Download as PDF 7862 Federal Register / Vol. 80, No. 29 / Thursday, February 12, 2015 / Notices commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: February 5, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–02929 Filed 2–11–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518–016] Rmajette on DSK2VPTVN1PROD with NOTICES Erie Boulevard Hydropower, L.P.; Saint Regis Mohawk Tribe; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests On November 27, 2013, Erie Boulevard Hydropower, L.P. (Erie or transferor) and the Saint Regis Mohawk Tribe (Tribe or transferee) filed an application to transfer the license for the Hogansburg Hydroelectric Project No. 7518, located on the St. Regis River in Franklin County, New York. That same day, the Tribe (as a prospective licensee) filed an application to surrender the project license and to decommission and remove the project dam. On January 21, 2015, Erie and the Tribe filed a letter requesting that the Commission construe their November 27, 2013 filings as a request to partially transfer the license for the Hogansburg Project to add the Tribe as a co-licensee. Erie and the Tribe now contemplate a two-step process where the Tribe would first become a co-licensee, and would subsequently surrender the license and decommission the project facilities, with Erie remaining a co-licensee. This notice applies only to the partial transfer request. If the partial transfer is approved, the Commission will solicit comments and review the surrender and decommissioning request in a separate proceeding. Applicant Contacts: For Transferor: Mr. John A. Whittaker, IV, Winston & Strawn LLP, 1700 K Street NW., Washington, DC 20006, Phone: 202– 282–5766, Email: jwhittker@ winston.com. For Transferee: Mr. John J. Privitera, McNamee, Lochner, Titus & VerDate Sep<11>2014 13:54 Feb 11, 2015 Jkt 235001 Williams, P.C., 677 Broadway, Albany, NY 12207, Phone: 518–447–3200, Email: privitera@mltw.com. FERC Contact: Patricia W. Gillis, (202) 502–8735. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, comments, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–7518–016. Dated: February 6, 2015. Kimberly D. Bose, Secretary. LLC, 717 Atlantic Avenue, Suite 1A, Boston, MA 02111. FERC Contact: Patricia W. Gillis, (202) 502–8735. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, comments, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–9821–105. Dated: February 5, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–02930 Filed 2–11–15; 8:45 am] [FR Doc. 2015–02933 Filed 2–11–15; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 9821–105] [Docket No. PF15–1–000] Trafalgar Power, Inc., Ampersand Ogdensburg Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests PennEast Pipeline Company, LLC; Notice of Revised Public Scoping Meetings for the Penneast Pipeline Project On January 27, 2015, Trafalgar Power, Inc. (transferor) and Ampersand Ogdensburg Hydro, LLC (transferee) filed an application for transfer of license of the Ogdensburg Hydroelectric Project, FERC No. 9821. The project is located on the Oswegatchie River in St. Lawrence County, New York. The applicants seek Commission approval to transfer the license for the Ogdensburg Project from the transferor to the transferee. Applicant Contact: For Transferor: Mr. Arthur Steckler, President, Trafalgar Power, Inc., 11010 Lake Grove Blvd., Suite 100, Box 353, Morrisville, NC 27560–7392. For Transferee: Mr. Lutz Loegters, Ampersand Ogdensburg Hydro, LLC, c/o Ampersand Hydro, PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 On January 13, 2015, the Federal Energy Regulatory Commission (FERC or Commission) issued a Notice of Intent to Prepare an Environmental Impact Statement for the Planned PennEast Pipeline Project, Requests for Comments on Environmental Issues, and Notice of Public Scoping Meetings (NOI). On January 23 and 26, 2015, we issued notices to postpone the January 27 and 28, 2015 public scoping meetings listed in the NOI. The revised dates for the scoping meetings are: When: Wednesday, February 25, 2015. Time: 6 p.m. Where: West Trenton Ballroom, 40 W. Upper Ferry Road, West Trenton, New Jersey 08628. When: Thursday, February 26, 2015. Time: 6 p.m. E:\FR\FM\12FEN1.SGM 12FEN1

Agencies

[Federal Register Volume 80, Number 29 (Thursday, February 12, 2015)]
[Notices]
[Page 7862]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-02930]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 9821-105]


Trafalgar Power, Inc., Ampersand Ogdensburg Hydro, LLC; Notice of 
Application for Transfer of License and Soliciting Comments, Motions To 
Intervene, and Protests

    On January 27, 2015, Trafalgar Power, Inc. (transferor) and 
Ampersand Ogdensburg Hydro, LLC (transferee) filed an application for 
transfer of license of the Ogdensburg Hydroelectric Project, FERC No. 
9821. The project is located on the Oswegatchie River in St. Lawrence 
County, New York.
    The applicants seek Commission approval to transfer the license for 
the Ogdensburg Project from the transferor to the transferee.
    Applicant Contact: For Transferor: Mr. Arthur Steckler, President, 
Trafalgar Power, Inc., 11010 Lake Grove Blvd., Suite 100, Box 353, 
Morrisville, NC 27560-7392. For Transferee: Mr. Lutz Loegters, 
Ampersand Ogdensburg Hydro, LLC, c/o Ampersand Hydro, LLC, 717 Atlantic 
Avenue, Suite 1A, Boston, MA 02111.
    FERC Contact: Patricia W. Gillis, (202) 502-8735.
    Deadline for filing comments, motions to intervene, and protests: 
30 days from the date that the Commission issues this notice. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, comments, and protests using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-9821-105.

    Dated: February 5, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-02930 Filed 2-11-15; 8:45 am]
BILLING CODE 6717-01-P