Army Department – Federal Register Recent Federal Regulation Documents
Results 1,351 - 1,400 of 1,462
Intent To Prepare an Environmental Impact Statement for Potential Multipurpose Projects for Flood Damage Reduction and Recreation Development Within and Along the Highland Lakes, Colorado River, TX
Four Authorities authorize the study of the Colorado River and its Tributaries: (1) Flood Control Act, approval June 22, 1936: ``Section 6. The Secretary of War is hereby authorized and directed to cause preliminary examinations and surveys for flood control at the following named localities * * * Colorado River, Texas, above the county line between Coke and Runnels counties * * * Lower Colorado River, Texas.'' (2) Resolution by the Committee on Commerce, United States Senate, adopted August 4, 1936; ``Resolved by the Committee of the United States Senate, that the Board of Engineers for Rivers and Harbors created under Section 3 of the River and Harbor Act, approved June 13, 1902, be and is hereby, requested to review the reports on Colorado River, Texas, submitted in House Document Number 361, Seventy- first Congress, second session, and previous reports, with a view to determining if improvement in the interest of commerce and flood control is advisable at the present time.'' (3) Rivers and Harbors Act, approved August 26, 1937: ``Section 4. The Secretary of War is hereby authorized and directed to cause preliminary examinations and surveys to be made at the following named localities * * * Colorado River, and its tributaries, Texas, with a view to its improvement in the interest of navigation and flood control.'' (4) Rivers and Harbors Act, approved March 2, 1945: ``Section 6. The Secretary of War is hereby authorized and directed to cause preliminary examinations and surveys to be made at the following named localities * * * Colorado River, Texas.'' An initial assessment based on the resolution guidance indicates a Federal interest in continuing with more detailed studies for these purposes. In accordance with the National Environmental Policy Act, an Environmental Impact Statement (EIS) will be prepared to evaluate and compare flood control damage reduction and recreation alternatives within and along the Colorado River and its tributaries concentrated along the Highland Lakes. The EIS will also assess the impacts to the quality of the human environment associated with each alternative. The study area for project implementation primarily includes the lower Colorado River and its adjoining tributaries below Lake O.H. Ivie to Tom Miller Dam or Lake Austin. The construction of residential and commercial structures within the Highland Lakes and along the Colorado River, have lead to extensive amounts of flood damages. Consequently, flood damage reduction measures will be developed to address the flood damages. In addition, recreation measures will be developed and evaluated as complements to proposed flood damage reduction measures. The non-Federal cost sharing sponsors for the feasibility study are the Lower Colorado River Authority and Travis County.
Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/DEIR) for Proposed Future Permit Actions Under Section 404 of the Clean Water Act for the Newhall Ranch Specific Plan and Associated Facilities Along Portions of the Santa Clara River and Its Side Drainages, and Development of a Candidate Conservation Agreement with Assurances (CCAA) for the San Fernando Valley Spineflower, in Los Angeles County, California, With the U.S. Fish and Wildlife Service
The project proponent and landowner, The Newhall Land and Farming Company (Newhall Land), has requested a long-term Clean Water Act Section 404 permit from the Corps of Engineers for facilities associated with the Newhall Ranch Specific Plan. The action is necessary to facilitate buildout of the Specific Plan. The effect will be to authorize the construction of bridges, flood control structures, and to grade and fill certain side drainages for roads and buildings. The reason for this revised notice of intent (NOI) is because the project proponent's proposed action has been expanded to include development of a voluntary CCAA between Newhall Land and the U.S. Fish and Wildlife Service (USFWS) to specify spineflower preserve locations, manage spineflower habitat, and to authorize future take of spineflower, in the event it becomes federally listed under the federal Endangered Species Act as threatened or endangered, involving three properties: Newhall Ranch, Valencia Commerce Center, and Entrada. The Corps of Engineers intends to prepare a Draft Environmental Impact Statement (DEIS) to evaluate the potential effects of the proposed action on the environment. To eliminate duplication of paperwork, the Corps of Engineers intends to coordinate the DEIS with the Draft Environmental Impact Report (DEIR) being prepared by the California Department of Fish and Game. The joint document will meet the requirements of the National Environmental Policy Act (NEPA) as well as enable the Corps to analyze the project pursuant to the 404(b)(1) Guidelines and assess potential impacts on various public interest factors.
