Fresh and Spent Fuel Pool Criticality Analyses, 55522-55523 [2020-19774]

Download as PDF 55522 Federal Register / Vol. 85, No. 174 / Tuesday, September 8, 2020 / Notices distribution, please contact the Nuclear Regulatory Commission, Office of the Secretary, Washington, DC 20555 (301– 415–1969), or by email at Wendy.Moore@nrc.gov or Tyesha.Bush@ nrc.gov. The NRC is holding the meetings under the authority of the Government in the Sunshine Act, 5 U.S.C. 552b. Dated: September 3, 2020. For the Nuclear Regulatory Commission. Denise L. McGovern Policy Coordinator, Office of the Secretary. [FR Doc. 2020–19940 Filed 9–3–20; 4:15 pm] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2020–0203] Fresh and Spent Fuel Pool Criticality Analyses Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG–1373, ‘‘Fresh and Spent Fuel Pool Criticality Analyses.’’ This draft guide, if finalized as a new regulatory guide (RG), would update and supersede Interim Staff Guidance DSS–ISG–2010– 01, ‘‘Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools.’’ This draft guide describes an approach that the NRC staff considers acceptable to demonstrate that NRC regulatory requirements are met for subcriticality of fuel assemblies stored in fresh fuel vaults and spent fuel pools at light-water reactor power plants. It endorses, with clarifications and exceptions, the Nuclear Energy Institute (NEI) guidance document NEI 12–16, ‘‘Guidance for Performing Criticality Analyses of Fuel Storage at Light-Water Reactor Power Plants,’’ Revision 4. DATES: Submit comments by October 23, 2020. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time. ADDRESSES: You may submit comments by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search jbell on DSKJLSW7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 16:32 Sep 04, 2020 Jkt 250001 for Docket ID NRC–2020–0203. Address questions about Docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individuals listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: Office of Administration, Mail Stop: TWFN–7– A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, ATTN: Program Management, Announcements and Editing Staff. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: Kent Wood, Office of Nuclear Reactor Regulation, telephone: 301–415–4120, email: Kent.Wood@nrc.gov, and Michael Eudy, Office of Nuclear Regulatory Research, telephone: 301–415–3104, email: Michael.Eudy@nrc.gov. Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. SUPPLEMENTARY INFORMATION: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2020– 0203 when contacting the NRC about the availability of information for this action. You may obtain publiclyavailable information related to this action by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2020–0203. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. B. Submitting Comments Please include Docket ID NRC–2020– 0203 in your comment submission. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https:// www.regulations.gov as well as enter the PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Additional Information The NRC is issuing for public comment a draft guide in the NRC’s ‘‘Regulatory Guide’’ series. This series was developed to describe methods that are acceptable to the NRC staff for implementing specific parts of the agency’s regulations, to explain techniques that the staff uses in evaluating specific issues or postulated events, and to describe information that the staff needs in its review of applications for permits and licenses. The DG, titled ‘‘Fresh and Spent Fuel Pool Criticality Analyses,’’ is a proposed new RG temporarily identified by its task number, DG–1373 (ADAMS Accession No. ML20182A788). It endorses, with clarifications and exceptions, the NEI guidance document NEI 12–16, Revision 4, (ADAMS Accession No. ML19269E069). This