Project No. 13599-001], 60271-60272 [2013-23882]
Download as PDF
Federal Register / Vol. 78, No. 190 / Tuesday, October 1, 2013 / Notices
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2013–23881 Filed 9–30–13; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 6972–032]
emcdonald on DSK67QTVN1PROD with NOTICES
Hollow Dam Power Company;
Ampersand Hollow Dam Hydro, LLC;
Notice of Application for Transfer of
License, and Soliciting Comments and
Motions To Intervene
DEPARTMENT OF ENERGY
On September 10, 2013, Hollow Dam
Power Company (transferor) and
Ampersand Hollow Dam Hydro, LLC
(transferee) filed an application for
transfer of license for the Hollow Dam
Project, FERC No. 6972, located on the
West Branch of the Oswegatchie River
in St. Lawrence County, New York.
Applicants seek Commission approval
to transfer the license for the Hollow
Dam Project from transferor to
transferee.
Applicants’ Contact: Transferor: Mr.
Peter Howe, Hollow Dam Power
Company, c/o SilverStreet Hydro, 15
East Silver Street, Westfield, MA 01085,
(413) 562–1266. Transferee: Mr. Lutz
Loegters, Ampersand Hollow Dam
Hydro, LLC, c/o Ampersand Hydro,
LLC, 717 Atlantic Avenue, Suite 1A,
Boston, MA 02111, (617) 933–7200.
FERC Contact: Patricia W. Gillis (202)
502–8735.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, mail to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. More
information about this project can be
viewed or printed on the eLibrary link
of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–6972) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Mid-Atlantic Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
VerDate Mar<15>2010
14:45 Sep 30, 2013
Jkt 232001
Federal Energy Regulatory
Commission
[Project No. 14549–000]
On August 16, 2013, Mid-Atlantic
Hydro, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Francis E. Walter Hydroelectric Project
(Francis Walter Project or project) to be
located at the U.S. Army Corps of
Engineers’ (Corps) Francis E. Walter
Dam on the Lehigh River in Luzerne
County, Pennsylvania. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An 11-foot-diameter
steel penstock attached to the existing
outlet; (2) a concrete powerhouse to be
located on the right descending bank;
(3) 6-megawatt (MW) and 3–MW
generators for a total installed capacity
of 9.0 MW; (4) a concrete tailrace to
direct flow from the powerhouse back
into the Lehigh River; (5) a proposed
0.5-mile-long, 12.4-kilovolt transmission
line interconnecting with an existing
Pennsylvania Power and Light
transmission line; and (6) appurtenant
facilities. The estimated annual
generation of the project would be 26
gigawatt-hours.
Applicant Contact: Jennifer Mesirow,
Mid-Atlantic Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, MD 20815; phone: (301) 718–
4826.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
60271
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14549–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14549) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–23876 Filed 9–30–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Project No. 13599–001]
Green Power Development, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On September 3, 2013, Green Power
Development, LLC (Green Power) filed
an application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Lake 3160
Hydroelectric Project (project) to be
located on Lake 3160 near Juneau in
Juneau Borough, Alaska. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
E:\FR\FM\01OCN1.SGM
01OCN1
emcdonald on DSK67QTVN1PROD with NOTICES
60272
Federal Register / Vol. 78, No. 190 / Tuesday, October 1, 2013 / Notices
or waters owned by others without the
owners’ express permission. The project
would occupy about 475 acres of lands
within the Tongass National Forest
managed by the U.S. Forest Service.
The proposed project would use the
existing natural lake named Lake 3160
with a surface area of 451 acres, storage
capacity of 19,710 acre-feet, and normal
water surface elevation of 3,160 feet
above mean sea level; and consist of the
following new facilities: (1) A siphon
intake, directional bore, or 20-foot-high
concrete dam with either intakes at the
exit of Lake 3160; (2) an above-ground
8,800-feet-long, 20- to 24-inch-diameter
penstock; (3) a powerhouse containing
one or two generating units with a total
installed capacity of 4.995 megawatts;
(4) an open-channel tailrace discharging
flows to Evelyn Lake; (5) a 7.6-milelong, 14.4/24.9-kilovolt overhead,
underground, or submarine cable
transmission line; and (6) appurtenant
facilities. The average annual energy
production would be 40 gigawatt-hours.
Applicant Contact: Mr. Joel D. Groves,
PE, Green Power Development, LLC,
1503 W. 33rd Avenue, #310, Anchorage,
Alaska 99503; phone: (907) 258–2420,
extension 204.
FERC Contact: Dianne Rodman;
phone: (202) 502–6077.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13599–001.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
VerDate Mar<15>2010
14:45 Sep 30, 2013
Jkt 232001
(P–13599) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–23882 Filed 9–30–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14541–000]
Western Minnesota Municipal Power
Authority; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On July 30, 2013, Western Minnesota
Municipal Power Authority filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Gregory County
Pumped Storage Project to be located on
Lake Francis Case on the Missouri
River, near the township of Lucas, in
Gregory, Charles Mix and Brule
Counties, South Dakota. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new earthen
embankment (upper reservoir) having a
total storage capacity of 47,000 acre-feet
with an operating elevation level of
between 2,045 feet msl and 2,080 feet
msl; (2) a new 340-foot-long by 200-footwide by 100-foot-high concrete
powerhouse containing eight new 100megawatt (MW) turbine units for a total
plant rating of 800 MW; (3) eight new
20-foot by 36-foot trashracks with 3.75inch-wide open bar spacing; (4) two
new 10,000-foot-long, 32-foot-diameter
reinforced concrete penstocks with a
steel lining; (5) two new 120-foot-high,
40-foot-diameter surge tanks connected
to each penstock; (6) a new 320-footlong by 120-foot-wide by 60-foot-high
release-intake structure containing
emergency closing gates for penstock
maintenance; (7) the existing Lake
Francis Case (lower reservoir) with a
storage capacity of 5,494,000 acre-feet at
normal maximum operation elevation of
1,355 feet msl; (8) a new 120-foot-long,
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
340-foot-wide tailrace from the
powerhouse to Lake Francis Case; (9) a
new substation on top of the
powerhouse containing step-up
transformers; (10) a new 21-mile-long,
230-kilovolt (kV) transmission line
extending from the project substation to
the existing Lake Platte substation (the
point of interconnection); and (11)
appurtenant facilities. The estimated
annual generation of the Gregory County
Pumped Storage Project would be 3,000
gigawatt-hours.
Applicant Contact: Mr. Raymond J.
Wahle, Missouri River Energy Services,
3724 W. Avera Drive, P.O. Box 88920,
Sioux Falls, SD 57109; phone: (605)
330–6963.
FERC Contact: Tyrone Williams;
phone: (202) 502–6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14541–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14541) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–23875 Filed 9–30–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\01OCN1.SGM
01OCN1
Agencies
[Federal Register Volume 78, Number 190 (Tuesday, October 1, 2013)]
[Notices]
[Pages 60271-60272]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-23882]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Project No. 13599-001]
Green Power Development, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On September 3, 2013, Green Power Development, LLC (Green Power)
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the feasibility of
the Lake 3160 Hydroelectric Project (project) to be located on Lake
3160 near Juneau in Juneau Borough, Alaska. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands
[[Page 60272]]
or waters owned by others without the owners' express permission. The
project would occupy about 475 acres of lands within the Tongass
National Forest managed by the U.S. Forest Service.
The proposed project would use the existing natural lake named Lake
3160 with a surface area of 451 acres, storage capacity of 19,710 acre-
feet, and normal water surface elevation of 3,160 feet above mean sea
level; and consist of the following new facilities: (1) A siphon
intake, directional bore, or 20-foot-high concrete dam with either
intakes at the exit of Lake 3160; (2) an above-ground 8,800-feet-long,
20- to 24-inch-diameter penstock; (3) a powerhouse containing one or
two generating units with a total installed capacity of 4.995
megawatts; (4) an open-channel tailrace discharging flows to Evelyn
Lake; (5) a 7.6-mile-long, 14.4/24.9-kilovolt overhead, underground, or
submarine cable transmission line; and (6) appurtenant facilities. The
average annual energy production would be 40 gigawatt-hours.
Applicant Contact: Mr. Joel D. Groves, PE, Green Power Development,
LLC, 1503 W. 33rd Avenue, 310, Anchorage, Alaska 99503; phone:
(907) 258-2420, extension 204.
FERC Contact: Dianne Rodman; phone: (202) 502-6077.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13599-001.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13599) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-23882 Filed 9-30-13; 8:45 am]
BILLING CODE 6717-01-P