Rescission of Draft Environmental Impact Statement for Proposed Dam Powerhouse Rehabilitations and Possible Operational Changes at the Wolf Creek, Center Hill, and Dale Hollow Dams, Kentucky and Tennessee, 21666-21667 [E9-10731]
Download as PDF
21666
Federal Register / Vol. 74, No. 88 / Friday, May 8, 2009 / Notices
Wadsworth Blvd., Littleton, CO 80128–
6901; (303) 979–4120;
mcrg.eis@usace.army.mil.
SUPPLEMENTARY INFORMATION:
None.
Timothy T. Carey,
Chief, Denver Regulatory Office.
[FR Doc. E9–10734 Filed 5–7–09; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Board on Coastal Engineering
Research
Department of the Army, DoD.
Notice of meeting.
AGENCY:
hsrobinson on PROD1PC76 with NOTICES
ACTION:
SUMMARY: In accordance with Section
10(a)(2) of the Federal Advisory
Committee Act (Pub. L. 92–463),
announcement is made of the following
committee meeting:
Name of Committee: Board on Coastal
Engineering Research.
Date of Meeting: June 3–4, 2009.
Place: Douglas Pavilion A Ballroom,
Manchester Grand Hyatt San Diego, One
Market Place, San Diego, CA 92101.
Time: 8 a.m. to 5:15 p.m. (June 3,
2009); 8 a.m. to 5 p.m. (June 4, 2009).
FOR FURTHER INFORMATION CONTACT:
Inquiries and notice of intent to attend
the meeting may be addressed to COL
Gary E. Johnston, Executive Secretary,
U.S. Army Engineer Research and
Development Center, Waterways
Experiment Station, 3909 Halls Ferry
Road, Vicksburg, MS 39180–6199.
SUPPLEMENTARY INFORMATION:
The Board provides broad policy
guidance and review of plans and fund
requirements for the conduct of research
and development of research projects in
consonance with the needs of the
coastal engineering field and the
objectives of the Chief of Engineers.
Proposed Agenda: The goal of the
meeting is to examine data needs to
enable systems-scale decision making
for coastal projects and management.
Presentations on Wednesday morning,
June 3, will consist of Coastal Working
Group Meeting Report; Introduction—
Overall Vision of Corps as Data
Developers and Users; Flood and
Coastal—Data Requirements for Coastal
Project Planning, Engineering,
Construction, and Operations;
Emergency Management—Forecasting
Hurricane Gustav, from Numerical
Models to -time Data; Navigation—Data
Requirements for Coastal Navigation
Project Planning, Engineering,
Construction, and Operations; Coastal,
VerDate Nov<24>2008
17:51 May 07, 2009
Jkt 217001
Navigation, and Emergency Response
Data Use; Gulf of Mexico Alliance
(GOMA)—Multi-state Data
Requirements; and National Oceanic
and Atmospheric Administration’s
(NOAA’s) Digital Coast. The afternoon
presentations will include Data to
Support Climate Change Studies; Impact
of Data on Marine Transportation
System Including Management of
Threatened and Endangered Species;
National Plan on Ocean and Coastal
Mapping (OCM)—Long-term Plans/
Direction for OCM; Future of Integrated
Ocean Observing System (IOOS)—Longterm Plans/Directions for IOOS; Future
Coast—Organized and Sustainable or
Chaotic and Dying?—Data Needed to
Quantify Conditions and Monitor
Change; and Challenges in Future
Requirements and Directions: The Way
Ahead.
The presentations on Thursday, June
4, 2009, include National Perspective on
Gaps in Coastal Data; California
Sediment Management—Goals,
Relationships, Data Needs; Technical
Tools for Regional Sediment
Management; Regional Sediment
Management Plan Development
throughout California, Highlighting the
San Diego Region; USGS Data Collection
Activities in California; San Francisco
District Costal Activities and Coastal
Watershed Demonstration at Santa Cruz
Harbor; and Los Angeles District
Activities and Data Utilization.
Thursday afternoon, June 4, is
devoted to a bus field trip for general
attendees and the Board Executive
Session to discuss ongoing initiatives
and actions.
These meetings are open to the
public. Participation by the public is
scheduled for 12 p.m. on Thursday,
June 4.