DG proposes guidance to meet regulatory requirements for subcriticality of fuel assemblies stored in fresh fuel vaults and spent fuel pools at light-water reactor power plants. This DG provides clarity and consistency regarding the necessary scope of efforts for applicants and licensees to demonstrate compliance with the requirements for performing criticality analyses of fuel storage at light-water reactor power plants under section 50.68(b) of title 10 of the Code of Federal Regulations (10 CFR). This DG applies to applicants and licensees subject to 10 CFR part 50, ‘‘Domestic Licensing of Production and Utilization Facilities,’’ or 10 CFR part 52, ‘‘Licenses, Certifications, and Approvals for Nuclear Power Plants.’’ In addition, this proposed new RG, if finalized, would update and supersede Interim Staff Guidance (ISG) DSS–ISG– 2010–01 (ADAMS Accession No. ML110620086). The ISG was issued in 2011 to support the staff’s review of methods for performing criticality analyses submitted to demonstrate compliance with 10 CFR 50.68(b). The staff would withdraw DSS–ISG–2010– E:\FR\FM\08SEN1.SGM 08SEN1 Federal Register / Vol. 85, No. 174 / Tuesday, September 8, 2020 / Notices 01 concurrently with the issuance of this new RG. Licensees using DSS–ISG– 2010–01 to demonstrate compliance with NRC requirements may continue using that guidance as long as they do not change their licensing bases relative to that guidance. The staff is also issuing for public comment a draft regulatory analysis (ADAMS Accession No. ML20205L563). The staff develops a regulatory analysis to assess the value of issuing or revising a regulatory guide as well as alternative courses of action. III. Backfitting, Forward Fitting, and Issue Finality DG–1373, if finalized, would provide guidance for performing criticality analyses of fuel storage at light-water reactor power plants. Issuance of DG– 1373, if finalized, would not constitute backfitting as defined in 10 CFR 50.109, ‘‘Backfitting,’’ and as described in NRC Management Directive 8.4, ‘‘Management of Backfitting, Forward Fitting, Issue Finality, and Information Requests,’’ (Ref. 18); affect issue finality of any approval issued under 10 CFR part 52; or constitute forward fitting as defined in Management Directive 8.4. As explained in DG–1373, licensees are not required to comply with the positions set forth in this guide. Dated: September 2, 2020. For the Nuclear Regulatory Commission. Meraj Rahimi, Chief, Regulatory Guidance and Generic Issues Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2020–19774 Filed 9–4–20; 8:45 am] BILLING CODE 7590–01–P POSTAL REGULATORY COMMISSION [Docket Nos. MC2020–235 and CP2020–265; MC2020–236 and CP2020–266] New Postal Products Postal Regulatory Commission. Notice. AGENCY: ACTION: The Commission is noticing a recent Postal Service filing for the Commission’s consideration concerning a negotiated service agreement. This notice informs the public of the filing, invites public comment, and takes other administrative steps. DATES: Comments are due: September 11, 2020. ADDRESSES: Submit comments electronically via the Commission’s Filing Online system at https:// www.prc.gov. Those who cannot submit comments electronically should contact the person identified in the FOR FURTHER jbell on DSKJLSW7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 16:32 Sep 04, 2020 Jkt 250001 section by telephone for advice on filing alternatives. INFORMATION CONTACT FOR FURTHER INFORMATION CONTACT: David A. Trissell, General Counsel, at 202–789–6820. SUPPLEMENTARY INFORMATION: Table of Contents I. Introduction II. Docketed Proceeding(s) I. Introduction The Commission gives notice that the Postal Service filed request(s) for the Commission to consider matters related to negotiated service agreement(s). The request(s) may propose the addition or removal