Intent To Prepare a Draft Supplemental Environmental Impact Statement for the Dredged Material Management Plan for the Calcasieu River and Pass, Louisiana, Federal Navigation Channel
The U.S. Army Corps of Engineers, New Orleans District (CEMVN) is initiating this draft supplemental environmental impact statement (DSEIS) under the authority of the Rivers and Harbors Act of July 24, 1946 (House Document 190, 79th Congress, 2nd Session) and prior Rivers and Harbors acts; the Rivers and Harbors Act of July 14, 1960 (House Document 436, 86th Congress, 2nd Session); the Rivers and Harbors Act of October 23, 1962 (House Document 582, 87th Congress, 2nd Session); the Senate Public Works committee on December 27, 1970, and the House Public Works committee on December 15, 1970, under the provisions of Section 201 of the Flood Control Act of 1965 (Pub. L. 89-298; S.D. 91- 111); and Section 107 of the Rivers and Harbors Act of 1960, as amended by Section 310 and Section 112 of the Rivers and Harbors Acts of 1965 and 1970, respectively, to investigate dredged material placement for the next 20 years of maintenance dredging of the Calcasieu and River and Pass, LA. The Calcasieu River and Pass, LA project does not have adequate dredged material disposal areas for the long-term maintenance of the project. Existing disposal sites are at or near capacity, and some disposal sites have been substantially eroded into adjacent water bodies. Other disposal areas have been lost to commercial developments. As a result, remaining disposal areas cannot accommodate the volume of dredged material needed to maintain the Calcasieu River and Pass, LA navigation channel to project-authorized dimensions, and CEMVN has been forced to reduce channel dimensions in some reaches.
Inland Waterways Users Board
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: July 27, 2005. Location: Radisson Riverfront Hotel St. Paul, 11 East Kellogg Blvd, St. Paul, Minnesota 55101, (1-651-292-1900). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 12:30 p.m. Agenda: The Board will hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund. The Board will also consider its priorities for the next fiscal year.
Prospective Grant of Exclusive Patent License
In accordance with 35 U.S.C. 209 and 37 CFR 404, U.S. Army Research, Development and Engineering Command (RDECOM) hereby given notice that it is contemplating the grant of an exclusive license in the United States to practice the below referenced invention owned by the U.S. Government to TSI Incorporated, 500 Cardigan Road, Shoreview, MN 55126.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Applications Concerning Inhibitors of Type F Botulinum Neurotoxin Proteinase Activity
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 60/656,551 entitled ``Inhibitors of Type F Botulinum Neurotoxin Proteinase Activity,'' filed February 17, 2005; as well as the invention set forth in related U.S. Provisional Patent application Serial No. 60/660,024 entitled ``Inhibitors of Type F Botulinum Neurotoxin Proteinase Activity,'' filed February 23, 2005. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Final Supplemental Environmental Impact Statement for the Wyoming Valley Levee Raising Project, Wilkes-Barre, PA
The U.S. Army Corps of Engineers (USACE), Baltimore District announces the availability of the Final Supplemental Environmental Impact Statement (SEIS) for the design modifications and recreational enhancements to the Wyoming Valley Levee Raising Project at the Wilkes- Barre, Pennsylvania River Commons. The Final SEIS investigates the potential environmental effects of an array of alternative plans based on the conceptual riverfront plan for Wilkes-Barre. The preferred alternative includes the addition of two portals through the levee, a river landing, fishing platform, and an amphitheater and stage. The Draft SEIS was released on a 45-day review and comment period during August and September 2004, and a Notice of Availability was published in the Federal Register under the U.S. Environmental Protection Agency on August 13, 2004. Comments received on the Draft SEIS and our responses are included in the Final SEIS (Appendices G and H).