The entire meeting and field trip are
open to the public, but since seating
capacity is limited, advance notice of
attendance is required. Oral
participation by public attendees is
encouraged during the time scheduled
on the agenda; written statements may
be submitted prior to the meeting or up
to 30 days after the meeting.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. E9–10736 Filed 5–7–09; 8:45 am]
Office of the Secretary
Defense Intelligence Agency National
Defense Intelligence College Board of
Visitors Closed Meeting
AGENCY: Department of Defense, Defense
Intelligence Agency, National Defense
Intelligence College.
ACTION: Notice of closed meeting.
SUMMARY: Pursuant to the provisions of
subsection (d) of section 10 of Public
Law 92–463, as amended by section 5 of
Public Law 94–409, notice is hereby
given that a closed meeting of the
Defense Intelligence Agency National
Defense Intelligence College Board of
Visitors has been scheduled as follows:
DATES: Tuesday, June 2, 2009 (8 a.m. to
5 p.m.) and Wednesday, June 3, 2009 (8
a.m. to 12 p.m.).
ADDRESSES: National Defense
Intelligence College, Washington, DC
20340–5100.
FOR FURTHER INFORMATION CONTACT: Mr.
A. Denis Clift, President, DIA National
Defense Intelligence College,
Washington, DC 20340–5100 (202/231–
3344).
SUPPLEMENTARY INFORMATION: The entire
meeting is devoted to the discussion of
classified information as defined in
section 552b (c) (1), Title 5 of the U.S.
Code and therefore will be closed. The
Board will discuss several current
critical intelligence issues and advise
the Director, DIA, as to the successful
accomplishment of the mission assigned
to the National Defense Intelligence
College.
Dated: May 5, 2009.
Patricia L. Toppings,
OSD Federal Register, Liaison Officer,
Department of Defense.
[FR Doc. E9–10705 Filed 5–7–09; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Rescission of Draft Environmental
Impact Statement for Proposed Dam
Powerhouse Rehabilitations and
Possible Operational Changes at the
Wolf Creek, Center Hill, and Dale
Hollow Dams, Kentucky and
Tennessee
AGENCY: Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice.
BILLING CODE 3720–58–P
PO 00000
DEPARTMENT OF DEFENSE
SUMMARY: Pursuant to the National
Environmental Policy Act (NEPA), the
Frm 00048
Fmt 4703
Sfmt 4703
E:\FR\FM\08MYN1.SGM
08MYN1
hsrobinson on PROD1PC76 with NOTICES
Federal Register / Vol. 74, No. 88 / Friday, May 8, 2009 / Notices
U.S. Army Corps of Engineers (Corps),
Nashville District published its
intention to prepare a Draft
Environmental Impact Statement
relating to proposed dam powerhouse
rehabilitations and possible operational
changes at the Wolf Creek, Center Hill,
and Dale Hollow Dams in Kentucky and
Tennessee. Instead, the Corps has
decided to evaluate impacts associated
with Center Hill Dam powerhouse
rehabilitation with an Environmental
Assessment (EA). Separate EAs will also
be prepared for powerhouse
rehabilitations at Wolf Creek and Dale
Hollow Dams in the future. Each of
these rehabilitation projects are
unconnected stand-alone projects that
will occur at different times and in
different geographic areas.
ADDRESSES: Send written comments and
suggestions concerning this proposed
project to Chip Hall, U.S. Army Corps
of Engineers, Nashville District, P.O.
Box 1070, Nashville, TN 37202–1070.
Electronic mail: hydropower.rehab@
Lrn02.usace.army.miL. Requests to be
placed on the mailing list should also be
sent to this address.
FOR FURTHER INFORMATION CONTACT:
Chip Hall, Telephone: 615–736–7666.
SUPPLEMENTARY INFORMATION:
1. Background. The hydropower
major rehabilitation evaluation study for
Center Hill Dam was conducted under
the authorities of ER 1130–2.500,
December 27, 1996, Partners and
Support (Work Management Policies),
Chapter 3—Major Rehabilitation
Program; EP 1130–2.500, December 27,
1996, Partners and Support (Work
Management Policies), Chapter 3—
Major Rehabilitation Program; and EC
11–2–179, March 13, 2000, Corps of
Engineers Civil Works Directorate
Program, Program Development
Guidance, Fiscal Year 2000. Key
proposed project features or issues that
were evaluated in the DEIS included the
following:
a. Rehabilitation of turbines including
installation of Auto Venting Turbines to
improve dissolved oxygen (DO) levels in
the tailwaters.
b. Providing minimum releases to
ensure continuous flows between
periods of generation.
c. Evaluating the effects of increased
tailwater flows on downstream
resources, and changes to the hydraulics
and hydrology of the rivers.
d. Other alternatives to be studied
included: No Action; restoration to the
‘‘original’’ 1948 condition; refurbishing
existing units; oxygenating water in the
dam forebays prior to release; and
releasing water through the sluice gates.