of a negotiated service agreement from the market dominant or the competitive product list, or the modification of an existing product currently appearing on the market dominant or the competitive product list. Section II identifies the docket number(s) associated with each Postal Service request, the title of each Postal Service request, the request’s acceptance date, and the authority cited by the Postal Service for each request. For each request, the Commission appoints an officer of the Commission to represent the interests of the general public in the proceeding, pursuant to 39 U.S.C. 505 (Public Representative). Section II also establishes comment deadline(s) pertaining to each request. The public portions of the Postal Service’s request(s) can be accessed via the Commission’s website (https:// www.prc.gov). Non-public portions of the Postal Service’s request(s), if any, can be accessed through compliance with the requirements of 39 CFR 3011.301.1 The Commission invites comments on whether the Postal Service’s request(s) in the captioned docket(s) are consistent with the policies of title 39. For request(s) that the Postal Service states concern market dominant product(s), applicable statutory and regulatory requirements include 39 U.S.C. 3622, 39 U.S.C. 3642, 39 CFR part 3030, and 39 CFR part 3040, subpart B. For request(s) that the Postal Service states concern competitive product(s), applicable statutory and regulatory requirements include 39 U.S.C. 3632, 39 U.S.C. 3633, 39 U.S.C. 3642, 39 CFR part 3035, and 39 CFR part 3040, subpart B. Comment deadline(s) for each request appear in section II. 1 See Docket No. RM2018–3, Order Adopting Final Rules Relating to Non-Public Information, June 27, 2018, Attachment A at 19–22 (Order No. 4679). PO 00000 Frm 00116 Fmt 4703 Sfmt 4703 55523 II. Docketed Proceeding(s) 1. Docket No(s).: MC2020–235 and CP2020–265; Filing Title: USPS Request to Add Priority Mail Contract 654 to Competitive Product List and Notice of Filing Materials Under Seal; Filing Acceptance Date: September 1, 2020; Filing Authority: 39 U.S.C. 3642, 39 CFR 3040.130 through 3040.135, and 39 CFR 3035.105; Public Representative: Kenneth R. Moeller; Comments Due: September 11, 2020. 2. Docket No(s).: MC2020–236 and CP2020–266; Filing Title: USPS Request to Add Parcel Select & Parcel Return Service Contract 12 to Competitive Product List and Notice of Filing Materials Under Seal; Filing Acceptance Date: September 1, 2020; Filing Authority: 39 U.S.C. 3642, 39 CFR 3040.130 through 3040.135, and 39 CFR 3035.105; Public Representative: Christopher C. Mohr; Comments Due: September 11, 2020. This Notice will be published in the Federal Register. Erica A. Barker, Secretary. [FR Doc. 2020–19798 Filed 9–4–20; 8:45 am] BILLING CODE 7710–FW–P POSTAL SERVICE International Product Change—Priority Mail Express International, Priority Mail International, First-Class Package International Service & Commercial ePacket Agreement: Postal ServiceTM ACTION: Notice. The Postal Service gives notice of filing a request with the Postal Regulatory Commission to add a Priority Mail Express International, Priority Mail International, First-Class Package International Service & Commercial ePacket contract to the list of Negotiated Service Agreements in the Competitive Product List in the Mail Classification Schedule. DATES: Date of notice: September 8, 2020. FOR FURTHER INFORMATION CONTACT: Christopher C. Meyerson, (202) 268– 7820. SUPPLEMENTARY INFORMATION: The United States Postal Service® hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3), on August 31, 2020, it filed with the Postal Regulatory Commission a USPS Request to Add Priority Mail Express International, Priority Mail International, First-Class Package International Service & Commercial ePacket Contract 9 to SUMMARY: E:\FR\FM\08SEN1.SGM 08SEN1

