September 29, 2011 – Federal Register Recent Federal Regulation Documents

Results 51 - 100 of 168
National Institute of Nursing Research; Notice of Closed Meeting
Document Number: 2011-25101
Type: Notice
Date: 2011-09-29
Agency: Department of Health and Human Services, National Institutes of Health
Center for Scientific Review; Notice of Closed Meetings
Document Number: 2011-25100
Type: Notice
Date: 2011-09-29
Agency: Department of Health and Human Services, National Institutes of Health
National Institute of Justice Interview Room Recording Systems and License Plate Readers Workshop
Document Number: 2011-25099
Type: Notice
Date: 2011-09-29
Agency: Department of Justice, Office of Justice Programs, Justice Programs Office
The National Institute of Justice (NIJ) and the International Association of Chiefs of Police (IACP) are hosting two workshops in conjunction with the 118th Annual IACP Conference in Chicago, Ill. The focus of the workshops is the development of NIJ performance standards for Interview Room Recording Systems and License Plate Readers used by law enforcement agencies. Sessions are intended to inform manufacturers, test laboratories, certification bodies and other interested parties of these standards development efforts. Attendees in each workshop will be provided with an overview of the NIJ standards development process, work to date on the effort and a projected timeline for completion. Please access the following webpage to register for the Interview Room Video Systems workshop: https://www.surveymonkey.com/s/ interviewroomworkshopreg. Please access the following webpage to register for the License Plate Reader workshop: https://www.surveymonkey.com/s/ALPRworkshop reg.
Prospective Grant of Exclusive License: Compositions and Method for Preventing Reactogenicity Associated with Administration of Immunogenic Live Rotavirus Compositions
Document Number: 2011-25098
Type: Notice
Date: 2011-09-29
Agency: Department of Health and Human Services, National Institutes of Health
This is notice, in accordance with 35 U.S.C. 209(c)(1) and 37 CFR 404.7(a)(1)(i), that the National Institutes of Health, Department of Health and Human Services, is contemplating the grant of an exclusive patent license to practice the inventions embodied in U.S. Provisional Patent Application No. 60/178,689, filed January 28, 2000 [HHS Ref. No. E-088-2000/0-US-01], now expired; PCT Patent Application No. PCT/US01/02686 [HHS Ref. No. E-088-2000/0-PCT-02] filed January 26, 2001, which published as WO/2001/54718 on August 2, 2001, now expired; U.S. Patent No. 7,431,931 [HHS Ref. No. E-088-2000/0-US-06]; Australian Patent No. 784344 [HHS Ref. No. E-088-2000/0-AU-04]; German Patent No. 60141681.308 [HHS Ref. No. E-088-2000/0-DE-08]; French Patent No. 1251869 [HHS Ref. No. E-088-2000/0-FR-09]; United Kingdom Patent No. 1251869 [HHS Ref. No. E-088-2000/0-GB-10]; and Canadian Patent Application No. 2398428 [HHS Ref. No. E-088-2000/0-CA-05], entitled ``Compositions and Method for Preventing Reactogenicity Associated with Administration of Immunogenic Live Rotavirus Compositions,'' and all continuing applications to International Medica Foundation, having a place of business in Rochester, Minnesota. The patent rights in these inventions have been assigned to the United States of America. The prospective exclusive license territory may be ``worldwide'', and the field of use may be limited to ``rhesus-based rotavirus therapeutic and/or prophylactic vaccines.''