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Coyote Creek Watershed Management Plan Feasibility Study, Orange and Los Angeles Counties, CA
The Coyote Creek Watershed Study will integrate and balance the physical and biological systems within the watershed to enhance aquatic and terrestrial habitat, improve water quality, enhance water resources, increase trail connections, enhance passive recreation and open space, reduce sediment and erosion, and aid in flood protection. Additionally, the Watershed Management Plan will encourage greater cooperation between public agencies and private organizations to leverage limited resources and improve quality of life within the watershed. It will be a guidance document for watershed stakeholders to better manage watershed resources and land use. This Plan will identify and prioritize projects for maintaining, constructing, restoring, and enhancing resources that contribute to a healthy and sustainable watershed. Policy and management recommendations will result from this plan that will connect existing public policy and watershed management principles. The U.S. Army Corps of Engineers and the County of Orange, California will cooperate in conducting this feasibility study.
Board of Visitors, United States Military Academy (USMA)
The notice of an open meeting scheduled for July 15, 2005 published in the Federal Register on June 10, 2005 (70 FR 33884) has a new meeting place. The meeting will now be held at the Kimsey Athletic Center, West Conference Room, 4th Floor, West Point, NY.
Reserve Officers' Training Corps (ROTC) Program Subcommittee
The Reserve Officers' Training Corps (ROTC) Program Subcommittee meetings scheduled for July 6 and 7, 2005 from 0800-1700 published in the Federal Register on Wednesday, June 22, 2005 (70 FR 36128) has been cancelled.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Construction and Operation of an Open Pit Copper/Nickel/Cobalt/Precious Metals Mine, an Ore Processing Plant, and Tailings Basin Proposed by PolyMet Mining, Inc. Near Babbitt and Hoyt Lakes in St. Louis County, MN
PolyMet Mining, Inc., has applied to the St. Paul District, Corps of Engineers (Corps) for a permit to discharge fill material into wetlands to facilitate the construction and operation of an open pit copper/ nickel/cobalt/precious metals mine in the low grade polymetallic disseminated magmatic sulfide NorthMet deposit in northeastern Minnesota, approximately 6 miles south of the town of Babbitt. The mining process would require the construction of waste and product stockpiles near the open pit. Ore processing would be conducted at a currently inactive taconite processing plant (modifications would be necessary), and ore tailings would be disposed of in a currently inactive taconite tailings basin adjacent to the processing plant. The processing plant and tailings basin are located about 8 miles west of the NorthMet deposit and about 5 miles north of the town of Hoyt Lakes. Ore would be transported from the mine to the processing plant via an existing railroad line. Construction of a railroad spur to the mine and a connecting railroad line to the plant site would be required. Project plans call for the mining of up to 32,000 tons of ore per day after overburden and waste rock stripping and stockpiling. Mining operations would be conducted 24 hours per day, 365 days per year, over the 20- year life of the project. Processing the ore would involve crushing, grinding, flotation, and hydrometallurgical processing. Cathode copper (high purity metal) would be produced on-site by solvent extraction and electrowinning. The processing would produce other metals (nickel, cobalt, palladium, platinum, and gold) as precipitates rather than as finished metal. The precipitates would be shipped offsite for further refining. The project would require dredging or discharging fill material into an estimated 1,257 acres of wetlands. While some of the wetlands may be isolated, the majority of the wetlands are adjacent to the Partridge River, which is a tributary to the St. Louis River, which is a navigable water of the United States. A specific compensatory wetland mitigation plan has not yet been developed for the project. PolyMet Mining, Inc., has expressed interest in working with various interested federal and state agencies to develop an acceptable plan that would meet federal and state compensatory mitigation requirements. The discharge of fill material into waters of the United States requires a permit pursuant to Section 404 of the Clean Water Act. The final environmental impact statement will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Intent to Prepare an Environmental Impact Statement on an Application for a Department of the Army Permit Under Section 404 of the Clean Water Act by the Angelina & Neches River Authority for the Construction of Lake Columbia, a Proposed 10,000-Surface-Acre Water Supply Reservoir in Smith and Cherokee Counties, TX
The U.S. Army Corps of Engineers, Forth Worth District (USACE) has received an application for a Department of the Army permit under Section 404 of the Clean Water Act (CWA) from the Angelina & Neches River Authority (ANRA) to construct Lake Columbia. In accordance with the National Environmental Policy Act (NEPA0 of 1969 (42 U.S.C. 4321 et seq.), the USACE has determined that issuance of such a permit may have a significant impact on the quality of the human environment and, therefore, requires the preparation of an Environmental Impact Statement (EIS). The USACE intends to prepare an EIS to assess the environmental, social, and economic effects of issuances of a Department of the Army permit under Section 404 of the CWA for discharges of dredged and fill material into waters of the United States (U.S.) associated with the construction of the proposed water supply reservoir. In the EIS, the USACE will assess potential impacts associated with a range of alternatives.
