Instructions for Completing NRC's Uniform Low-Level Radioactive Waste Manifest
Document Number: 2020-21625
Type: Rule
Date: 2020-09-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) published NUREG/ BR-0204, Revision 3, ``Instructions for Completing NRC's Uniform Low- Level Radioactive Waste Manifest,'' in June 2020. This document provides instructions to prepare NRC Form 540 (Uniform Low-Level Radioactive Waste Manifest (Shipping Paper)), NRC Form 541 (Uniform Low-Level Radioactive Waste Manifest (Container and Waste Description)), and NRC Form 542 (Uniform Low-Level Radioactive Waste Manifest (Manifest Index and Regional Compact Tabulation)). Use of NUREG/BR-0204, Revision 3 has been delayed. Until further notice, licensees should continue to use NUREG/BR-0204, Revision 2 and the versions of NRC Forms 540, 541 and 542 that were renewed in January 2020, or equivalent, as defined in NRC's regulations.
In The Matter of Joseph Shea; Establishment of Atomic Safety and Licensing Board
Document Number: 2020-21578
Type: Notice
Date: 2020-09-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Act Meetings
Document Number: 2020-21627
Type: Notice
Date: 2020-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Energy Harbor Nuclear Corp.; Energy Harbor Nuclear Generation LLC; Perry Nuclear Power Plant, Unit No. 1
Document Number: 2020-21513
Type: Notice
Date: 2020-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering the issuance of an amendment to Facility Operating License No. NPF-58, issued to Energy Harbor Nuclear Corp. (EHNC) and Energy Harbor Nuclear Generation LLC, for operation of the Perry Nuclear Power Plant, Unit No. 1 (PNPP), located near Lake Erie in Lake County, Ohio. The proposed action would amend the expiration of Facility Operating License No. NPF-58 from March 18, 2026, to November 7, 2026. Specifically, the expiration date of PNPP's full-power operating license (FPOL) would be revised such that it would expire 40 years from the date of issuance of the FPOL, as is permitted by the NRC's regulations.
NuScale Power, LLC; NuScale Small Modular Reactor
Document Number: 2020-21429
Type: Notice
Date: 2020-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued a standard design approval (SDA) to NuScale Power, LLC (NuScale) for the NuScale small modular reactor (SMR) standard design. The SDA allows the NuScale SMR standard design to be referenced in an application for a construction permit or operating license, or an application for a combined license or manufacturing license under its regulations.
Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency
Document Number: 2020-21382
Type: Notice
Date: 2020-09-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) issued 15 exemptions in response to requests from 7 licensees. The exemptions afford these licensees temporary relief from certain requirements under NRC regulations. The exemptions are in response to the licensees' requests for relief due to the coronavirus disease 2019 (COVID-19) public health emergency (PHE). The NRC is issuing a single notice to announce the issuance of the exemptions.
Guidance: Changes, Tests, and Experiments
Document Number: 2020-21299
Type: Rule
Date: 2020-09-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 3.72, ``Guidance for Implementation of Changes, Tests, and Experiements.'' Revision 1 to RG 3.72 endorses Nuclear Energy Institute (NEI) 12-04, Revision 2. NEI 12-04, Revision 2, updates and revises previous guidance to incorporate operating experience and NRC's inspection findings. In addition, RG 3.72, Revision 1, changes the NRC's guidance on departures from a method of evaluation (MOE) and the NRC's approval of an MOE.
679th Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2020-21231
Type: Notice
Date: 2020-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors; Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling Water Reactors
Document Number: 2020-21197
Type: Notice
Date: 2020-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing NUREG- 1122, Revision 3, ``Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors,'' and NUREG-1123, Revision 3, ``Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling Water Reactors.''
Information Collection: Comprehensive Decommissioning Program Annual Site List and Point of Contact
Document Number: 2020-21067
Type: Notice
Date: 2020-09-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a proposed collection of information to the Office of Management and Budget for review. The information collection is entitled, ``Comprehensive Decommissioning Program Annual Site List and Point of Contact.''
