Army Department – Federal Register Recent Federal Regulation Documents
Results 1,451 - 1,462 of 1,462
Availability of Draft Tiered Environmental Impact Statement for the Baltimore Harbor and Channels Dredged Material Plan, MD
In accordance with the requirements of the National Environmental Policy Act, the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft Tiered Environmental Impact statement (TEIS) and Dredged Material Management Plan (DMMP) to analyze dredged material placement for the Port of Baltimore for 20 years of maintenance and new work dredging. USACE is making the document available to the public for review and comment through a Notice of Availability published in the Federal Register. The overall goal of the DMMP is to develop a plan to maintain, in an economically and environmentally sound manner, channels necessary for navigation for the Port of Baltimore, conduct dredged material placement in the most environmentally sound manner, and maximize the use of dredged material as a beneficial resource. The recommendations which will provide a minimum of 20 years of dredged material placement capacity for the Port of Baltimore are: Continued use of open water placement in Virginia (Dam Neck Open Water Placement; Rappahannock Shoal Deep Alternate Open Water Placement; and Wolf Trap Alternate Open Water Placement). Optimized use of existing dredged material management sites in Maryland, including Pooles Island Open Water Site, Hart-Miller Island Dredged Material Containment Facility, Cox Creek Confined Disposal Facility and Poplar Island Environmental Restoration Project (PIERP). Multiple confined disposal facilities for harbor material in Patapsco River. Large Island Restoration-Middle Chesapeake Bay. PIERP Expansion. Wetland Restoration-Dorchester County. We are making the Draft TEIS available to the public for a 45-day review and comment period.
Notice of Intent To Prepare a Draft Environmental Impact Statement for an Environmental Dredging Project on the Mahoning River in Ohio
This notice advises the public that pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the Pittsburgh District (District), U.S. Army Corps of Engineers, intends to develop a Draft Environmental Impact Statement (EIS). The Draft EIS will consider Federal actions associated with the District's proposal to restore the aquatic ecosystem of the lower Mahoning River in Ohio through (1) Dredging contaminated sediments lining the river; (2) bioremediating sediments in the bank and river where applicable; (3) capping contaminants in the bank; and (4) removing low-head dams along the river; or a combination of all four actions. The lower Mahoning River's ecosystem has been severely impacted by contamination from industries that once lined the valley and by several low-head dams that disrupt the river's natural hydrology. The proposed project will improve the lower Mahoning River's ecosystem to a level found at a model reach located just upstream of the project area.
Board of Visitors, United States Military Academy (USMA)
In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board of Visitors, United States Military Academy. Date: Wednesday, March 2, 2005. Place of Meeting: Veterans Affairs Conference room, Room 418, Senate Russell Building, Washington, DC. Start Time of Meeting: Approximately 10 a.m.
Mandatory Use of US Bank's Power Track System by Department of Defense Personal Property Transportation Service Providers (TSPs)
The Military Surface Deployment and Distribution Command (SDDC), as the Traffic Manager for Department of Defense (DOD) Personal Property Program, is informing the TSP community of SDDC's mandatory requirement to use US Bank's PowerTrack System as the transaction and payment system for all DOD TSP's handling personal property. Furthermore, the use of SDDC's Centralized Web Application (CWA) will also be mandatory. This mandatory usage is effective 30 days from publication of this notice beginning with all TSP's who have a Letter of Intent (LOI) on file with participating sites. Each time a new site is added to Phase I, TSPs not participating in Phase I will have 30 days to execute a Trading Partner Agreement with USBank and be PowerTrack certified. Implementation of PowerTrack at all Military Services and Coast Guard installations is the goal of Families First, which is the first step in moving toward the reengineered Personal Property Program of the future. This announcement is a follow-on to Federal Register notices published on June 5, 2003 (68 FR 33683) and September 29, 2003 (68 FR 55947) proposing mandatory use of US Bank's Power Track System by Department of Defense Personal Property Transportation Service Providers. Effective 30 days from publication of this notice, they are required to have a Trading Partner Agreement with US Bank and be PowerTrack certified in order to participate in the DoD Personal Property Program. This notice affords TSP's ample time to plan for the use of PowerTrack. The Electronic Billing and Payment portion of the Families First Web site is located at https://www.sddc.army.mil, under Personal Property Program. This site offers industry access to updates on the Business Rules, Concept of Operations (CONOPS), System Interface Specifications and the latest information.