VerDate Nov<24>2008
17:51 May 07, 2009
Jkt 217001
2. Public Participation. This study
was originally initiated in 2003, at
which time a Scoping Letter was issued
to all known interested individuals and
a Notice of Intent (NOI) was published
in the Federal Register on September
25, 2003 (68 FR 55376). Due to funding
constraints the study was stopped in
2004 before a Draft EIS could be
prepared. The study was reinitiated in
November 2007 and a second NOI
published in the Federal Register on
November 26, 2007 (72 FR 65950). A
Draft Environmental Impact Statement
(DEIS) was distributed to pertinent
federal and state agencies and a Notice
of Availability was placed in the
Federal Register in April 11, 2008 (73
FR 19834).
3. Changes during the Environmental
Review Process. Since the DEIS was
distributed to the public, it was
determined that turbine operations, post
proposed power plant rehabilitations,
would be subject to the existing Water
Control Manuals which govern how
each Dam and Reservoir Project and the
Cumberland System as a whole is
operated. The turbines would be
capable of discharging more water;
however, turbine gate settings will limit
discharges under non-spilling
operations to previously existing rates.
This significantly reduces the potential
impacts of the alternatives being
evaluated as flows during normal
hydropower generation would be
unchanged. However, during extreme
flood control situations, it is possible
that water that was previously spilled
from the project could be passed
through a turbine. At the onset of the
DEIS, potentially higher hydropower
discharge rates were being considered
for normal post-rehab operations. The
DEIS did not take this limitation on
flows into account.
It was also determined that because
Dale Hollow Dam did not have any
specific recommendations or proposals
for rehab, it is premature for it to have
been included with Center Hill and
Wolf Creek projects. Therefore, it was
determined that the DEIS should be
rescinded and that an Environmental
Assessment should be prepared to
determine any significant impacts
related to Center Hill Hydropower
Rehabilitation Project.
4. Schedule. It is anticipated that an
Environmental Assessment will be
prepared for the Center Hill
Hydropower Rehabilitation Project and
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
21667
will be available for Public Review by
June 2009.
Bernard R. Lindstrom,
Lieutenant Colonel, Corps of Engineers,
District Engineer.
[FR Doc. E9–10731 Filed 5–7–09; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF EDUCATION
Submission for OMB Review;
Comment Request
Department of Education
The Director, Information
Collection Clearance Division,
Regulatory Information Management
Services, Office of Management invites
comments on the submission for OMB
review as required by the Paperwork
Reduction Act of 1995.
DATES: Interested persons are invited to
submit comments on or before June 8,
2009.
ADDRESSES: Written comments should
be addressed to the Office of
Information and Regulatory Affairs,
Attention: Education Desk Officer,
Office of Management and Budget, 725
17th Street, NW., Room 10222, New
Executive Office Building, Washington,
DC 20503, be faxed to (202) 395–5806 or
send e-mail to
oira_submission@omb.eop.gov.
SUPPLEMENTARY INFORMATION: Section
3506 of the Paperwork Reduction Act of
1995 (44 U.S.C. Chapter 35) requires
that the Office of Management and
Budget (OMB) provide interested
Federal agencies and the public an early
opportunity to comment on information
collection requests. OMB may amend or
waive the requirement for public
consultation to the extent that public
participation in the approval process
would defeat the purpose of the
information collection, violate State or
Federal law, or substantially interfere
with any agency’s ability to perform its
statutory obligations. The Director,
Regulatory Information Management
Services, Office of Management,
publishes that notice containing
proposed information collection
requests prior to submission of these
requests to OMB. Each proposed
information collection, grouped by
office, contains the following: (1) Type
of review requested, e.g. new, revision,
extension, existing or reinstatement; (2)
Title; (3) Summary of the collection; (4)
Description of the need for, and
proposed use of, the information; (5)
Respondents and frequency of
collection; and (6) Reporting and/or
Recordkeeping burden. OMB invites
public comment.
