Accrual of Allowance for Funds Used During Construction: Pacific Connector Gas Pipeline, LP; Fayetteville Express Pipeline LLC; Florida Gas Transmission Company, LLC; Midcontinent Express Pipeline LLC; Southern Natural Gas Company; Southeast Supply Header, LLC/Southern Natural Gas Company; Ruby Pipeline, LLC; Texas Eastern Transmission, LP; Supplemental Notice on Technical Conference on Commission Policy on Commencement of Accrual of Allowance for Funds Used During Construction, 66637 [E9-29915]
Download as PDF
Federal Register / Vol. 74, No. 240 / Wednesday, December 16, 2009 / Notices
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
during construction (AFUDC) specified
several recent and pending proceedings
in which the issue of the accrual of
AFDUC is raised. This issue is raised in
two additional pending proceedings:
Fayetteville Express Pipeline LLC in
Docket No. CP09–433–000 and
Midcontinent Express Pipeline LLC in
Docket Nos. CP08–6–005 and Docket
No. CP09–56–000. Accordingly, these
two cases will be included with those
previously specified as a subject of the
technical conference to be held on
Tuesday, December 15, 2009, from 9
a.m. until 1 p.m., in the Commission
Meeting Room, at the Commission’s
offices at 888 First Street, NE.,
Washington, DC.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–29915 Filed 12–15–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
66637
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Friday, December 18, 2009.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSKHWCL6B1PROD with NOTICES
[Docket No. AD10–3–000; Docket Nos.
CP07–441–000; Docket No. CP09–433–000;
Docket No. CP09–17–000; Docket No.
AC08–161–000; Docket No. CP08–6–005;
Docket No. CP09–56–000; Docket No.
CP09–36–002; Docket No. CP09–40–001;
Docket No. CP09–54–001; Docket No.
CP09–68–000]
Accrual of Allowance for Funds Used
During Construction: Pacific
Connector Gas Pipeline, LP;
Fayetteville Express Pipeline LLC;
Florida Gas Transmission Company,
LLC; Midcontinent Express Pipeline
LLC; Southern Natural Gas Company;
Southeast Supply Header, LLC/
Southern Natural Gas Company; Ruby
Pipeline, LLC; Texas Eastern
Transmission, LP; Supplemental
Notice on Technical Conference on
Commission Policy on
Commencement of Accrual of
Allowance for Funds Used During
Construction
December 9, 2009.
The December 2, 2009 notice of a
technical conference to address the
accrual of allowance for funds used
VerDate Nov<24>2008
16:18 Dec 15, 2009
Jkt 220001
[Docket No. PR10–3–000]
Kimberly D. Bose,
Secretary.
[FR Doc. E9–29914 Filed 12–15–09; 8:45 am]
Enogex L.L.C.; Notice of Petition for
Rate Approval
BILLING CODE 6717–01–P
December 9, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–29910 Filed 12–15–09; 8:45 am]
DEPARTMENT OF ENERGY
Take notice that on November 23,
2009, Enogex L.L.C. (Enogex) filed
pursuant to section 284.123(b)(2) of the
Commission’s regulations, filed a
petition requesting that the Commission
approve its rates pursuant to section
311(a)(2) of the Natural Gas Policy Act
of 1978. Enogex proposes a fuel factor
of 0.92% for the East Zone and a fuel
factor of 1.12% for the West Zone of its
system for Fuel Year 2010.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RM04–7–007]
Market-Based Rates For Wholesale
Sales of Electric Energy, Capacity and
Ancillary Services by Public Utilities;
Notice of Request for Clarification
October 30, 2009.
Take notice that on March 9, 2009, as
amended on October 28, 2009, the
Compliance Working Group1 filed a
request for clarification regarding which
employees can be ‘‘shared’’ for purposes
of compliance with the Commission’s
Affiliate Restrictions adopted under
Order No. 697.2
1 The members of the Compliance Working Group
taking part in the filing are: Allegheny Energy, Inc.,
American Electric Power Company, Inc., Cleco
Corporation, Consumers Energy Company,
Dominion Resources, Inc., Duke Energy
Corporation, Edison International, El Paso Electric
Company, Energy East Corp., Entergy Corporation,
Exelon Corporation, FirstEnergy Corp., FPL Group,
Inc., Pacific Gas and Electric Co., Progress Energy,
Inc., Public Service Enterprise Group Inc., and
Westar Energy, Inc.
2 Market-Based Rates for Wholesale Sales of
Electric Energy, Capacity and Ancillary Services by
Public Utilities, Order No. 697, FERC Stats. & Regs.
¶ 31,252 (Order No. 697), clarified, 121 FERC
E:\FR\FM\16DEN1.SGM
Continued
16DEN1
Agencies
[Federal Register Volume 74, Number 240 (Wednesday, December 16, 2009)]
[Notices]
[Page 66637]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-29915]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD10-3-000; Docket Nos. CP07-441-000; Docket No. CP09-433-
000; Docket No. CP09-17-000; Docket No. AC08-161-000; Docket No. CP08-
6-005; Docket No. CP09-56-000; Docket No. CP09-36-002; Docket No. CP09-
40-001; Docket No. CP09-54-001; Docket No. CP09-68-000]
Accrual of Allowance for Funds Used During Construction: Pacific
Connector Gas Pipeline, LP; Fayetteville Express Pipeline LLC; Florida
Gas Transmission Company, LLC; Midcontinent Express Pipeline LLC;
Southern Natural Gas Company; Southeast Supply Header, LLC/Southern
Natural Gas Company; Ruby Pipeline, LLC; Texas Eastern Transmission,
LP; Supplemental Notice on Technical Conference on Commission Policy on
Commencement of Accrual of Allowance for Funds Used During Construction
December 9, 2009.
The December 2, 2009 notice of a technical conference to address
the accrual of allowance for funds used during construction (AFUDC)
specified several recent and pending proceedings in which the issue of
the accrual of AFDUC is raised. This issue is raised in two additional
pending proceedings: Fayetteville Express Pipeline LLC in Docket No.
CP09-433-000 and Midcontinent Express Pipeline LLC in Docket Nos. CP08-
6-005 and Docket No. CP09-56-000. Accordingly, these two cases will be
included with those previously specified as a subject of the technical
conference to be held on Tuesday, December 15, 2009, from 9 a.m. until
1 p.m., in the Commission Meeting Room, at the Commission's offices at
888 First Street, NE., Washington, DC.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-29915 Filed 12-15-09; 8:45 am]
BILLING CODE 6717-01-P