Intent to Prepare a Draft Environmental Impact Statement for the Success Dam Seismic Remediation Project, CA
Pursuant to the National Environmental Policy Act of 1969, as amended, the U.S. Army Corps of Engineers, Sacramento District (Corps), intends to prepare a Draft Environmental Impact Statement (EIS) for the Federal action to remediate seismic dam safety concerns at the Lake Success Project located on the Tule River, near Porterville, CA. The proposed action is being conducted through the Corps' Dam Safety Assurance Program for the evaluation of existing dams.
United States Marine Corps Restricted Area; Broad River and Beaufort River and tributaries, Marine Corps Recruit Depot, Parris Island, South Carolina
The Corps of Engineers is proposing regulations to establish a restricted area around the Marine Corps Recruit Depot (MCRD), Parris Island, South Carolina including areas within the Broad River, the Beaufort River, Battery Creek, Archers Creek, Ballast Creek and Ribbon Creek in the vicinity of the Marine Corps Recruit Depot, Parris Island, South Carolina. The MCRD restricted area will surround Parris Island and Horse Island and the causeways in between. The purpose of these regulations is to provide effective security in the vicinity of the Marine Corps Recruit Depot.
Military Police Investigations
The Department of the Army is publishing our rule concerning military police investigations. The regulation prescribes policies and procedures on types and categories of offenses investigated by Military Police and DA Civilian detectives/ investigators.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Method and Apparatus for Making Body Heating and Cooling Garments
In accordance with 37 CFR Part 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 6,901,608 B2 entitled ``Method and Apparatus for Making Body Heating and Cooling Garments'' issued June 7, 2005. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Development of a Biosensor for Anthrax Therapeutics and Diagnostics
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 60/653,230 entitled ``Development of a Biosensor for Anthrax Therapeutics and Diagnostics, filed February 14, 2005. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Availability of Draft General Reevaluation Report and Supplemental Environmental Impact Statement for the Poplar Island Environmental Restoration Project, Talbot County, MD
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft General Reevaluation Report (GRR) and Supplemental Environmental Impact Statement (SEIS) for the Poplar Island Environmental Restoration Project (PIERP) to evaluate the vertical and/or lateral expansion of the PIERP, design modifications to the existing project, the addition of recreational/ educational opportunities to the existing project, and the potential to accept dredged material from additional channels not specified in the 1996 EIS for the existing project. The preferred alternative includes a northern lateral expansion consisting of approximately 575 acres, of which 60% will be wetland habitat and 40% upland habitat; construction of a 5-ft vertical raising of the existing upland Cells 2 and 6 at the PIERP; amending the existing project authorization and Project Cooperation Agreement (PCA) to include the placement of dredged material from the southern approach channels to the Chesapeake and Delaware (C&D) Canal and other small Federal navigation projects; incorporation of design modifications required for the completion of the existing project, and development of recreational and educational enhancements for the PIERP. The Corps is making the Draft integrated GRR/SEIS available to the public for a 45- day review and comment period.