Interim Storage Partners Consolidated Interim Storage Facility Project
Document Number: 2020-20964
Type: Notice
Date: 2020-09-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On May 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register a notice issuing the draft Environmental Impact Statement (EIS) for Interim Storage Partners LLC's (ISP's) license application to construct and operate a consolidated interim storage facility (CISF) for spent nuclear fuel and Greater-Than Class C waste, along with a small quantity of mixed oxide fuel for public comment. The NRC is announcing four public comment webinars to receive oral comments on the draft EIS. The meetings will allow interested members of the public to submit their comments.
Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Units 1 and 2
Document Number: 2020-20858
Type: Notice
Date: 2020-09-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of exemptions that would permit the licensee to reduce its emergency planning (EP) activities at Three Mile Island Nuclear Station, Unit 1 (TMI-1) and Unit 2 (TMI-2). Specifically, the licensee is seeking exemptions that would eliminate the requirements for the licensee to maintain offsite radiological emergency plans and reduce some of the onsite EP activities based on the reduced risks at TMI-1, which is permanently shut down and defueled, and at TMl-2, which has a possession-only license. However, requirements for certain onsite capabilities to communicate and coordinate with offsite response authorities would be retained. In addition, offsite EP provisions would still exist through State and local government use of a comprehensive emergency management plan process, in accordance with the Federal Emergency Management Agency's (FEMA's) Comprehensive Preparedness Guide (CPG) 101, ``Developing and Maintaining Emergency Operations Plans.'' The NRC staff is issuing a final Environmental Assessment (EA) and final Finding of No Significant Impact (FONSI) associated with the proposed exemptions.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2020-20720
Type: Notice
Date: 2020-09-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to section 189.a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all amendments issued, or proposed to be issued, from August 25, 2020, to September 7, 2020. The last biweekly notice was published on September 8, 2020.
List of Approved Spent Fuel Storage Casks: NAC International, Inc. MAGNASTOR® Storage System, Certificate of Compliance No. 1031, Amendment No. 9
Document Number: 2020-20667
Type: Proposed Rule
Date: 2020-09-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations by revising the NAC International, Inc. MAGNASTOR[supreg] Storage System listing within the ``List of approved spent fuel storage casks'' to include Amendment No. 9 to Certificate of Compliance No. 1031. Amendment No. 9 revises the certificate of compliance to add a new concrete storage overpack; four new heat load zone patterns and their associated decay heats that are specific to Babcock and Wilcox 15x15 fuel assemblies; a new Babcock & Wilcox 15x15 hybrid fuel assembly type (BW15H5); and a new maximum enrichment for the BW15H2 hybrid fuel assembly, including a new minimum soluble boron concentration during loading and unloading operations and neutron absorber areal density. In addition, Amendment No. 9 makes non- technical changes to reorganize Appendix B of the technical specifications.
List of Approved Spent Fuel Storage Casks: NAC International, Inc. MAGNASTOR® Storage System, Certificate of Compliance No. 1031, Amendment No. 9
Document Number: 2020-20666
Type: Rule
Date: 2020-09-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is amending its spent fuel storage regulations by revising the NAC International, Inc. MAGNASTOR[supreg] Storage System listing within the ``List of approved spent fuel storage casks'' to include Amendment No. 9 to Certificate of Compliance No. 1031. Amendment No. 9 revises the certificate of compliance to add a new concrete storage overpack; four new heat load zone patterns and their associated decay heats that are specific to Babcock and Wilcox 15x15 fuel assemblies; a new Babcock & Wilcox 15x15 hybrid fuel assembly type (BW15H5); and a new maximum enrichment for the BW15H2 hybrid fuel assembly, including a new minimum soluble boron concentration during loading and unloading operations and neutron absorber areal density. In addition, Amendment No. 9 makes non- technical changes to reorganize Appendix B of the technical specifications. These changes are discussed in more detail in the ``Discussion of Changes'' section of this direct final rule.
Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2
Document Number: 2020-20682
Type: Notice
Date: 2020-09-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has received an application for the subsequent renewal of Renewed Facility Operating License Nos. NPF-4 and NPF-7, which authorize Virginia Electric and Power Company (Dominion or the applicant) to operate North Anna Power Station, Units 1 and 2 (North Anna). The subsequent renewed licenses would authorize the applicant to operate North Anna for an additional 20 years beyond the period specified in each of the current renewed licenses. The current renewed operating licenses for North Anna expire as follows: Unit 1 on April 1, 2038, and Unit 2 on August 21, 2040.