Phytosanitary Treatments; Location of and Process for Updating Treatment Schedules; Technical Amendment
Document Number: 2011-25097
Type: Rule
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
In a final rule that was published in the Federal Register on January 26, 2010, and effective on February 25, 2010, we amended the phytosanitary treatment regulations by removing the lists of approved treatments and treatment schedules from the regulations, while retaining the general requirements for performing treatments and certifying or approving treatment facilities. The final rule also removed treatment schedules from other places where they had been found in APHIS regulations and provided that approved treatment schedules will instead be found in the Plant Protection and Quarantine Treatment Manual, which is available on the Internet. In the final rule, we neglected to provide for the Administrator of the Animal and Plant Health Inspection Service to approve treatments that are not found in the Treatment Manual, and we did not retain text explaining that irradiation can be used as a substitute for other treatments. In this amendment, we are amending the regulation to provide for such approval of treatments and to restore the text we removed.
National Institute of Allergy and Infectious Diseases Notice of Closed Meetings
Document Number: 2011-25096
Type: Notice
Date: 2011-09-29
Agency: Department of Health and Human Services, National Institutes of Health
National Institute of Diabetes and Digestive and Kidney Diseases Notice of Closed Meeting
Document Number: 2011-25095
Type: Notice
Date: 2011-09-29
Agency: Department of Health and Human Services, National Institutes of Health
Agency Information Collection Activities; Submission for OMB Review; Comment Request; Representative Payee Report, Representative Payee Report, Short Form, Physician's/Medical Officer's Statement
Document Number: 2011-25094
Type: Notice
Date: 2011-09-29
Agency: Office of the Secretary, Department of Labor
The Department of Labor (DOL) is submitting the Office of Workers' Compensation Programs (OWCP) sponsored information collection request (ICR) titled, ``Representative Payee Report, Representative Payee Report, Short Form, Physician's/Medical Officer's Statement,'' to the Office of Management and Budget (OMB) for review and approval for continued use in accordance with the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501 et seq.).
Formations of, Acquisitions by, and Mergers of Savings and Loan Holding Companies; Correction
Document Number: 2011-25093
Type: Notice
Date: 2011-09-29
Agency: Federal Reserve System, Agencies and Commissions
Irradiation Treatment; Location of Facilities in the Southern United States
Document Number: 2011-25092
Type: Proposed Rule
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are proposing to amend the phytosanitary treatment regulations to provide generic criteria for new irradiation treatment facilities in the Southern States of the United States. This action would allow irradiation facilities to be located anywhere in these States, subject to approval, rather than only in the currently approved locations. We are also proposing to allow for the irradiation treatment of certain imported fruit from India and Thailand upon arrival in the United States. This action would facilitate the importation of fruit requiring irradiation treatment while continuing to provide protection against the introduction of pests of concern into the United States.
Florigene Pty., Ltd.; Determination of Nonregulated Status for Altered Color Roses
Document Number: 2011-25090
Type: Notice
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are advising the public of our determination that two hybrid rose lines developed by Florigene Pty., Ltd., designated as IFD- 524[Oslash]1-4 and IFD-529[Oslash]1-9, which have been genetically engineered to produce novel flower color, are no longer considered a regulated article under our regulations governing the introduction of certain genetically engineered organisms. Our determination is based on our evaluation of data submitted by Florigene Pty., Ltd., in its petition for a determination of nonregulated status, our analysis of available scientific data, and comments received from the public in response to our previous notice announcing the availability of the petition for nonregulated status and its associated environmental assessment and plant pest risk assessment. This notice also announces the availability of our written determination and finding of no significant impact.
Gypsy Moth Generally Infested Areas; Additions in Indiana, Maine, Ohio, Virginia, West Virginia, and Wisconsin
Document Number: 2011-25089
Type: Rule
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are adopting as a final rule, without change, an interim rule that amended the regulations to add areas in Indiana, Maine, Ohio, Virginia, West Virginia, and Wisconsin to the list of generally infested areas based on the detection of infestations of gypsy moth in those areas. The interim rule was necessary to prevent the artificial spread of the gypsy moth to noninfested areas of the United States.