Intent To Prepare an Environmental Impact Statement for Proposed Wharf Improvements and Fill at Apra Harbor, GU
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 as implemented by the Council on Environmental Quality (CEQ) regulations (40 CFR parts 1500-1508), the Port Authority of Guam and the U.S. Army Corps of Engineers hereby give notice of intent to prepare a Environmental Impact Statement (EIS) for proposed wharf improvements and fill at Apra Harbor, Guam. Under a Federal grant from the U.S. Department of Commerce Economic Development Administration, the Port Authority of Guam is proposing modifications to Apra Harbor for the purpose of improving maritime access and services to the island of Guam. The harbor is in need of improvements to meet anticipated future demands of the island's commercial port operations by providing additional cargo container storage area, and berthing facilities capable of accommodating the newest generation of large deep draft container vessels, and cruise ships. The proposed improvements would also provide contingency berthing facilities for U.S. Navy military vessels. The U.S. Army Corps of Engineers will be the lead agency in preparing the EIS. The EIS will provide an analysis of potential impacts to the environment from the proposed modifications to Apra Harbor, in compliance with NEPA and CEQ regulations.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: February 24, 2005. Location: The Washington Court Hotel, 525 New Jersey Avenue NW., Washington, DC 20001-1527, (1-202-628-2100). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund. The Board will also consider its priorities for the next fiscal year.
Final Environmental Impact Statement for the Proposed Leasing of Lands at Fort Bliss, TX for the Proposed Siting, Construction, and Operation by the City of El Paso of a Brackish Water Desalination Plant and Support Facilities
The Department of the Army announces the availability of the Final Environmental Impact Statement (FEIS) evaluating the potential environmental impacts that could result from granting an easement to the City of El Paso, El Paso Water Utilities (EPWU), to use land in the South Training Areas of Fort Bliss for construction and operation of a desalination plant and support facilities, including wells, pipelines, and disposal sites for the residual brine resulting from the desalination process. The purpose of the proposed plant is to treat brackish (salty) water pumped from the Hueco Bolson Aquifer to provide an additional reliable source of potable water for use by the City of El Paso and Fort Bliss. Pumping of fresh water by EPWU, Fort Bliss, Ciudad Ju[aacute]rez, and others has resulted in declining groundwater levels in the aquifer. In addition, brackish water is intruding into the aquifer's freshwater layer and has the potential to affect water wells on Fort Bliss and in other areas of El Paso. A sizable volume of brackish water exists adjacent to the freshwater zone of the Hueco Bolson Aquifer. Desalination of the brackish water offers a way to extend the life of the freshwater aquifer as a source of potable water that is to the mutual benefit of Fort Bliss and the City of El Paso. The proposed desalination plant would reduce withdrawals of fresh water from the aquifer, extending its useful life and intercepting the flow of brackish water to wells that are operated by Fort Bliss. Both Fort Bliss and the City of El Paso have considered constructing desalination facilities to tap into this potential water source. The Army and EPWU believe that building a single desalination plant to provide potable water for both the installation and the city would be more efficient and cost effective than constructing separate desalination plants.
Performance Review Boards Membership
Notice is given of the additional names of members of a Performance Review Board for the Department of the Army.
Intent To Prepare a Joint Supplemental Environmental Impact Statement/Environmental Impact Report for the Hamilton Wetland Restoration Project Dredged Material Transfer Facility, Marin County, CA
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 as implemented by the Council on Environmental Quality regulations (40 CFR parts 1500-1508), the California Environmental Quality Act (CEQA), and Public Law 102-484 section 2834, as amended by Public Law 104-106 section 2867, the Department of the Army and the California State Coastal Conservancy (SCC) hereby give notice of intent to prepare a joint Supplemental Environmental Impact Statement/Environmental Impact Report (SEIS/EIR) for the Hamilton Wetland Restoration Project (HWRP), Marin County, California to consider alternative methods to transfer dredged material collected from various navigational dredging projects within San Francisco Bay to the HWRP site for beneficial re-use in the construction of tidal and seasonal wetlands. The U.S. Army Corps of Engineers (Corps) is the lead agency for this project under NEPA. The SCC is the lead agency for this project under CEQA. A pubic scoping meeting will be held to solicit comments on the environmental scope of the project and the appropriate scope of the SEIS/EIR.
Chief of Engineers Environmental Advisory Board; Meeting
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. The meeting is open to the public. Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Date: February 2, 2005. Location: Embassy Suites Hotel Alexandria-Old Town, 1900 Diagonal Road, Alexandria, Virginia 22314, (703) 684-5900. Time: 9 a.m. to 12 p.m.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209 and 37 CFR 404.7(a)(1)(i), announcement is made of the intent to grant an exclusive, royalty- bearing, revocable license within the geographic area of the United States of America and its territories and possessions to U.S. Provisional Patent S.N. 60/533,375, filed December 24, 2003, entitled ``Identification of Small Molecules of Inhibitors of Anthrax Factor,'' to Microbiotix, Inc. with its principal place of business at 1 Innovation Drive, STE 15, Worcester, Massachusetts 01605-4332.
Advisory Committee Meeting
In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following meeting:
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.