Columbia Generating Station; Issuance of License Amendment Revising Technical Specification 3.8.7
Document Number: 2020-20442
Type: Notice
Date: 2020-09-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) approved a request by Energy Northwest (the licensee) for an amendment to Renewed Facility Operating License No. NPF-21, issued to the licensee for operation of the Columbia Generating Station, located in Benton County, Washington. The amendment adds a one-time extension to the completion time of Technical Specification (TS) 3.8.7, ``Distribution Systems Operating,'' Condition A, from 8 hours to 16 hours, specifically associated with Division 2 alternating current electrical power distribution inoperability caused by inoperability of 120/240-volt power panel E-PP-8AE during repairs on its supply transformer E-TR-8A/ 1.
EnergySolutions Services, Inc.
Document Number: 2020-20418
Type: Notice
Date: 2020-09-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering an application (XW018/02) from EnergySolutions Services, Inc. (ESSI) to amend and renew an existing export license authorizing the export of radioactive waste to Germany. The NRC is providing notice of the opportunity to submit written comments, request a hearing, or a petition for leave to intervene on ESSI's application.
Perma-Fix Northwest Richland, Inc.
Document Number: 2020-20417
Type: Notice
Date: 2020-09-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering issuing an export license (XW027), received from Perma-Fix Northwest Richland, Inc. (PFNW). The request seeks the NRC's approval for an existing license authorizing the export of radioactive waste to Germany. The NRC is providing notice of the opportunity to comment, request a hearing, and petition to intervene on PFNW's application.
Sunshine Act Meetings
Document Number: 2020-20352
Type: Notice
Date: 2020-09-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Reporting Nuclear Medicine Injection Extravasations as Medical Events
Document Number: 2020-19903
Type: Proposed Rule
Date: 2020-09-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has received a petition for rulemaking from Ronald K. Lattanze on behalf of Lucerno Dynamics, LLC, dated May 18, 2020. The petitioner requests that the NRC revise its regulations to require reporting of certain nuclear medicine injection extravasations as medical events. The NRC docketed the petition on June 5, 2020, and assigned it Docket No. PRM-35-22. The NRC is examining the issues raised in PRM-35-22 to determine whether they should be considered in rulemaking. The NRC is requesting public comment on this petition at this time.
Information Collection: DOE/NRC Form 740M, Concise Note; DOE/NRC Form 741, Nuclear Material Transaction Report; DOE/NRC Form 742, Material Balance Report; and DOE/NRC Form 742C, Physical Inventory Listing
Document Number: 2020-20138
Type: Notice
Date: 2020-09-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collections are entitled, ``DOE/NRC Form 740M, Concise Note; DOE/NRC Form 741, Nuclear Material Transaction Report; DOE/NRC Form 742, Material Balance Report; and DOE/NRC Form 742C, Physical Inventory Listing.''
Physical Security for Advanced Reactors
Document Number: 2020-19907
Type: Proposed Rule
Date: 2020-09-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is making preliminary proposed rule language for the Alternative Physical Security Requirements for Advanced Reactors rulemaking available to the public. The NRC is not requesting public comment at this time; however, the public will have an opportunity to provide comment when the proposed rule is published in the future.
Development of NRC's Strategic Plan for Fiscal Years 2022 Through 2026
Document Number: 2020-20048
Type: Notice
Date: 2020-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is requesting comments on its update of the NRC's Fiscal Years (FYs) 2022-2026 Strategic Plan. Specifically, the NRC would like input on the agency's strategic goals, actions to realize those goals, and how to address key challenges and external factors as described in the current agency's Strategic Plan, NUREG 1614, Volume 7, ``Strategic Plan Fiscal Years 2018-2022.'' The information will be used to inform the development of the NRC's FYs 2022-2026 Strategic Plan framework and evidence building and evaluation activities.