Golden Nematode; Removal of Regulated Areas
Document Number: 2011-25088
Type: Rule
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are amending the golden nematode regulations by removing the townships of Elba and Byron in Genesee County, NY, from the list of generally infested areas. Surveys have shown that the fields in these two townships are free of golden nematode, and we have determined that regulation of these areas is no longer necessary. As a result of this action, all the areas in Genesee County, NY, that have been listed as generally infested will be removed from the list of areas regulated for golden nematode.
Notice of Availability of a Pest Risk Analysis for the Importation of Fresh Tejocote Fruit From Mexico
Document Number: 2011-25087
Type: Notice
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are advising the public that we have prepared a pest risk analysis that evaluates the risks associated with the importation into the continental United States of fresh tejocote fruit from Mexico. Based on this analysis, we believe that the application of one or more designated phytosanitary measures will be sufficient to mitigate the risks of introducing or disseminating plant pests or noxious weeds via the importation of fresh tejocote fruit from Mexico. We are making the pest risk analysis available to the public for review and comment.
Syngenta Biotechnology, Inc.; Determination of Nonregulated Status for Lepidopteran-Resistant Cotton
Document Number: 2011-25086
Type: Notice
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are advising the public of our determination that a cotton line developed by Syngenta Biotechnology, Inc., designated as event COT67B, which has been genetically engineered to express a protein to protect cotton plants from lepidopteran insect damage, is no longer considered a regulated article under our regulations governing the introduction of certain genetically engineered organisms. Our determination is based on our evaluation of data submitted by Syngenta Biotechnology, Inc., in its petition for a determination of nonregulated status, our analysis of available scientific data, and comments received from the public in response to our previous notice announcing the availability of the petition for nonregulated status and its associated environmental assessment and plant pest risk assessment. This notice also announces the availability of our written determination and finding of no significant impact.
Notice of Availability of a Pest Risk Analysis for the Importation of Pomegranate From India Into the Continental United States
Document Number: 2011-25085
Type: Notice
Date: 2011-09-29
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are advising the public that we have prepared a pest risk analysis that evaluates the risks associated with the importation into the continental United States of fresh pomegranate fruit from India. Based on that analysis, we believe that the application of one or more designated phytosanitary measures will be sufficient to mitigate the risks of introducing or disseminating plant pests or noxious weeds via the importation of fresh pomegranate fruit from India. We are making the pest risk analysis available to the public for review and comment.
Endangered and Threatened Wildlife and Plants; 90-Day Finding on a Petition To List the American Eel as Threatened
Document Number: 2011-25084
Type: Proposed Rule
Date: 2011-09-29
Agency: Fish and Wildlife Service, Department of the Interior
We, the U.S. Fish and Wildlife Service (Service), announce a 90-day finding on a petition to list the American eel (Anguilla rostrata) as threatened under the Endangered Species Act of 1973, as amended (Act). Based on our review, we find that the petition presents substantial scientific or commercial information indicating that listing this species may be warranted. Therefore, with the publication of this notice, we are initiating a review of the status of the species to determine if listing the American eel is warranted. To ensure that this status review is comprehensive, we are requesting scientific and commercial data and other information regarding this species. Based on the status review, we will issue a 12-month finding on the petition, which will address whether the petitioned action is warranted, as provided in section 4(b)(3)(B) of the Act.