AGENCY:
SUMMARY:
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 74, Number 88 (Friday, May 8, 2009)]
[Notices]
[Pages 21666-21667]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10731]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Rescission of Draft Environmental Impact Statement for Proposed
Dam Powerhouse Rehabilitations and Possible Operational Changes at the
Wolf Creek, Center Hill, and Dale Hollow Dams, Kentucky and Tennessee
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), the
[[Page 21667]]
U.S. Army Corps of Engineers (Corps), Nashville District published its
intention to prepare a Draft Environmental Impact Statement relating to
proposed dam powerhouse rehabilitations and possible operational
changes at the Wolf Creek, Center Hill, and Dale Hollow Dams in
Kentucky and Tennessee. Instead, the Corps has decided to evaluate
impacts associated with Center Hill Dam powerhouse rehabilitation with
an Environmental Assessment (EA). Separate EAs will also be prepared
for powerhouse rehabilitations at Wolf Creek and Dale Hollow Dams in
the future. Each of these rehabilitation projects are unconnected
stand-alone projects that will occur at different times and in
different geographic areas.
ADDRESSES: Send written comments and suggestions concerning this
proposed project to Chip Hall, U.S. Army Corps of Engineers, Nashville
District, P.O. Box 1070, Nashville, TN 37202-1070. Electronic mail:
hydropower.rehab@Lrn02.usace.army.miL. Requests to be placed on the
mailing list should also be sent to this address.
FOR FURTHER INFORMATION CONTACT: Chip Hall, Telephone: 615-736-7666.
SUPPLEMENTARY INFORMATION:
1. Background. The hydropower major rehabilitation evaluation study
for Center Hill Dam was conducted under the authorities of ER 1130-
2.500, December 27, 1996, Partners and Support (Work Management
Policies), Chapter 3--Major Rehabilitation Program; EP 1130-2.500,
December 27, 1996, Partners and Support (Work Management Policies),
Chapter 3--Major Rehabilitation Program; and EC 11-2-179, March 13,
2000, Corps of Engineers Civil Works Directorate Program, Program
Development Guidance, Fiscal Year 2000. Key proposed project features
or issues that were evaluated in the DEIS included the following:
a. Rehabilitation of turbines including installation of Auto
Venting Turbines to improve dissolved oxygen (DO) levels in the
tailwaters.
b. Providing minimum releases to ensure continuous flows between
periods of generation.
c. Evaluating the effects of increased tailwater flows on
downstream resources, and changes to the hydraulics and hydrology of
the rivers.
d. Other alternatives to be studied included: No Action;
restoration to the ``original'' 1948 condition; refurbishing existing
units; oxygenating water in the dam forebays prior to release; and
releasing water through the sluice gates.
2. Public Participation. This study was originally initiated in
2003, at which time a Scoping Letter was issued to all known interested
individuals and a Notice of Intent (NOI) was published in the Federal
Register on September 25, 2003 (68 FR 55376). Due to funding
constraints the study was stopped in 2004 before a Draft EIS could be
prepared. The study was reinitiated in November 2007 and a second NOI
published in the Federal Register on November 26, 2007 (72 FR 65950). A
Draft Environmental Impact Statement (DEIS) was distributed to
pertinent federal and state agencies and a Notice of Availability was
placed in the Federal Register in April 11, 2008 (73 FR 19834).
3. Changes during the Environmental Review Process. Since the DEIS
was distributed to the public, it was determined that turbine
operations, post proposed power plant rehabilitations, would be subject
to the existing Water Control Manuals which govern how each Dam and
Reservoir Project and the Cumberland System as a whole is operated. The
turbines would be capable of discharging more water; however, turbine
gate settings will limit discharges under non-spilling operations to
previously existing rates. This significantly reduces the potential
impacts of the alternatives being evaluated as flows during normal
hydropower generation would be unchanged. However, during extreme flood
control situations, it is possible that water that was previously
spilled from the project could be passed through a turbine. At the
onset of the DEIS, potentially higher hydropower discharge rates were
being considered for normal post-rehab operations. The DEIS did not
take this limitation on flows into account.
It was also determined that because Dale Hollow Dam did not have
any specific recommendations or proposals for rehab, it is premature
for it to have been included with Center Hill and Wolf Creek projects.
Therefore, it was determined that the DEIS should be rescinded and that
an Environmental Assessment should be prepared to determine any
significant impacts related to Center Hill Hydropower Rehabilitation
Project.
4. Schedule. It is anticipated that an Environmental Assessment
will be prepared for the Center Hill Hydropower Rehabilitation Project
and will be available for Public Review by June 2009.
Bernard R. Lindstrom,
Lieutenant Colonel, Corps of Engineers, District Engineer.
[FR Doc. E9-10731 Filed 5-7-09; 8:45 am]