEN1
Rmajette on DSK2VPTVN1PROD with NOTICES
7858
Federal Register / Vol. 80, No. 29 / Thursday, February 12, 2015 / Notices
Jurisdictional Facilities and Request for
Expedited Action of Samchully Power &
Utilities 1 LLC.
Filed Date: 2/5/15.
Accession Number: 20150205–5223.
Comments Due: 5 p.m. ET 2/26/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1605–000.
Applicants: NV Energy, Inc.
Description: eTariff filing per
35.19a(b): NVE Refund Report to be
effective N/A.
Filed Date: 2/6/15.
Accession Number: 20150206–5170.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–523–001.
Applicants: Duke Energy Progress,
Inc., Duke Energy Florida, Inc., Duke
Energy Carolinas, LLC.
Description: Tariff Amendment per
35.17(b): Answer to Deficiency Letter
ER15–523 to be effective 4/1/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5111.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–611–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment per
35.17(b): 2015–02–06_SA 1926
Amended METC-Consumers 5th Rev.
D–TIA to be effective 1/1/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5213.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–631–001.
Applicants: Crawfordsville Energy,
LLC.
Description: Tariff Amendment per
35.17(b): Amended Application for
Market Based Rate to be effective 4/6/
2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5048.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–992–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Service Agreement No.
4076; Queue No. Z1–098 to be effective
1/6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205–5130.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15–993–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Information Filing of List
of Immediate-need Reliability Projects
submitted on behalf of PJM
Interconnection, L.L.C.
Filed Date: 1/30/15.
Accession Number: 20150130–5457.
Comments Due: 5 p.m. ET 2/20/15.
VerDate Sep<11>2014
13:54 Feb 11, 2015
Jkt 235001
Docket Numbers: ER15–994–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing per 35:
Revisions to OATT 13.7 per Order 890—
Unreserved Use Penalties to be effective
2/5/2015.
Filed Date: 2/5/15.
Accession Number: 20150205–5178.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15–995–000.
Applicants: Verso Androscoggin LLC.
Description: Compliance filing per 35:
Amendment to Market-Based Rate Tariff
to be effective 4/6/201.
Filed Date: 2/5/15.
Accession Number: 20150205–5189.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15–996–000.
Applicants: Verso Androscoggin
Power LLC.
Description: Compliance filing per 35:
Amendment to Market-Based Rate Tariff
to be effective 4/6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205–5190.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15–997–000.
Applicants: Verso Maine Energy LLC.
Description: Compliance filing per 35:
Amendment to Market-Based Tariff to
be effective 4/6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205–5205.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15–998–000.
Applicants: Southwestern Public
Service Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015–2–6_SPS–GSEC–
NPEC-Chaparral-675–NOC-Filing to be
effective 1/14/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5049.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–999–000.
Applicants: Luke Paper Company.
Description: Compliance filing per 35:
Amendment to Market-Based Rate Tariff
to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5102.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1000–000.
Applicants: NewPage Energy Services,
LLC.
Description: Compliance filing per 35:
Amendment to Market-Based Rate Tariff
to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5114.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1001–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Concurrence to San Juan
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Project Participation Agreement to be
effective 7/1/2014.
Filed Date: 2/6/15.
Accession Number: 20150206–5125.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1002–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): LGIA for Willow Springs
Solar, LLC to be effective 2/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5127.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1003–000.
Applicants: Consolidated Water
Power Company.
Description: Compliance filing per 35:
Amendment to Market-Based Rate Tariff
to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5130.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1004–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): CIAC Agreement with
Garden Wind to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5136.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1005–000.
Applicants: Consolidated Water
Power Company.
Description: Compliance filing per 35:
Amendment to Market-Based Rate Tariff
to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5137.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1006–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): CIAC Agreement with
Story County Wind to be effective 4/6/
2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5138.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1007–000.
Applicants: Escanaba Paper Company.
Description: Compliance filing per 35:
Amendment to Market-Based Rate Tariff
to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5193.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1008–000.
Applicants: AEP Generation
Resources Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Wheeling Power Supply
Agreement Cancellation to be effective
1/31/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5194.
Comments Due: 5 p.m. ET 2/27/15.