Settlement Agreements for Recovery of Past Response Costs; Granite Timber Post and Pole Site, Philipsburg, Granite County, MT
Document Number: 2011-25082
Type: Notice
Date: 2011-09-29
Agency: Environmental Protection Agency
In accordance with the requirements of Section 122(i)(1) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA), 42 U.S.C. 9622(i)(1), notice is hereby given of two Settlement Agreements under Section 122 (h)(1) of CERCLA, 42 U.S.C. 9622 (h)(1), between the United States Environmental Protection Agency (EPA) and Margery Metesh (Settling Party) and Mark Metesh (Settling Party), regarding the Granite Timber Site (Site), located 5 miles south of Philipsburg and 0.5 miles west of Montana Highway 10A in Granite County, Montana. The Settlement Agreements propose to compromise a claim the United States has at this Site for Past Response Costs, as those terms are defined in the Settlement Agreements. Under the terms of the Settlement Agreements, the EPA and the Settling Parties agree that the Settling Parties have no ability to pay and the Settling Parties agree not to assert any claims or causes of action against the United States or its contractors or employees with respect to the Site. Additionally, Margery Metesh (Settling Party) agrees to file a deed record notice concerning a building on a small portion of the Site property. In exchange, the Settling Parties will be granted a covenant not to sue under section 107(a) of CERCLA, 42 U.S.C. 9607(a), with regard to reimbursement of Past Response Costs. Opportunity for Comment: For thirty (30) days following the publication of this notice, the EPA will consider all comments received and may modify or withdraw its consent to that portion of the Settlement Agreement, if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The EPA's response to any comments received will be available for public inspection at the Superfund Record Center, EPA Region 8, 1595 Wynkoop Street, 3rd Floor, in Denver, Colorado.
Comment Request for Information Collection; Apprenticeship Programs, Labor Standards for Registration; Extension With Revisions
Document Number: 2011-25081
Type: Notice
Date: 2011-09-29
Agency: Employment and Training Administration, Department of Labor
The Department of Labor (Department), as part of its continuing effort to reduce paperwork and respondent burden, conducts a preclearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed and/or continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA95) [44 U.S.C. 3506(c)(2)(A)]. This program helps to ensure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently, the Employment and Training Administration (ETA) is soliciting comments concerning the collection of data about Title 20 CFR part 29, Apprenticeship Programs, Labor Standards for Registration with an expiration date of January 31, 2012. A copy of the proposed information collection request (ICR) can be obtained by contacting the office listed below in the addresses section of this notice.
Adequacy Status of the Ohio Portion of the Huntington/Ashland Submitted Annual Fine Particulate Matter Maintenance Plan for Transportation Conformity Purposes
Document Number: 2011-25080
Type: Notice
Date: 2011-09-29
Agency: Environmental Protection Agency
In this notice, EPA is notifying the public that we have made insignificance findings through the transportation conformity adequacy process, under the Clean Air Act, for directly emitted fine particulate matter (PM2.5) and oxides of nitrogen (NOX) in the Ohio portion of the Huntington/Ashland WV-KY-OH area. Ohio submitted the insignificance findings with the redesignation and maintenance plan submittal on May 4, 2011. As a result of our findings, the Ohio portion of the Huntington/Ashland area is no longer required to perform a regional emissions analysis for either directly emitted PM2.5 or NOX as part of future PM2.5 conformity determinations for the 1997 annual PM2.5 air quality standard.
DHS Data Privacy and Integrity Advisory Committee; Meeting
Document Number: 2011-25079
Type: Notice
Date: 2011-09-29
Agency: Office of the Secretary, Department of Homeland Security
On Wednesday, September 21, 2011, the DHS Privacy Office announced in the Federal Register at 76 FR 58524 that the Data Privacy and Integrity Advisory Committee would meet on October 5, 2011, in Arlington, Virginia. This notice supplements that original meeting notice.
Revision of Cotton Futures Classification Procedures
Document Number: 2011-25078
Type: Proposed Rule
Date: 2011-09-29
Agency: Agricultural Marketing Service, Department of Agriculture
The Agricultural Marketing Service (AMS) is proposing to update the procedures for cotton futures quality classification services by using Smith-Doxey classification data in the cotton futures classification process. In addition, references to a separate and optional review of cotton futures certification would be eliminated to reflect current industry practices. These proposed changes in procedures for cotton futures quality classification services, as well as proposed conforming changes, reflect advances in cotton fiber quality measurement and data processing made since the regulations were last updated in 1992.
