Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene, 60271 [2013-23881]
Download as PDF
Federal Register / Vol. 78, No. 190 / Tuesday, October 1, 2013 / Notices
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2013–23881 Filed 9–30–13; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 6972–032]
emcdonald on DSK67QTVN1PROD with NOTICES
Hollow Dam Power Company;
Ampersand Hollow Dam Hydro, LLC;
Notice of Application for Transfer of
License, and Soliciting Comments and
Motions To Intervene
DEPARTMENT OF ENERGY
On September 10, 2013, Hollow Dam
Power Company (transferor) and
Ampersand Hollow Dam Hydro, LLC
(transferee) filed an application for
transfer of license for the Hollow Dam
Project, FERC No. 6972, located on the
West Branch of the Oswegatchie River
in St. Lawrence County, New York.
Applicants seek Commission approval
to transfer the license for the Hollow
Dam Project from transferor to
transferee.
Applicants’ Contact: Transferor: Mr.
Peter Howe, Hollow Dam Power
Company, c/o SilverStreet Hydro, 15
East Silver Street, Westfield, MA 01085,
(413) 562–1266. Transferee: Mr. Lutz
Loegters, Ampersand Hollow Dam
Hydro, LLC, c/o Ampersand Hydro,
LLC, 717 Atlantic Avenue, Suite 1A,
Boston, MA 02111, (617) 933–7200.
FERC Contact: Patricia W. Gillis (202)
502–8735.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, mail to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. More
information about this project can be
viewed or printed on the eLibrary link
of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–6972) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Mid-Atlantic Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
VerDate Mar<15>2010
14:45 Sep 30, 2013
Jkt 232001
Federal Energy Regulatory
Commission
[Project No. 14549–000]
On August 16, 2013, Mid-Atlantic
Hydro, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Francis E. Walter Hydroelectric Project
(Francis Walter Project or project) to be
located at the U.S. Army Corps of
Engineers’ (Corps) Francis E. Walter
Dam on the Lehigh River in Luzerne
County, Pennsylvania. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An 11-foot-diameter
steel penstock attached to the existing
outlet; (2) a concrete powerhouse to be
located on the right descending bank;
(3) 6-megawatt (MW) and 3–MW
generators for a total installed capacity
of 9.0 MW; (4) a concrete tailrace to
direct flow from the powerhouse back
into the Lehigh River; (5) a proposed
0.5-mile-long, 12.4-kilovolt transmission
line interconnecting with an existing
Pennsylvania Power and Light
transmission line; and (6) appurtenant
facilities. The estimated annual
generation of the project would be 26
gigawatt-hours.
Applicant Contact: Jennifer Mesirow,
Mid-Atlantic Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, MD 20815; phone: (301) 718–
4826.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
60271
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14549–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14549) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–23876 Filed 9–30–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Project No. 13599–001]
Green Power Development, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On September 3, 2013, Green Power
Development, LLC (Green Power) filed
an application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Lake 3160
Hydroelectric Project (project) to be
located on Lake 3160 near Juneau in
Juneau Borough, Alaska. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
E:\FR\FM\01OCN1.SGM
01OCN1
Agencies
[Federal Register Volume 78, Number 190 (Tuesday, October 1, 2013)]
[Notices]
[Page 60271]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-23881]
[[Page 60271]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6972-032]
Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC;
Notice of Application for Transfer of License, and Soliciting Comments
and Motions To Intervene
On September 10, 2013, Hollow Dam Power Company (transferor) and
Ampersand Hollow Dam Hydro, LLC (transferee) filed an application for
transfer of license for the Hollow Dam Project, FERC No. 6972, located
on the West Branch of the Oswegatchie River in St. Lawrence County, New
York.
Applicants seek Commission approval to transfer the license for the
Hollow Dam Project from transferor to transferee.
Applicants' Contact: Transferor: Mr. Peter Howe, Hollow Dam Power
Company, c/o SilverStreet Hydro, 15 East Silver Street, Westfield, MA
01085, (413) 562-1266. Transferee: Mr. Lutz Loegters, Ampersand Hollow
Dam Hydro, LLC, c/o Ampersand Hydro, LLC, 717 Atlantic Avenue, Suite
1A, Boston, MA 02111, (617) 933-7200.
FERC Contact: Patricia W. Gillis (202) 502-8735.
Deadline for filing comments and motions to intervene: 30 days from
the issuance date of this notice by the Commission. Comments and
motions to intervene may be filed electronically via the Internet. See
18 CFR 385.2001(a)(1) and the instructions on the Commission's Web site
under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. If unable to be filed electronically,
documents may be paper-filed. To paper-file, mail to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. More information about this project can be viewed
or printed on the eLibrary link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-6972)
in the docket number field to access the document. For assistance, call
toll-free 1-866-208-3372.
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-23881 Filed 9-30-13; 8:45 am]
BILLING CODE 6717-01-P