Agencies

[Federal Register Volume 85, Number 174 (Tuesday, September 8, 2020)]
[Notices]
[Pages 55522-55523]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-19774]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2020-0203]


Fresh and Spent Fuel Pool Criticality Analyses

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft regulatory guide; request for comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for 
public comment draft regulatory guide (DG), DG-1373, ``Fresh and Spent 
Fuel Pool Criticality Analyses.'' This draft guide, if finalized as a 
new regulatory guide (RG), would update and supersede Interim Staff 
Guidance DSS-ISG-2010-01, ``Staff Guidance Regarding the Nuclear 
Criticality Safety Analysis for Spent Fuel Pools.'' This draft guide 
describes an approach that the NRC staff considers acceptable to 
demonstrate that NRC regulatory requirements are met for subcriticality 
of fuel assemblies stored in fresh fuel vaults and spent fuel pools at 
light-water reactor power plants. It endorses, with clarifications and 
exceptions, the Nuclear Energy Institute (NEI) guidance document NEI 
12-16, ``Guidance for Performing Criticality Analyses of Fuel Storage 
at Light-Water Reactor Power Plants,'' Revision 4.

DATES: Submit comments by October 23, 2020. Comments received after 
this date will be considered if it is practical to do so, but the NRC 
is able to ensure consideration only for comments received on or before 
this date. Although a time limit is given, comments and suggestions in 
connection with items for inclusion in guides currently being developed 
or improvements in all published guides are encouraged at any time.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0203. Address 
questions about Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individuals listed in the FOR FURTHER 
INFORMATION CONTACT section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Kent Wood, Office of Nuclear Reactor 
Regulation, telephone: 301-415-4120, email: [email protected], and 
Michael Eudy, Office of Nuclear Regulatory Research, telephone: 301-
415-3104, email: [email protected]. Both are staff of the U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2020-0203 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0203.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room reference staff at 1-800-397-4209, 301-415-4737, or by 
email to [email protected].

B. Submitting Comments

    Please include Docket ID NRC-2020-0203 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Additional Information

    The NRC is issuing for public comment a draft guide in the NRC's 
``Regulatory Guide'' series. This series was developed to describe 
methods that are acceptable to the NRC staff for implementing specific 
parts of the agency's regulations, to explain techniques that the staff 
uses in evaluating specific issues or postulated events, and to 
describe information that the staff needs in its review of applications 
for permits and licenses.
    The DG, titled ``Fresh and Spent Fuel Pool Criticality Analyses,'' 
is a proposed new RG temporarily identified by its task number, DG-1373 
(ADAMS Accession No. ML20182A788). It endorses, with clarifications and 
exceptions, the NEI guidance document NEI 12-16, Revision 4, (ADAMS 
Accession No. ML19269E069). This DG proposes guidance to meet 
regulatory requirements for subcriticality of fuel assemblies stored in 
fresh fuel vaults and spent fuel pools at light-water reactor power 
plants. This DG provides clarity and consistency regarding the 
necessary scope of efforts for applicants and licensees to demonstrate 
compliance with the requirements for performing criticality analyses of 
fuel storage at light-water reactor power plants under section 50.68(b) 
of title 10 of the Code of Federal Regulations (10 CFR). This DG 
applies to applicants and licensees subject to 10 CFR part 50, 
``Domestic Licensing of Production and Utilization Facilities,'' or 10 
CFR part 52, ``Licenses, Certifications, and Approvals for Nuclear 
Power Plants.''
    In addition, this proposed new RG, if finalized, would update and 
supersede Interim Staff Guidance (ISG) DSS-ISG-2010-01 (ADAMS Accession 
No. ML110620086). The ISG was issued in 2011 to support the staff's 
review of methods for performing criticality analyses submitted to 
demonstrate compliance with 10 CFR 50.68(b). The staff would withdraw 
DSS-ISG-2010-

[[Page 55523]]

01 concurrently with the issuance of this new RG. Licensees using DSS-
ISG-2010-01 to demonstrate compliance with NRC requirements may 
continue using that guidance as long as they do not change their 
licensing bases relative to that guidance.
    The staff is also issuing for public comment a draft regulatory 
analysis (ADAMS Accession No. ML20205L563). The staff develops a 
regulatory analysis to assess the value of issuing or revising a 
regulatory guide as well as alternative courses of action.

III. Backfitting, Forward Fitting, and Issue Finality

    DG-1373, if finalized, would provide guidance for performing 
criticality analyses of fuel storage at light-water reactor power 
plants. Issuance of DG-1373, if finalized, would not constitute 
backfitting as defined in 10 CFR 50.109, ``Backfitting,'' and as 
described in NRC Management Directive 8.4, ``Management of Backfitting, 
Forward Fitting, Issue Finality, and Information Requests,'' (Ref. 18); 
affect issue finality of any approval issued under 10 CFR part 52; or 
constitute forward fitting as defined in Management Directive 8.4. As 
explained in DG-1373, licensees are not required to comply with the 
positions set forth in this guide.

    Dated: September 2, 2020.

    For the Nuclear Regulatory Commission.
Meraj Rahimi,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2020-19774 Filed 9-4-20; 8:45 am]
BILLING CODE 7590-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.