Proposed Collection; Comment Request
Document Number: 2011-25077
Type: Notice
Date: 2011-09-29
Agency: Securities and Exchange Commission, Agencies and Commissions
Proposed Collection; Comment Request
Document Number: 2011-25076
Type: Notice
Date: 2011-09-29
Agency: Securities and Exchange Commission, Agencies and Commissions
Record of Decision, Texas Clean Energy Project
Document Number: 2011-25070
Type: Notice
Date: 2011-09-29
Agency: Department of Energy
The U.S. Department of Energy (DOE) announces its decision to continue to provide financial support to the Texas Clean Energy Project (TCEP). DOE prepared an Environmental Impact Statement (EIS) (DOE/EIS- 0444) to assess the environmental impacts associated with the TCEP, a project that Summit Texas Clean Energy, LLC (Summit) would design, construct, and operate. The project will demonstrate advanced power systems using integrated gasification combined-cycle (IGCC) technology to generate 400 megawatts (gross) of electric power from coal and will put 130 to 213 megawatts on the power grid while capturing approximately 90 percent of its carbon dioxide (CO2) emissions. The project will sequester approximately 2.5 to 3.0 million tons (2.3 to 2.7 million metric tonnes) of CO2 per year. The CO2 will be delivered through a regional pipeline network to existing oil fields in the Permian Basin of West Texas for use in enhanced oil recovery (EOR) by third-parties. The plant will also produce urea, argon, and sulfuric acid for sale in commercial markets. Because of its multiple products, the facility is referred to as a polygeneration (polygen) plant. The plant will be built on a 600-acre (243-hectare) oil field site in Ector County, Texas, north of the community of Penwell, and will continue in commercial operation for 30 to 50 years. DOE's proposed action, as described in the EIS, is to provide cost- shared financial assistance under DOE's Clean Coal Power Initiative (CCPI) using a combination of American Recovery and Reinvestment Act of 2009 (ARRA) (Pub. L. 111-5) funds and other CCPI program funds. After careful consideration of the potential environmental impacts and other factors such as program goals and objectives, DOE has decided to provide, through a cooperative agreement with Summit, $450 million in cost-shared funding, which is approximately 26 percent of the project's total capital cost of $1.73 billion (2009 dollars). The balance of project funding is expected to come from private sector investors and lenders.
Privacy Act of 1974; as Amended; Notice To Amend an Existing System of Records
Document Number: 2011-25069
Type: Notice
Date: 2011-09-29
Agency: Department of the Interior
Pursuant to the provisions of the Privacy Act of 1974, as amended (5 U.S.C. 552a), the Department of the Interior (DOI) is issuing a public notice of its intent to amend the Office of Inspector General (OIG) Investigative Records system of records notice. The amendment includes a consolidated and updated list of routine uses. The amended system of records is captioned ``Investigative Records Interior, Office of Inspector General2 (OIG-2).'' This system of records OIG-2 was first published in the Federal Register on April 11, 1977 (42 FR 19014). The system was last revised on August 18, 1983 (48 FR 37536).
Selawik National Wildlife Refuge, Kotzebue, AK; Revised Comprehensive Conservation Plan and Finding of No Significant Impact for Environmental Assessment
Document Number: 2011-25068
Type: Notice
Date: 2011-09-29
Agency: Fish and Wildlife Service, Department of the Interior
We, the Fish and Wildlife Service (Service, USFWS), announce the availability of our revised comprehensive conservation plan (CCP) and finding of no significant impact (FONSI) for the Selawik National Wildlife Refuge (Refuge). In this revised CCP, we describe how we will manage the Refuge for the next 15 years.
Petition for Exemption; Summary of Petition Received
Document Number: 2011-25067
Type: Notice
Date: 2011-09-29
Agency: Federal Aviation Administration, Department of Transportation
This notice contains a summary of a petition seeking relief from specified requirements of 14 CFR. The purpose of this notice is to improve the public's awareness of, and participation in, this aspect of FAA's regulatory activities. Neither publication of this notice nor the inclusion or omission of information in the summary is intended to affect the legal status of the petition or its final disposition.