Reserve Officers' Training Corps (ROTC) Program Subcommittee
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (5 U.S.C., App. 2), announcement is made of the following Committee meeting:
Board of Visitors, United States Military Academy (USMA)
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board of Visitors, United States Military Academy. Date: Friday, July 15, 2005. Place of Meeting: Superintendent's Conference Room, Taylor Hall, Building 600, West Point, NY. Start Time of Meeting: Approximately 1 p.m.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed River Islands Project, in San Joaquin County, CA
The U.S. Army Corps of Engineers, Sacramento District (Corps), will prepare a Draft Environmental Impact Statement (DEIS) for Corps authorization actions for the proposed River Islands project. The overall project purpose is to construct a large-scale, mixed-use project consisting of residential development, a commercial complex, and which may include open space and recreational amenities, located in San Joaquin County or the south delta area. The DEIS will address impacts such as major changes in the operation and maintenance of a Federal flood control project, navigation, hydrology, water quality, wetlands, endangered species, agricultural resources, transportation, cultural resources, and air quality.
Intent To Prepare a Draft Revised General Reevaluation Report/Second Supplemental Environmental Impact Statement (RGRR/SEIS) for the Modified Water Deliveries to Everglades National Park, Tamiami Trail Feature
The Jacksonville District, U.S. Army Corps of Engineers intends to prepare a Draft Second Supplemental Environmental Impact Statement (DSEIS) for the Tamiami Trail feature of the Modified Water Deliveries to Everglades National Park (MWD) project in Miami-Dade County. The study is a cooperative effort between the U.S. Army Corps of Engineers, Everglades National Park (ENP), the Florida Department of Transportation, and the South Florida Water Management District.
Notice of Solicitation for Estuary Habitat Restoration Program
Congress has appropriated limited funds to the U.S. Army Corps of Engineers (Corps) to implement the Estuary Habitat Restoration Program as authorized in Section 104 of the Estuary Restoration Act of 2000, Title I of the Estuaries and Clean Waters Act of 2000 (Pub. L. 106-457) (accessible at https://restoration.nos.noaa.gov/pdfs/act s835.pdf). On behalf of the Estuary Habitat Restoration Council (Council), the Corps is soliciting proposals for estuary habitat restoration projects. This document describes project criteria and evaluation criteria the Council will use to determine which projects to recommend. Recommended projects must provide ecosystem benefits, have scientific merit, be technically feasible, and be cost-effective. Proposals selected for Estuary Habitat Restoration Program funding will be implemented in accordance with a cost-share agreement with the Corps. This is not a grants program.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning System and Method for Evaluating Data Sets Over a Communications Network
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 60/634,987 entitled ``System and Method for Evaluating Data Sets Over a Communications Network,'' filed December 13, 2004. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Chief of Engineers Environmental Advisory Board Meeting
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. The meeting is open to the public. Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Date: June 17, 2005. Location: Radisson Hotel Old Town Alexandria, 901 N. Fairfax Street, Alexandria, VA 22314-1501, (703) 683-6000. Time: 9 a.m. to 12 p.m.
Intent To Prepare a Draft Environmental Impact Statement Titled: Alexandria, LA, to the Gulf of Mexico Flood Control Improvements in the Chatlan Lake Canal Basin
The U.S. Army Corps of Engineers, New Orleans District, is initiating this study authorized by a July 23, 1997 resolution of the Committee on Transportation and Infrastructure of the U.S. House of Representatives. The resolution reads: ``Resolved by the Committee on Transportation and Infrastructure of the U.S. House of Representatives, that the Secretary of the Army is required to review the report of the Chief of Engineers on the Mississippi River and Tributaries Project, published as House Document 308, Eighty-eighth Congress, Second Session, and other pertinent reports, to determine whether modifications of the recommendations contained therein are advisable at the present time in the interest of flood control, navigation, wetlands, conservation restoration, wildlife habitat, commercial and recreational fishing, saltwater intrusion, freshwater and sediment diversion, and other purposes in the area drained by the West Atchafalaya Basin Protection Levee, from Alexandria, Louisiana, to the Gulf of Mexico.''
