Department of Energy October 2013 – Federal Register Recent Federal Regulation Documents
Results 151 - 168 of 168
Environmental Management Site-Specific Advisory Board, Portsmouth
On September 16, 2013, in FR Doc. 2013-22453, on page 56871, the Department of Energy (DOE) published a notice of open meeting announcing a meeting on October 2, 2013 of the Environmental Management Site-Specific Advisory Board, Portsmouth (78 FR 56871). This notice announces the cancellation of this meeting.
Electricity Advisory Committee
On September 11, 2013, in FR Doc. 2013-22119, on pages 55692- 55693, the Department of Energy (DOE) published a notice of open meeting announcing a meeting on October 2-3, 2013 of the Electricity Advisory Committee (78 FR 55692). This notice announces the cancellation of this meeting.
National Coal Council Meeting
This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of meetings be announced in the Federal Register.
Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)
This notice announces an open meeting of the Hydrogen and Fuel Cell Technical Advisory Committee (HTAC). The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires notice of the meeting be announced in the Federal Register.
Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado
Western Area Power Administration (Western), a power marketing administration in the U.S. Department of Energy (DOE), owns and operates the 69-kilovolt (kV) Granby Pumping Plant Switchyard-Windy Gap Substation (Project) transmission line in Grand County, Colorado. The transmission line is 13.6 miles long. Western proposes to rebuild the single-circuit line as a double-circuit line, increase the voltage rating to 138-kV, and operate one circuit at 69-kV and the second at 138-kV. One circuit would replace Western's existing transmission line between the Windy Gap Substation and Stillwater Tap and provide a redundant feed from the tap to the Granby Pumping Plant to prepare for when the existing 69-kV cable located in the Alva B. Adams Tunnel is no longer operable. The second circuit was requested by Tri-State Generation and Transmission Association, Inc. (Tri-State) to improve reliability for their local customer, Mountain Parks Electric, Inc., and to minimize environmental effects by sharing a right-of-way (ROW). The Notice of Availability (NOA) of the Final Environmental Impact Statement (EIS) was published in the Federal Register on July 5, 2013 (78 FR 40474). After considering the environmental impacts, Western has decided to construct, operate, and maintain the transmission line on the preferred alignment identified as Alternative D (Option 1), in the EIS.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.