E:\FR\FM\12FEN1.SGM
12FEN1
Rmajette on DSK2VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 29 / Thursday, February 12, 2015 / Notices
Docket Numbers: ER15–1009–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): MR1 Rev Forward
Reserve Obligation Charge in Forward
Reserve Market to be effective 6/1/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5195.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15–1010–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): NYISO 205 filing tariff
revision Regulation Movement
Multiplier provision to be effective 4/7/
2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5214.
Comments Due: 5 p.m. ET 2/27/15.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RD15–3–000.
Applicants: North American Electric
Reliability Corp.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Reliability Standards PRC–004–2.1(i)a,
PRC–004–4, PRC–005–2(i), PRC–005–
3(i), and VAR–002–4.
Filed Date: 2/6/15.
Accession Number: 20150206–5169.
Comments Due: 5 p.m. ET 3/9/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–02936 Filed 2–11–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
13:54 Feb 11, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP11–1711–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Compliance filing per
154.501: 2014 Cash Out Filing.
Filed Date: 1/30/15.
Accession Number: 20150130–5019.
Comments Due: 5 p.m. ET 2/11/15.
Docket Numbers: RP15–420–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) rate filing per
154.204: 02/02/15 Negotiated Rates—
ConEdison Energy Inc. (HUB) 2275–89
to be effective 2/1/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5111.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–421–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) rate filing per
154.204: 02/02/15 Negotiated Rates—
Mercuria Energy Gas Trading LLC
(HUB) 7540–89 to be effective 1/31/
2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5113.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–422–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) rate filing per
154.204: 02/02/15 Negotiated Rates—
Sequent Energy Management (HUB)
3075–89 to be effective 2/1/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5114.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–423–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) rate filing per
154.204: Amendment to Neg Rate Agmt
(Chevron 41610–5) to be effective 2/1/
2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5118.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–424–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) rate filing per
154.204: 02/02/15 Negotiated Rates—
Trafigura Trading LLC (HUB) 7445–89
to be effective 1/30/2015.
PO 00000
Frm 00033
Fmt 4703
Sfmt 9990
7859
Filed Date: 2/2/15.
Accession Number: 20150202–5120.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–425–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) rate filing per
154.204: Neg Rate 2015–02–02 Mieco to
be effective 2/1/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5232.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–426–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) rate filing per
154.204: 20150202 Negotiated Rate to be
effective 2/3/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5257.
Comments Due: 5 p.m. ET 2/17/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP15–271–001.
Applicants: Columbia Gas
Transmission, LLC.
Description: Compliance filing per
154.203: Negotiated & Non-Conforming
Service Agmt—PacSum Compliance
Filing to be effective 1/1/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5254.
Comments Due: 5 p.m. ET 2/17/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–02953 Filed 2–11–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 80, Number 29 (Thursday, February 12, 2015)]
[Notices]
[Pages 7857-7859]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-02936]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC15-68-000.
Applicants: Samchully Power & Utilities 1 LLC.
Description: Application for Authorization for Disposition of
[[Page 7858]]
Jurisdictional Facilities and Request for Expedited Action of Samchully
Power & Utilities 1 LLC.
Filed Date: 2/5/15.
Accession Number: 20150205-5223.
Comments Due: 5 p.m. ET 2/26/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-1605-000.
Applicants: NV Energy, Inc.
Description: eTariff filing per 35.19a(b): NVE Refund Report to be
effective N/A.
Filed Date: 2/6/15.
Accession Number: 20150206-5170.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-523-001.
Applicants: Duke Energy Progress, Inc., Duke Energy Florida, Inc.,
Duke Energy Carolinas, LLC.
Description: Tariff Amendment per 35.17(b): Answer to Deficiency
Letter ER15-523 to be effective 4/1/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5111.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-611-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment per 35.17(b): 2015-02-06_SA 1926
Amended METC-Consumers 5th Rev. D-TIA to be effective 1/1/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5213.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-631-001.
Applicants: Crawfordsville Energy, LLC.
Description: Tariff Amendment per 35.17(b): Amended Application for
Market Based Rate to be effective 4/6/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5048.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-992-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): Service
Agreement No. 4076; Queue No. Z1-098 to be effective 1/6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205-5130.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15-993-000.
Applicants: PJM Interconnection, L.L.C.
Description: Information Filing of List of Immediate-need
Reliability Projects submitted on behalf of PJM Interconnection, L.L.C.
Filed Date: 1/30/15.
Accession Number: 20150130-5457.
Comments Due: 5 p.m. ET 2/20/15.
Docket Numbers: ER15-994-000.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing per 35: Revisions to OATT 13.7 per
Order 890--Unreserved Use Penalties to be effective 2/5/2015.
Filed Date: 2/5/15.
Accession Number: 20150205-5178.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15-995-000.
Applicants: Verso Androscoggin LLC.
Description: Compliance filing per 35: Amendment to Market-Based
Rate Tariff to be effective 4/6/201.
Filed Date: 2/5/15.
Accession Number: 20150205-5189.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15-996-000.
Applicants: Verso Androscoggin Power LLC.
Description: Compliance filing per 35: Amendment to Market-Based
Rate Tariff to be effective 4/6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205-5190.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15-997-000.
Applicants: Verso Maine Energy LLC.
Description: Compliance filing per 35: Amendment to Market-Based
Tariff to be effective 4/6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205-5205.
Comments Due: 5 p.m. ET 2/26/15.
Docket Numbers: ER15-998-000.
Applicants: Southwestern Public Service Company.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): 2015-2-
6_SPS-GSEC-NPEC-Chaparral-675-NOC-Filing to be effective 1/14/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5049.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-999-000.
Applicants: Luke Paper Company.
Description: Compliance filing per 35: Amendment to Market-Based
Rate Tariff to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5102.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1000-000.
Applicants: NewPage Energy Services, LLC.
Description: Compliance filing per 35: Amendment to Market-Based
Rate Tariff to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5114.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1001-000.
Applicants: Tucson Electric Power Company.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii):
Concurrence to San Juan Project Participation Agreement to be effective
7/1/2014.
Filed Date: 2/6/15.
Accession Number: 20150206-5125.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1002-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): LGIA
for Willow Springs Solar, LLC to be effective 2/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5127.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1003-000.
Applicants: Consolidated Water Power Company.
Description: Compliance filing per 35: Amendment to Market-Based
Rate Tariff to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5130.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1004-000.
Applicants: ITC Midwest LLC.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): CIAC
Agreement with Garden Wind to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5136.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1005-000.
Applicants: Consolidated Water Power Company.
Description: Compliance filing per 35: Amendment to Market-Based
Rate Tariff to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5137.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1006-000.
Applicants: ITC Midwest LLC.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): CIAC
Agreement with Story County Wind to be effective 4/6/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5138.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1007-000.
Applicants: Escanaba Paper Company.
Description: Compliance filing per 35: Amendment to Market-Based
Rate Tariff to be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5193.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1008-000.
Applicants: AEP Generation Resources Inc.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii):
Wheeling Power Supply Agreement Cancellation to be effective 1/31/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5194.
Comments Due: 5 p.m. ET 2/27/15.
[[Page 7859]]
Docket Numbers: ER15-1009-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): MR1 Rev
Forward Reserve Obligation Charge in Forward Reserve Market to be
effective 6/1/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5195.
Comments Due: 5 p.m. ET 2/27/15.
Docket Numbers: ER15-1010-000.
Applicants: New York Independent System Operator, Inc.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): NYISO
205 filing tariff revision Regulation Movement Multiplier provision to
be effective 4/7/2015.
Filed Date: 2/6/15.
Accession Number: 20150206-5214.
Comments Due: 5 p.m. ET 2/27/15.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RD15-3-000.
Applicants: North American Electric Reliability Corp.
Description: Petition of the North American Electric Reliability
Corporation for Approval of Proposed Reliability Standards PRC-004-
2.1(i)a, PRC-004-4, PRC-005-2(i), PRC-005-3(i), and VAR-002-4.
Filed Date: 2/6/15.
Accession Number: 20150206-5169.
Comments Due: 5 p.m. ET 3/9/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-02936 Filed 2-11-15; 8:45 am]