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Construction of a Proposed Disposal Site for Dredged material in the Middle Branch of the Patapsco River, at Masonville, Baltimore City/Application for a Corps Section 10/404 Individual Permit
The Baltimore District, U.S. Army Corps of Engineers (Corps) expects receipt of an application in January 2006 from the State of Maryland Department of Transportation, Maryland Port Administration (MPA) for a Section 10/404 individual permit for the construction of a disposal site for dredged material in the Middle Branch of the Patapsco River, at Masonville, Baltimore City, MD. Based on preliminary discussions with the MPA, the Corps has determined that an environmental impact statement (EIS) is required for this proposed project. The applicant's stated purpose of the proposed project is to provide a disposal site to accommodate dredged material generated by dredging projects occurring over the next 5 to 10 years in the Baltimore Harbor area. The EIS will focus on the 5-10 year dredging needs within Baltimore Harbor and upland containment and beneficial use of dredged materials from the Port of Baltimore channel system in the Patapsco River and its tributaries. As part of this study, in accordance with the National Environmental Policy Act (NEPA) of 1969, an EIS will be prepared to document the plan formulation process and recommendations of this study.
Navigation Regulations
The U.S. Army Corps of Engineers is proposing to establish a procedure for modifying scheduled operational hours at the Lake Washington Ship Canal, Hiram M. Chittenden Locks in Seattle, Washington. This procedure would allow the district engineer to change the scheduled operational hours of the locks after issuing a public notice and providing a 30-day comment period for any proposed change. Corrections are also made to two citations.
Intent To Prepare a Draft Environmental Impact Statement for the Louisiana Coastal Area (LCA)-Louisiana, Caminada Headland and Shell Island Restoration Feasibility Study
This notice of intent (NOI) for the Louisiana Coastal Area (LCA)Louisiana, Caminada Headland and Shell Island Restoration Feasibility Study (LCA Caminada-Shell Island Study) supersedes the notices of intent for the Barrier Shoreline Restoration in Lafourche, Jefferson, and Plaquemines Parishes, Louisiana, a Component of the Louisiana Coastal Area, LouisianaEcosystem Restoration, Barrier Island Restoration, Marsh Creation, and River Diversion, Barataria Basin Feasibility Study (Barrier Shoreline Restoration Study); and the Wetland Restoration and/or Creation in the Barataria Basin, Louisiana, a Component of the Louisiana Coastal Area, LouisianaEcosystem Restoration, Barrier Island Restoration, Marsh Creation, and River Diversion, Barataria Basin Feasibility Study (LCA Wetland Restoration Study). This notice of intent addresses the Caminada Headland and Shell Island reaches of the Barataria barrier shoreline that is presently addressed in the NOI for the Barrier Shoreline Restoration Study and also addresses the Chenier Unit marsh creation feature that is presently addressed in the NOI for the Wetland Restoration Study.
Intent To Prepare a Draft Environmental Impact Statement for the Kissimmee Chain of Lakes Portion of the Kissimmee River Restoration Project
The Jacksonville District, U.S. Army Corps of Engineers, intends to prepare a Draft Environmental Impact Statement (DEIS) for the Kissimmee Chain of Lakes (KCOL) portion of the Kissimmee River Restoration (KRR) project. This project involves the establishment of a coordinated schedule of water level drawdowns throughout the seventeen lakes comprising the Kissimmee Chain of Lakes (KCOL), for the ultimate purpose of facilitating environmental restoration throughout those water bodies. The local sponsor is the South Florida Water Management District.