Post Office Closing
Document Number: 2011-25065
Type: Notice
Date: 2011-09-29
Agency: Postal Regulatory Commission, Agencies and Commissions
This document informs the public that an appeal of the closing of the Clarksville, New York post office has been filed. It identifies preliminary steps and provides a procedural schedule. Publication of this document will allow the Postal Service, petitioners, and others to take appropriate action.
Petition for Waiver of Compliance
Document Number: 2011-25064
Type: Notice
Date: 2011-09-29
Agency: Federal Railroad Administration, Department of Transportation
Final Wilderness and Backcountry Management Plan and Environmental Impact Statement for Isle Royale National Park, MI
Document Number: 2011-25062
Type: Notice
Date: 2011-09-29
Agency: Department of the Interior, National Park Service
Pursuant to Section 102(2)(C) of the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of a Final Wilderness and Backcountry Management Plan and Environmental Impact Statement (Plan/EIS)for Isle Royale National Park, Michigan (Isle Royale).
Closure of the U.S. Nuclear Regulatory Commission's Two White Flint North Building Entrance
Document Number: 2011-25061
Type: Notice
Date: 2011-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is providing notice that beginning Monday, October 3, 2011, all visitors to the NRC White Flint Complex headquarters shall be required to enter through the recently renovated One White Flint North (OWFN) building entrance lobby. Only NRC badged employees and contractors shall be permitted to use the Two White Flint North (TWFN) building entrance. NRC staff shall meet visitors in the OWFN lobby waiting area and escort them to their destination.
Early Scoping Notice
Document Number: 2011-25060
Type: Notice
Date: 2011-09-29
Agency: Federal Transit Administration, Department of Transportation
The Federal Transit Administration (FTA) and the Metro (Oregon) regional government issue this early scoping notice to advise other agencies and the public that they intend to explore alternatives for improving transit service between downtown Portland and Sherwood, in Multnomah and Washington counties. The early scoping is occurring within the context of the Council on Environmental Quality's regulations for complying with the National Environmental Policy Act (NEPA). Several alternatives will be examined to explore their potential for implementation of a major transit capital investment under the New Starts funding program including light rail, bus rapid transit, rapid streetcar, high occupancy vehicle lanes, high occupancy toll lanes and a transportation system management (TSM) alternative. Public workshops have been planned and are described below. The FTA Alternatives Analysis (AA) process, as described in 49 U.S.C. 5309 (a) (1), will assess a wide range of public transportation alternatives designed to address the transportation problems within the corridor. This process will involve a more robust and detailed level of alternatives and will ultimately lead to the selection of a locally preferred alternative. The initial phase of AA will provide adequate information to determine which alternative(s) to pursue for further analysis for implementation and what level of environmental analysis would be necessary for project implementation. In the second phase, the project may solicit [or obtain] additional public, agency, and tribal input to identify the nature and scope of the environmental issues that should be addressed during NEPA review, following appropriate public notice (anticipated in 2013). This NEPA scoping process will vary depending on whether the project requires an environmental assessment or an environmental impact statement. Metro and FTA will notify the public of NEPA scoping after that decision has been made. Information about upcoming public meetings and about the project's purpose is set forth below.
Notice of Realty Action: Recreation and Public Purposes Act Classification and Conveyance of Public Land in Emery County, UT
Document Number: 2011-25059
Type: Notice
Date: 2011-09-29
Agency: Department of the Interior, Bureau of Land Management, Land Management Bureau
The Bureau of Land Management (BLM) has examined and found suitable for classification and conveyance to Emery County under the provisions of the Recreation and Public Purposes (R&PP) Act, as amended, a parcel of public land in Emery County, Utah. Emery County proposes to establish a public shooting range facilities complex.
Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)
Document Number: 2011-25058
Type: Notice
Date: 2011-09-29
Agency: Department of Energy
The Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) was established under section 807 of the Energy Policy Act of 2005 (EPAct) (Pub. L. 109-58; 119 Stat. 849). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that publish notice of these meetings be announced in the Federal Register.
Records Governing Off-the-Record Communications; Public Notice
Document Number: 2011-25053
Type: Notice
Date: 2011-09-29
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental Assessment Addressing Four Federal Coal Lease Applications in Haskell and LeFlore Counties, OK; Correction
Document Number: 2011-25051
Type: Notice
Date: 2011-09-29
Agency: Department of the Interior, Bureau of Land Management, Land Management Bureau
The Bureau of Land Management published a Notice of Intent in the Federal Register on June 24, 2011 (76 FR 37145), concerning preparation of the Oklahoma Resource Management Plan Amendment and associated Environmental Assessment addressing Four Federal Coal Lease Applications in Haskell and LeFlore Counties, Oklahoma. The notice omitted a legal land description for a portion of the scoping area.
Environmental Impact Statement; North Corridor Transit Project, Seattle (WA) Metropolitan Area (King and Snohomish Counties)
Document Number: 2011-25050
Type: Notice
Date: 2011-09-29
Agency: Federal Transit Administration, Department of Transportation
In accordance with the National Environmental Policy Act (NEPA), the Federal Transit Administration and the Central Puget Sound Regional Transit Authority (Sound Transit) intend to prepare an Environmental Impact Statement (EIS) for Sound Transit's proposed extension of the Central Link Light Rail system from Seattle in King County to the city of Lynnwood in Snohomish County, Washington. The EIS will also be prepared in accordance with Washington's State Environmental Policy Act (SEPA). This Notice of Intent initiates scoping for the EIS, invites interested parties to participate in the EIS process, provides information about the purpose and need for the proposed transit project, includes the general set of alternatives being considered for evaluation in the EIS, and identifies potential environmental effects to be considered. With this notice, Sound Transit and FTA invite public comments on the scope of the EIS, and announce the public scoping meetings that will be conducted. Alternatives being considered for evaluation in the EIS include a No-Build alternative and various build alternatives to develop light rail in the North Corridor. The light rail alternatives are based on the most promising alternatives identified through an Alternatives Analysis study completed by the project. Early scoping for the alternatives analysis phase was previously announced in the Federal Register on September 27, 2010. Results of the alternatives analysis are described below.
Issuance of a Loan Guarantee to Tonopah Solar Energy, LLC, for the Crescent Dunes Solar Energy Project
Document Number: 2011-25049
Type: Notice
Date: 2011-09-29
Agency: Department of Energy
The U.S. Department of Energy (DOE) announces its decision to issue a Federal loan guarantee under Title XVII of the Energy Policy Act of 2005 (EPAct 05), as amended by Section 406 of the American Recovery and Reinvestment Act of 2009 (Recovery Act), to Tonopah Solar Energy, LLC (TSE), for construction and start-up of the Crescent Dunes Solar Energy Project (the Project). The Project is a proposed 110- megawatt solar power generating facility based on concentrating solar power technology, using mirrors and a central receiver, on approximately 2,250 acres of U.S. Bureau of Land Management (BLM)- administered lands in Nye County, Nevada. The environmental impacts of construction and start-up of the Project were analyzed in the Final Environmental Impact Statement for the Tonopah Solar Energy, LLC, Crescent Dunes Solar Energy Project, Nye County, Nevada (75 FR 70917, November 19, 2010) (FEIS), prepared by BLM with DOE as a cooperating agency. BLM consulted DOE during the preparation of this EIS, DOE provided comments, and BLM addressed those comments in the FEIS. DOE subsequently determined that the Project analyzed in the FEIS was substantially the same as the Project that would be covered by the DOE loan guarantee, and DOE adopted the FEIS (76 FR 7844; February 11, 2011).
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.