Information Collection: Solicitation of Non-Power Reactor Operator Licensing Examination Data
Document Number: 2020-20044
Type: Notice
Date: 2020-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``Solicitation of Non-Power Reactor Operator Licensing Examination Data.''
Information Collection: Part 20 Respirator Protection Exemption Request for Non-Power Reactors/RTR And Part 20 Respirator Protection Exemption Request for Power Reactors Online Forms
Document Number: 2020-20043
Type: Notice
Date: 2020-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``Part 20 Respirator Protection Exemption Request for Non-Power Reactors/RTR And Part 20 Respirator Protection Exemption Request for Power Reactors Online Forms.''
Information Collection: Collection of Operator Simulator Training Data
Document Number: 2020-20042
Type: Notice
Date: 2020-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``Collection of Operator Simulator Training Data.''
Intent and Scope of the Physical Protection Upgrade Rule Requirements for Fixed Sites
Document Number: 2020-19713
Type: Notice
Date: 2020-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing Regulatory Guide (RG) 5.61, ``Intent and Scope of the Physical Protection Upgrade Rule Requirements for Fixed Sites.'' This document is being withdrawn because the information in RG 5.61 is no longer needed. The reasons for the withdrawal are described in more detail under the ``Background'' Section of this document.
Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2
Document Number: 2020-19937
Type: Notice
Date: 2020-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License Nos. NPF-72 and NPF-77 that were issued to Exelon Generation Company, LLC, (licensee) for operation of the Braidwood Station, Units 1 and 2. The proposed amendment is contained in the licensee's letter dated July 15, 2020, as supplemented by letter dated August 14, 2020, and would change technical specifications (TS) surveillance requirement (SR) 3.7.9.2 to allow an ultimate heat sink (UHS) temperature of less than or equal to 102.8 degrees Fahrenheit ([deg]F) until September 30, 2020. The proposed amendment would also permanently extend the completion time for the Required Action of both Braidwood Station, Units 1 and 2, to be placed in Mode 3 within 12 hours when the UHS is inoperable due to the average water temperature.
Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2
Document Number: 2020-19899
Type: Notice
Date: 2020-09-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) approved a request by Pacific Gas and Electric Company (PG&E, the licensee) for amendments to Facility Operating License Nos. DPR-80 and DPR-82, issued to the licensee for operation of the Diablo Canyon Nuclear Power Plant (Diablo Canyon), Units 1 and 2, located in San Luis Obispo County, California. The amendments provide a new Technical Specification (TS) 3.7.5, ``Auxiliary Feedwater (AFW) System,'' Condition G, to address a one-time planned Diablo Canyon, Unit 1, Cycle 22, AFW system alignment for which current TS 3.7.5 would require shutdown.
Sunshine Act Meetings
Document Number: 2020-19940
Type: Notice
Date: 2020-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Fresh and Spent Fuel Pool Criticality Analyses
Document Number: 2020-19774
Type: Notice
Date: 2020-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1373, ``Fresh and Spent Fuel Pool Criticality Analyses.'' This draft guide, if finalized as a new regulatory guide (RG), would update and supersede Interim Staff Guidance DSS-ISG-2010-01, ``Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools.'' This draft guide describes an approach that the NRC staff considers acceptable to demonstrate that NRC regulatory requirements are met for subcriticality of fuel assemblies stored in fresh fuel vaults and spent fuel pools at light-water reactor power plants. It endorses, with clarifications and exceptions, the Nuclear Energy Institute (NEI) guidance document NEI 12-16, ``Guidance for Performing Criticality Analyses of Fuel Storage at Light-Water Reactor Power Plants,'' Revision 4.
Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2; Braidwood Station, Units 1 and 2
Document Number: 2020-19752
Type: Notice
Date: 2020-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a September 30, 2019, request from Exelon Generation Company, LLC (Exelon) from regulatory requirements to allow Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2, to use an alternative methodology for determining reactor coolant system pressure-temperature limits. The methodology is described in AREVA NP Topical Report BAW-2308, Revisions 1-A and 2-A, ``Initial RTNDT of Linde 80 Weld Materials.''