Intent to Prepare a Draft Environmental Impact Statement (DEIS) for the Nourishment of 7.25 Miles of Beach, the Repositioning of the New River Inlet Channel, and the Implementation of an Inlet Management Plan, in North Topsail Beach, Onslow County, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Field Office has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from the Town of North Topsail Beach to nourish approximately 7.25 miles of beachfront to protect residential homes and town infrastructures, and to implement an inlet management plan with the New River Inlet to control the positioning of the inlet channel. The new channel will be centrally located perpendicular to the adjacent shorelines of North Topsail Beach and Onslow Beach. The proposed source of the material for the nourishment will be dredged from offshore borrow area(s) and from the repositioning of the inlet. The placement of beach fill along the Town's shoreline would result in the initial widening of the beach by 50 to 100 feet. The widened beach would be maintained through a program of undefined periodic beach nourishment events with the material extracted primarily from the New River Inlet. The ocean shoreline in the Town of North Topsail Beach encompasses approximately 11.1 miles along the northern end of Topsail Island. Currently, the U.S. Army Corps of Engineers is developing a Federal shoreline protection plan for parts of North Topsail Beach. This Federal plan will only cover 3.85 miles of the southern part of the beach. The remaining 7.25-miles of North Topsail Beach, with the exception of two small areas, is located within the Coastal Barrier Resource System (CBRS), which prohibits the expenditure of Federal funds that would encourage development. Therefore, the Town is pursuing to develop this non-Federal shoreline protection plan that will preserve existing development and infrastructure along the 7.25 miles of shoreline. The channel through New River Inlet has been maintained by the COE for commercial and recreational boating interest for over 55 years. The COE is authorized to maintain the channel in the inlet to a depth of 6 feet mean low water (mlw) over a width of 90 feet.
Intent To Prepare a Draft Environmental Impact Statement in Conjunction With Proposed Sediment Management and Restoration Measures on the Grand Calumet River and non-Federal Portions of the Indiana Harbor Canal in Lake County, IN
The study involves sediment management and restoration measures on the Grand Calumet River and non-Federal portions of the Indiana Harbor Canal. Potential alternatives to be evaluated are type and extent of dredging, possibility of capping areas, disposal options and restoration measures. The Draft Environmental Impact Statement (DEIS) is expected to be released for public review in June 2006. As part of the scoping process, written comments will be accepted for a 60-day period, starting from the date of this notice. Comments should be submitted to Mr. Keith Ryder (see ADDRESSES).
Availability of Draft Integrated Feasibility Report & Environmental Impact Statement for the Flood Damage Reduction Project, Bloomsburg, PA
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft Integrated Feasibility Report & Environmental Impact Statement (EIS) for the flood damage reduction project for the Town of Bloomsburg, in Columbia County, PA. The integrated report investigates the potential environmental effects of an array of alternative plans based on reducing flood damages in Bloomsburg. The preferred alternative includes 16,555 linear feet of levee/floodwall systems with fourteen drainage structures, and nine closure structures, six of which incorporate limited road raisings. We are making the integrated report and EIS available to the public for a 45-day review and comment period.
Armed Forces Epidemiological Board; Meeting
In accordance with section 10(a)(2) of Pub. L. 92-463, The Federal Advisory Committee Act, announcement is made of the following meeting: Name of Committee: Armed Forces Epidemiological Board (AFEB). Dates: June 21, 2005 (Open meeting). June 22, 2005 (Open meeting). Times: 8 a.m.-5 p.m. (June 21, 2005). 8 a.m.-4:15 p.m. (June 22, 2005). Location: The Hope Hotel and Conference Center, Building 823, Area A, Air Force Research Laboratory, Wright-Patterson Air Force Base, Dayton, Ohio 45433-5000. Agenda: The purpose of the meeting is to address pending and new Board issues, provide briefings for Board members on topics related to ongoing and new Board issues, conduct subcommittee meetings, and conduct an executive working session.
Coastal Engineering Research Board (CERB)
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Coastal Engineering Research Board (CERB). Date of Meeting: June 7-9, 2005. Place: William A. Egan Civic and Convention Center, 555 West 5th Avenue, Anchorage, AK 99501. Times:
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.