Department of Energy 2009 – Federal Register Recent Federal Regulation Documents
Results 51 - 100 of 2,356
Notice of Modifications to the Preferred Alternatives for Tank Waste Treatment and Disposal of Off Site Waste in the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, WA
The U.S. Department of Energy (DOE) is modifying its preferred alternatives for tank waste treatment and also for disposal of off-site waste in the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft EIS, DOE/EIS-00391), made available for public comment on October 30, 2009 (74 FR 56194). This Draft EIS has been prepared in accordance with the National Environmental Policy Act (NEPA) and its implementing regulations. The public comment period for the Draft EIS extends to March 19, 2010.
Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Office of Science; Notice of Renewal of the Biological and Environmental Research Advisory Committee
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-147
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-147 and Rate Schedules P-SED-F11 and P-SED-FP11, placing firm power and firm peaking power rates from the Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay power investments and irrigation aid within the allowable periods.
Loveland Area Projects-Rate Order No. WAPA-146
The Deputy Secretary of Energy has confirmed and approved Rate Order No. WAPA-146 and Rate Schedule L-F9, placing firm electric service rates from the Loveland Area Projects (LAP) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay investments and irrigation aid within the allowable periods.
Energy Conservation Program for Commercial Equipment: Decision and Order Granting a Waiver to LG Electronics, Inc. (LG) From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
This notice publishes the U.S. Department of Energy's (DOE) Decision and Order in Case No. CAC-021, which grants a waiver to LG from the existing DOE test procedure applicable to commercial package central air conditioners and heat pumps. The waiver is specific to the LG variable speed and variable refrigerant volume Multi V (commercial) multi-split heat pumps and heat recovery systems. As a condition of this waiver, LG must test and rate its Multi V multi-split products according to the alternate test procedure set forth in this notice.
Energy Conservation Program for Certain Industrial Equipment: Publication of the Petition for Waiver From Daikin AC (Americas), Inc. and Granting of the Interim Waiver From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedure
This notice announces receipt of and publishes a petition for waiver from Daikin AC (Americas), Inc. (Daikin). The petition for waiver (hereafter ``petition'') requests a waiver from the U.S. Department of Energy (DOE) test procedure applicable to commercial package air-cooled central air conditioners and heat pumps. The petition is specific to the Daikin variable capacity VRV-III-C (commercial) multi-split heat pumps. Through this document, DOE: (1) Solicits comments, data, and information with respect to the Daikin Petition; and (2) announces the grant of an interim waiver to Daikin from the applicable DOE test procedure for the subject commercial air- cooled, multi-split air conditioners and heat pumps.
Environmental Management Site-Specific Advisory Board, Portsmouth
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Energy Conservation Program for Consumer Products: Notice of Petition for Waiver of Electrolux Home Products, Inc. From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedure, and Modification of Interim Waiver
This notice announces receipt of and publishes the Electrolux Home Products, Inc. (Electrolux) Petition for Waiver (hereafter, ``Petition'') from parts of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of electric refrigerators and refrigerator-freezers. Today's notice also modifies an interim waiver of the test procedures applicable to residential refrigerator-freezers by extending it to additional Electrolux basic models. Through this document, DOE is soliciting comments with respect to the Electrolux Petition.
Energy Conservation Program for Certain Industrial Equipment: Decision and Order Granting a Waiver to Mitsubishi Electric and Electronics USA, Inc. From the Department of Energy Commercial Package Water-Source Heat Pump Test Procedure
This notice publishes the U.S. Department of Energy's (DOE) Decision and Order in Case No. CAC-015, which grants a waiver to Mitsubishi Electric and Electronics USA, Inc. (Mitsubishi) from the existing DOE test procedure for commercial package water-source heat pumps. DOE is granting this waiver because these water-source multi- split heat pumps, like the air-source multi-split heat pumps that have been granted similar waivers, are too complex to test using the DOE test procedure. As a condition of this waiver, Mitsubishi must test and rate the energy consumption of the water-source WR2 and WY series models (from its CITY MULTI Variable Refrigerant Flow Zoning line of commercial package heat pump equipment) according to the alternate test procedure set forth in this notice.
Energy Conservation Program for Certain Industrial Equipment: Publication of the Petition for Waiver From Daikin AC (Americas), Inc. and Granting of the Application for Interim Waiver From the Department of Energy Residential Central Air Conditioner and Heat Pump Test Procedure
This notice announces receipt of and publishes a petition for waiver from Daikin AC (Americas), Inc. (Daikin). The petition for waiver (hereafter ``Daikin Petition'') requests a waiver from the U.S. Department of Energy (DOE) test procedure applicable to residential central air conditioners and heat pumps. The waiver request is specific to the Daikin Altherma air-to-water heat pump with integrated domestic water heating. Through this document, DOE is: (1) Soliciting comments, data, and information with respect to the Daikin Petition; and (2) granting an interim waiver to Daikin from the applicable DOE test procedure for the subject residential central air conditioning heat pump.
Energy Conservation Program for Consumer Products: Publication of the Petition for Waiver and Granting of the Application for Interim Waiver of the General Electric Company From the Department of Energy Clothes Dryer Test Procedures
This notice announces receipt of and publishes the General Electric Company's (GE's) Petition for Waiver (hereafter, ``petition'') from the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of residential clothes dryers. The waiver request pertains to GE's specified single model line of condensing residential clothes dryers. The existing test procedure does not apply to condensing clothes dryers. In addition, today's notice grants GE an interim waiver from the DOE test procedures applicable to residential clothes dryers. DOE solicits comments, data, and information with respect to GE's petition.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.