In the Matter of LaCrosse Solutions, LLC; La Crosse Boiling Water Reactor
Document Number: 2020-19736
Type: Notice
Date: 2020-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an Order to extend the effectiveness of a September 24, 2019, Order, which approved the direct transfer of Possession Only License No. DPR-45 for the La Crosse Boiling Water Reactor (LACBWR) from the current holder, LaCrosseSolutions, LLC, to Dairyland Power Cooperative and approved a conforming license amendment, for six months beyond its current September 24, 2020, expiration date.
EnergySolutions Services, Inc.
Document Number: 2020-19734
Type: Notice
Date: 2020-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) received and is considering issuing an export license (XW026) requested by EnergySolutions Services Inc. (ESSI). On July 27, 2020, ESSI filed an application with the NRC for a license to export low-level radioactive waste to Mexico. The NRC is providing notice of the opportunity to comment, request a hearing, and petition to intervene on ESSI's application.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving no Significant Hazards Considerations
Document Number: 2020-19416
Type: Notice
Date: 2020-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to section 189.a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all amendments issued, or proposed to be issued, from August 11, 2020, to August 24, 2020. The last biweekly notice was published on August 25, 2020.
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
Document Number: 2020-18085
Type: Notice
Date: 2020-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of two amendment requests. The amendment requests are for Oconee Nuclear Station, Units 1, 2, and 3 and Beaver Valley Power Station, Unit 2. For each amendment request, the NRC proposes to determine that they involve no significant hazards consideration. Because each amendment request contains sensitive unclassified non- safeguards information (SUNSI) an order imposes procedures to obtain access to SUNSI for contention preparation.
In the Matter of Exelon Generation Company, LLC; Three Mile Island Generating Station, Unit 1; Independent Spent Fuel Storage Installation
Document Number: 2020-19573
Type: Notice
Date: 2020-09-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued a general license to the Exelon Generation Company, LLC (Exelon), authorizing the operation of the Three Mile Island Generating Station Independent Spent Fuel Storage Installation (ISFSI), in accordance with its regulations. The Order is being issued to Exelon to impose additional security requirements because Exelon has identified near- term plans to store spent fuel in an ISFSI under the general license provisions of the NRC's regulations. The Order was issued August 27, 2020 and became effective immediately.
Information Collection: COVID-19 Work Hour Controls Exemption Request Form
Document Number: 2020-19461
Type: Notice
Date: 2020-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``COVID-19 Work Hour Controls Exemption Request Form.''
Information Collection: NRC Form 149, “OCFO Invitational Traveler Request Form”
Document Number: 2020-19459
Type: Notice
Date: 2020-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on this proposed collection of information. The information collection is entitled, NRC Form 149, ``OCFO Invitational Traveler Request Form.''
Information Collection: Part 55 Exemption Request and Part 55 Research and Test Reactor Exemption Request
Document Number: 2020-19457
Type: Notice
Date: 2020-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``Part 55 Exemption Request and Part 55 Research and Test Reactor Exemption Request.''
List of Approved Spent Fuel Storage Casks: TN Americas LLC, Standardized NUHOMS® Horizontal Modular Storage System, Certificate of Compliance No. 1004, Renewed Amendment No. 16
Document Number: 2020-19028
Type: Rule
Date: 2020-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is confirming the effective date of September 14, 2020, for the direct final rule that was published in the Federal Register on June 30, 2020. The direct final rule amends the spent fuel storage regulations by revising the TN Americas LLC, Standardized NUHOMS[supreg] Horizontal Modular Storage System listing within the ``List of approved spent fuel storage casks'' to include Renewed Amendment No. 16 to Certificate of Compliance No. 1004.
Revised 678th Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2020-19408
Type: Notice
Date: 2020-09-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Energy Solutions Services, Inc.
Document Number: 2020-19404
Type: Notice
Date: 2020-09-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering an application (XW010/04) from EnergySolutions Services, Inc. (ESSI) to amend and renew an existing license authorizing the export of radioactive waste to Canada. The NRC is providing notice of the opportunity to submit written comments, request a hearing, or a petition for leave to intervene on ESSI's application.
Sunshine Act Meetings
Document Number: 2020-19367
Type: Notice
Date: 2020-09-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions