Kentucky Disaster #KY-00051
This is a Notice of the Presidential declaration of a major disaster for Public Assistance Only for the State of Kentucky (FEMA- 4196-DR), dated 09/30/2014. Incident: Severe Storms, Flooding, Landslides, and Mudslides. Incident Period: 08/18/2014 through 08/23/2014.
California Disaster #CA-00225
This is a notice of an Administrative declaration of a disaster for the State of CALIFORNIA dated 10/01/2014. Incident: Boles Fire. Incident Period: 09/15/2014 and continuing.
The Entire United States and U.S. Territories
This is a notice of the Military Reservist Economic Injury Disaster Loan Program (MREIDL), dated 10/01/2014.
Fuel-Cladding Issues in Postulated Spent Fuel Pool Accidents
The U.S. Nuclear Regulatory Commission (NRC) has received a petition for rulemaking (PRM) from Mr. Mark Edward Leyse (the petitioner), dated June 19, 2014. The petition was docketed by the NRC on July 14, 2014, and has been assigned Docket No. PRM-50-108. The petitioner requests that the NRC make new regulations concerning the use of spent fuel pool (SFP) accident evaluation models. The NRC is not requesting public comment on PRM-50-108 at this time.
Environmental Assessment and Finding of No Significant Impact: Dominion Energy Kewaunee, Kewaunee Power Station
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of exemptions in response to a request from Dominion Energy Kewaunee (DEK, the licensee), which would permit the licensee to reduce its emergency planning (EP) activities at the Kewaunee Power Station. Kewaunee Power Station has been permanently shut down and defueled since May of 2013. The licensee is seeking exemptions that would eliminate the requirements to maintain offsite radiological emergency plans and reduce some of the onsite emergency planning activities based on the reduced risks at the permanently shutdown and defueled reactor. Offsite emergency planning provisions would still exist using a comprehensive emergency management plan process. The NRC staff is issuing a final Environmental Assessment (EA) and final Finding of No Significant Impact (FONSI) associated with the proposed exemptions.
Confirmatory Order in the Matter of Chicago Bridge and Iron Company
The U.S. Nuclear Regulatory Commission (NRC) is issuing a confirmatory order to Chicago Bridge and Iron Company (CB&I) confirming agreements reached in an Alternative Dispute Resolution session held on May 30, 2014. As part of the agreement, CB&I will take a number of actions to strengthen its safety culture monitoring program, employee concerns program, employee training, and communications. These actions are in addition to the actions being taken in response to the September 16, 2013 confirmatory order issued by the NRC.
Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station; Extension of Public Comment Period
This document modifies a notice appearing in the Federal Register on September 22, 2014 (79 FR 56608), by extending the original public comment period from October 22, 2014, to October 26, 2014. This action was requested by concerned stakeholders who sought additional time to provide comments.
Information Collection; Reporting Executive Compensation and First-Tier Subcontract Awards
Under the provisions of the Paperwork Reduction Act, the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve a previously approved information collection requirement for Reporting Executive Compensation and First-tier Subcontract Awards.
Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978
The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit applications received.
Actions Taken at September 4, 2014, Meeting
As part of its regular business meeting held on September 4, 2014, in Corning, New York, the Commission took the following actions: (1) Approved or tabled the applications of certain water resources projects; (2) accepted settlements in lieu of penalty from Carrizo (Marcellus), LLC; JKT Golf LLC; and Southwestern Energy Production Company; and (3) took additional actions, as set forth in the Supplementary Information below.
Certain Standard Cell Libraries, Products Containing or Made Using the Same, Integrated Circuits Made Using the Same, and Products Containing Such Integrated Circuits; Commission Decision Not To Review an Initial Determination Terminating the Investigation; Termination of the Investigation
Notice is hereby given that the U.S. International Trade Commission has determined not to review an initial determination (``ID'') (Order No. 36) of the presiding administrative law judge (``ALJ'') terminating the above-captioned investigation as to all respondents based on a settlement agreement. The Commission has terminated the investigation.
Arts Advisory Panel Meeting
Pursuant to Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), as amended, notice is hereby given that three meetings of the Arts Advisory Panel to the National Council on the Arts will be held by teleconference from Constitutuion Center, 400 7th St. SW., Washington, DC 20506, as follows (ending time is approximate): Design (application review): This meeting will be closed. Dates: October 27, 2014. 11:00 a.m. to 1:30 p.m. Eastern Time. Design (application review): This meeting will be closed. Dates: October 27, 2014. 2:00 p.m. to 4:30 p.m. Eastern Time. Design (application review): This meeting will be closed. Dates: October 28, 2014. 2:00 p.m. to 4:30 p.m. Eastern Time.
Information Collection Being Reviewed by the Federal Communications Commission
As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501-3520), the Federal Communications Commission (FCC or the Commission) invites the general public and other Federal agencies to take this opportunity to comment on the following information collection. Comments are requested concerning: whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission's burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the PRA that does not display a valid Office of Management and Budget (OMB) control number.
Hearings of the Judicial Conference Advisory Committee on Rules of Civil Procedure
The following public hearing on proposed amendments to the Federal Rules of Civil Procedure has been canceled: Civil Rules Hearing, October 31, 2014, Washington, DC.
Petitions for Reconsideration of Action in Rulemaking Proceeding
In this document, Petitions for Reconsideration (Petitions) have been filed in the Commission's Rulemaking proceeding by Julia Benincosa Legg, on behalf of West Virginia Department of Education; David L. Haga, on behalf of Verizon; Gary Rawson, on behalf of State E- rate Coordinators' Alliance (SECA); Kevin Rupy, on behalf of United States Telecom Association; Michael R. Romano, on behalf of NTCA/Utah Rural Telecom Association; and Dennis Sampson, on behalf of Utah Education Network.
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of three amendment requests. The amendment requests are for Columbia Generating Station; Waterford Steam Electric Station, Unit 3; and Seabrook Station, Unit 1. For each amendment request, the NRC proposes to determine that they involve no significant hazards consideration. In addition, each amendment request contains sensitive unclassified non-safeguards information (SUNSI).