Selawik National Wildlife Refuge, Kotzebue, AK; Revised Comprehensive Conservation Plan and Finding of No Significant Impact for Environmental Assessment, 60522-60523 [2011-25068]
Download as PDF
60522
Federal Register / Vol. 76, No. 189 / Thursday, September 29, 2011 / Notices
are changed on a cyclical basis. These
computer servers are located in locked
facilities that are secured at all times by
alarm systems and video surveillance
cameras. During non-duty hours the
alarm system provides immediate
notification of any attempted intrusion
to OIG Information Technology
personnel. All data exchanged between
the servers and individual personal
computers is encrypted. Backup tapes
are stored in a locked and controlled
room in a secure, off-site location.
Measures have been taken to ensure that
the handling of this information meets
the requirements of the Department of
the Interior’s Privacy Act regulations, 43
CFR 2.51. A Privacy Impact Assessment
was conducted and recently updated
regarding the electronic records within
OIG–2. The assessment verified that
appropriate controls and safeguards are
in place. Safeguards include, but are not
limited to, a requirement restricting
access to the system to OIG personnel
who have a ‘‘need to know’’ and have
been granted authority by the System
Manager. The records and system
security plan is prepared in a way to
reduce the impact to the individual’s
privacy and to manage the system on a
‘‘need to know’’ basis according to the
Privacy Act.
All personnel within OIG, including
all personnel with access to records in
OIG–2, are required to complete Privacy
Act, Records Management, and IT
Security Awareness training on an
annual basis.
tkelley on DSKG8SOYB1PROD with NOTICES
Records relating to persons covered
by this system are retained for ten years
after the completion of the investigation
and/or action based thereon at the U.S.
Department of the Interior, Office of
Inspector General, 1849 C St., NW.,
Washington DC 20240. After ten years
records are transferred to the National
Archives and Records Administration.
Subpoena log and subpoenaed records
are destroyed or returned when no
longer needed for agency use. Records
are disposed of under applicable
guidelines. See 384 DM 1. The records
control schedule and disposal standards
may be obtained by writing to the
Systems Manager at the address below.
The specific records schedule covering
the system is found in the United States
Department of the Interior, Office of
Secretary, Comprehensive Records
Disposal Schedule, Subcategory G,
Audit and Investigation, Item 2,
Investigative Records.
SYSTEM MANAGER AND ADDRESS:
Assistant Inspector General for
Investigations, Office of Inspector
15:29 Sep 28, 2011
RECORD SOURCE CATEGORIES:
As an investigative agency focusing
on the activities of the DOI, OIG collects
information from all relevant sources.
These include (1) The DOI, its bureaus
and components, and all employees and
agents; (2) other federal and non-federal
government agencies, and their
employees and agents, having business
with the DOI; (3) non-government
entities, and their employees and
agents, having business with the DOI;
(4) any entity or individual, including
members of the public, who make
complaints to OIG regarding activities of
the DOI or who have information that is
relevant to our investigations.
EXEMPTIONS CLAIMED FOR THE SYSTEM:
Pursuant to 5 U.S.C. 552a(j)(2) the
system is exempt from all of the
provisions of 5 U.S.C. 552a except
subsections (b), (c)(1) and (2), (e)(4)(A)
through (F), (e)(6), (7), (9), (10), and (11),
and (i) and regulations implementing
these provisions. 43 CFR 2.79(a); see
also 48 FR 37536–03 (August 18, 1983);
48 FR 37411–01 (August 18, 1983).
Pursuant to 5 U.S.C. 552a(k)(2), the
system is exempt from 5 U.S.C. 552a
subsections (c)(3), (d), (e)(1), (e)(4)(G),
(H), and (I), and (f) and regulations
implementing these provisions. 43 CFR
2.79(b).
[FR Doc. 2011–25069 Filed 9–28–11; 8:45 am]
BILLING CODE 4310–10–P
RETENTION AND DISPOSAL:
VerDate Mar<15>2010
General, U.S. Department of the Interior,
1849 C St., NW., Mail Stop 4428,
Washington, DC 20240.
Jkt 223001
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FWS–R7–R–2011–N136; 70133–1265–0000–
S3]
Selawik National Wildlife Refuge,
Kotzebue, AK; Revised
Comprehensive Conservation Plan and
Finding of No Significant Impact for
Environmental Assessment
Fish and Wildlife Service,
Interior.
ACTION: Notice of availability.
AGENCY:
We, the Fish and Wildlife
Service (Service, USFWS), announce the
availability of our revised
comprehensive conservation plan (CCP)
and finding of no significant impact
(FONSI) for the Selawik National
Wildlife Refuge (Refuge). In this revised
CCP, we describe how we will manage
the Refuge for the next 15 years.
ADDRESSES: You may view or obtain
copies of the revised CCP and FONSI by
SUMMARY:
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
any of the following methods. You may
request a paper copy, a summary, or a
CD–ROM containing both.
You may request hard copies or a CD–
ROM of the document.
Agency Web Site: Download a copy of
the document at https://alaska.fws.gov/
nwr/planning/plans.htm.
E-mail: selawik_planning@fws.gov;
please include ‘‘Selawik National
Wildlife Refuge CCP’’ in the subject line
of the message.
Fax: Attn: Jeffrey Brooks, (907) 786–
3965, or Lee Anne Ayres, (907) 442–
3124.
U.S. Mail: Jeffrey Brooks, U.S. Fish
and Wildlife Service Regional Office,
1011 E. Tudor Road Mailstop 231,
Anchorage, AK 99503.
In-Person Viewing or Pickup: Call
(907) 786–3357 to make an appointment
during regular business hours at the
above address; or call (907) 442–3799 to
make an appointment during regular
business hours at the Selawik Refuge
Headquarters in Kotzebue, AK.
FOR FURTHER INFORMATION CONTACT:
Jeffrey Brooks, Planning Team Leader, at
the above address, by phone at (907)
786–3839, or by e-mail at
selawik_planning@fws.gov.
SUPPLEMENTARY INFORMATION:
Introduction
With this notice, we finalize the
revised CCP for Selawik National
Wildlife Refuge. We started this process
through a notice of intent in the Federal
Register (73 FR 57143; October 1, 2008).
We made available our draft CCP and
Environmental Assessment (EA) and
requested comments in a notice of
availability in the Federal Register (75
FR 65026, October 21, 2010). The draft
CCP and EA evaluated three alternatives
for managing the Refuge for the next 15
years.
The Selawik National Wildlife Refuge
was established by the Alaska National
Interest Lands Conservation Act
(ANILCA) in 1980. Selawik Refuge
straddles the Arctic Circle in
northwestern Alaska, encompassing an
area approximately the size of
Connecticut. Refuge boundaries
encompass approximately 3.2 million
acres, of which approximately 2.5
million acres are administered by the
U.S. Fish and Wildlife Service. Section
302(7)(B) of ANILCA states the purposes
for which the Selawik Refuge was
established: (1) To conserve fish and
wildlife populations and habitats in
their natural diversity; (2) to fulfill
international treaty obligations of the
United States with respect to fish and
wildlife and their habitats; (3) to
provide the opportunity for continued
E:\FR\FM\29SEN1.SGM
29SEN1
Federal Register / Vol. 76, No. 189 / Thursday, September 29, 2011 / Notices
tkelley on DSKG8SOYB1PROD with NOTICES
subsistence use by local residents; and
(4) to ensure water quality and
necessary water quantity within the
Refuge.
Access to the Refuge is possible only
by boat, float- or ski-equipped airplane,
snowmobile, or dogsled team.
Snowmobile trails provide vital links
among the Alaska Native villages of the
region in winter and are usually
passable to travelers through the end of
April. Several of these villages are
located within or near the Refuge
boundary, including Buckland, Noorvik,
Selawik, Kiana, Ambler, Kobuk, and
Shungnak.
The Draft CCP and EA for the Refuge
were developed consistent with Section
304(g) of ANILCA. Based on public
scoping, we identified eight major
planning issues: (1) Protection of fish,
wildlife, habitats, and subsistence; (2)
management of access to refuge lands
for community residents and the
visiting public; (3) maintaining hunting
opportunities; (4) addressing local
public use needs; (5) maintaining water
quality and quantity; (6) maintaining the
wild character of the Refuge and quality
visitor experiences; (7) proactively
addressing the uncertainties of climate
change; and (8) providing more outreach
and better communication for the
public. We considered and evaluated all
of these issues through the alternatives,
goals, and objectives addressed or
described in the draft CCP and the EA.
CCP Alternatives We Considered
The draft CCP and EA described and
evaluated three alternatives for
managing the Refuge. These alternatives
followed much of the same general
management direction. Alternative A
(the No-Action Alternative), required
under the National Environmental
Policy Act (NEPA), described
continuation of current management
activities. Under Alternative A,
management of the Refuge would have
continued to follow direction described
in the 1987 CCP and record of decision
as modified by subsequent programspecific plans (e.g., fisheries and fire
management plans). Alternative A
would have continued to protect and
maintain the existing wildlife values,
natural diversity, and ecological
integrity of the Refuge. Human
disturbances to fish and wildlife
habitats and populations would have
been minimal. Private and commercial
uses of the Refuge would not have
changed, and public uses employing
existing access methods would have
continued to be allowed. Opportunities
would have been maintained to pursue
traditional subsistence activities and
recreational hunting, fishing, and other
VerDate Mar<15>2010
15:29 Sep 28, 2011
Jkt 223001
wildlife dependent activities.
Opportunities would have been
maintained to pursue research activities.
Alternative B (the Preferred
Alternative) proposed to follow
management direction described in the
1987 CCP and record of decision as
modified by subsequent programspecific plans, but some of that
management direction has been updated
by changes in policy since the 1987
Selawik CCP was approved. Alternative
B identified these specific changes in
management direction and new goals
and objectives for Refuge management
that would be adopted regardless of
which alternative is selected.
Alternative B proposed continuing the
policy of not making some public lands,
which are intermingled with private
lands, available for use by commercial
guides and transporters whose clients
are big game hunting. Alternative B
proposed that a formal partnership be
created between the Refuge and local
entities to jointly maintain a shared
facility of one or more buildings with
capacity for office, meeting, and storage
space in a community within the refuge.
Alternative B proposed a study of
traditional access for subsistence
purposes. Alternative B proposed that
local public use and access needs be
addressed by creating formal
partnerships between the Refuge and
various local entities.
Alternative C would have continued
to follow management direction
described in Alternative A as modified
by subsequent program-specific plans.
Alternative C would have identified any
specific changes or updates in
management direction and adopted the
new goals and objectives for Refuge
management. Alternative C proposed
that the Refuge manager could open or
close some public lands, which are
intermingled with private lands, to use
by commercial guides and transporters
whose clients are big game hunting.
Alternative C proposed that the Refuge
independently maintain a facility of one
or more buildings with capacity for
office, meeting, and storage space in a
community within the refuge.
Alternative C proposed the same study
of traditional access for subsistence
purposes. Alternative C would address
local public use and access needs
slightly differently from Alternative B
by proposing to expand or improve
some opportunities for public use and
access on Refuge lands.
Changes Between Draft and Final Plan
The preferred alternative (Alternative
B) was slightly modified as a result of
public comments on the draft Plan. Use
by commercial guides and transporters
PO 00000
Frm 00077
Fmt 4703
Sfmt 9990
60523
for big game hunting is not authorized
by permit stipulation on refuge lands
that are in close proximity to or
intermingled with private lands in the
northwest portion of the refuge.
Alternative B was modified to authorize
use by commercial guides and
transporters in an additional 68,000
acres of the refuge. In addition,
Alternative B was modified to indicate
that, on a case-by-case basis, the refuge
manager may authorize commercial use
by special use permit for a part of the
area where guiding is not authorized
upon completion of a compatibility
determination and a subsistence
evaluation as required by ANILCA
Section 810.
The management of shelter cabins on
refuge lands in Alternative B was
modified to include the following
management. A formal partnership will
be created among the Service, Selawik
Refuge, Northwest Arctic Borough,
NANA regional corporation, and local
search and rescue organizations to
formalize the roles and responsibilities
of each partner in performing regular
maintenance and/or replacement of
shelter cabins on refuge lands. Members
of the formal partnership will review
the need for additional shelter cabins
and appropriate location(s) for them,
with the option of joint construction of
an additional 1–2 shelter cabins or
relocation of an existing shelter cabin on
refuge lands.
Compliance With the National
Environmental Policy Act
We are furnishing this notice to
advise other agencies and the public of
the availability of the final CCP and
FONSI. Based on the review and
evaluation of the information contained
in the draft CCP and EA, we have
determined that implementation of the
final CCP does not constitute a major
Federal action that would significantly
affect the quality of the human
environment within the meaning of
Section 102(2)(c) of the National
Environmental Policy Act (NEPA).
Therefore, an Environmental Impact
Statement will not be prepared. Future
site-specific proposals discussed in the
final CCP requiring additional NEPA
compliance will be addressed in
separate planning efforts with full
public involvement.
Dated: September 22, 2011.
Geoffrey L. Haskett,
Regional Director, U.S. Fish and Wildlife
Service, Anchorage, Alaska.
[FR Doc. 2011–25068 Filed 9–28–11; 8:45 am]
BILLING CODE 4310–55–P
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 76, Number 189 (Thursday, September 29, 2011)]
[Notices]
[Pages 60522-60523]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-25068]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FWS-R7-R-2011-N136; 70133-1265-0000-S3]
Selawik National Wildlife Refuge, Kotzebue, AK; Revised
Comprehensive Conservation Plan and Finding of No Significant Impact
for Environmental Assessment
AGENCY: Fish and Wildlife Service, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: We, the Fish and Wildlife Service (Service, USFWS), announce
the availability of our revised comprehensive conservation plan (CCP)
and finding of no significant impact (FONSI) for the Selawik National
Wildlife Refuge (Refuge). In this revised CCP, we describe how we will
manage the Refuge for the next 15 years.
ADDRESSES: You may view or obtain copies of the revised CCP and FONSI
by any of the following methods. You may request a paper copy, a
summary, or a CD-ROM containing both.
You may request hard copies or a CD-ROM of the document.
Agency Web Site: Download a copy of the document at https://alaska.fws.gov/nwr/planning/plans.htm.
E-mail: selawik_planning@fws.gov; please include ``Selawik
National Wildlife Refuge CCP'' in the subject line of the message.
Fax: Attn: Jeffrey Brooks, (907) 786-3965, or Lee Anne Ayres, (907)
442-3124.
U.S. Mail: Jeffrey Brooks, U.S. Fish and Wildlife Service Regional
Office, 1011 E. Tudor Road Mailstop 231, Anchorage, AK 99503.
In-Person Viewing or Pickup: Call (907) 786-3357 to make an
appointment during regular business hours at the above address; or call
(907) 442-3799 to make an appointment during regular business hours at
the Selawik Refuge Headquarters in Kotzebue, AK.
FOR FURTHER INFORMATION CONTACT: Jeffrey Brooks, Planning Team Leader,
at the above address, by phone at (907) 786-3839, or by e-mail at
selawik_planning@fws.gov.
SUPPLEMENTARY INFORMATION:
Introduction
With this notice, we finalize the revised CCP for Selawik National
Wildlife Refuge. We started this process through a notice of intent in
the Federal Register (73 FR 57143; October 1, 2008). We made available
our draft CCP and Environmental Assessment (EA) and requested comments
in a notice of availability in the Federal Register (75 FR 65026,
October 21, 2010). The draft CCP and EA evaluated three alternatives
for managing the Refuge for the next 15 years.
The Selawik National Wildlife Refuge was established by the Alaska
National Interest Lands Conservation Act (ANILCA) in 1980. Selawik
Refuge straddles the Arctic Circle in northwestern Alaska, encompassing
an area approximately the size of Connecticut. Refuge boundaries
encompass approximately 3.2 million acres, of which approximately 2.5
million acres are administered by the U.S. Fish and Wildlife Service.
Section 302(7)(B) of ANILCA states the purposes for which the Selawik
Refuge was established: (1) To conserve fish and wildlife populations
and habitats in their natural diversity; (2) to fulfill international
treaty obligations of the United States with respect to fish and
wildlife and their habitats; (3) to provide the opportunity for
continued
[[Page 60523]]
subsistence use by local residents; and (4) to ensure water quality and
necessary water quantity within the Refuge.
Access to the Refuge is possible only by boat, float- or ski-
equipped airplane, snowmobile, or dogsled team. Snowmobile trails
provide vital links among the Alaska Native villages of the region in
winter and are usually passable to travelers through the end of April.
Several of these villages are located within or near the Refuge
boundary, including Buckland, Noorvik, Selawik, Kiana, Ambler, Kobuk,
and Shungnak.
The Draft CCP and EA for the Refuge were developed consistent with
Section 304(g) of ANILCA. Based on public scoping, we identified eight
major planning issues: (1) Protection of fish, wildlife, habitats, and
subsistence; (2) management of access to refuge lands for community
residents and the visiting public; (3) maintaining hunting
opportunities; (4) addressing local public use needs; (5) maintaining
water quality and quantity; (6) maintaining the wild character of the
Refuge and quality visitor experiences; (7) proactively addressing the
uncertainties of climate change; and (8) providing more outreach and
better communication for the public. We considered and evaluated all of
these issues through the alternatives, goals, and objectives addressed
or described in the draft CCP and the EA.
CCP Alternatives We Considered
The draft CCP and EA described and evaluated three alternatives for
managing the Refuge. These alternatives followed much of the same
general management direction. Alternative A (the No-Action
Alternative), required under the National Environmental Policy Act
(NEPA), described continuation of current management activities. Under
Alternative A, management of the Refuge would have continued to follow
direction described in the 1987 CCP and record of decision as modified
by subsequent program-specific plans (e.g., fisheries and fire
management plans). Alternative A would have continued to protect and
maintain the existing wildlife values, natural diversity, and
ecological integrity of the Refuge. Human disturbances to fish and
wildlife habitats and populations would have been minimal. Private and
commercial uses of the Refuge would not have changed, and public uses
employing existing access methods would have continued to be allowed.
Opportunities would have been maintained to pursue traditional
subsistence activities and recreational hunting, fishing, and other
wildlife dependent activities. Opportunities would have been maintained
to pursue research activities.
Alternative B (the Preferred Alternative) proposed to follow
management direction described in the 1987 CCP and record of decision
as modified by subsequent program-specific plans, but some of that
management direction has been updated by changes in policy since the
1987 Selawik CCP was approved. Alternative B identified these specific
changes in management direction and new goals and objectives for Refuge
management that would be adopted regardless of which alternative is
selected. Alternative B proposed continuing the policy of not making
some public lands, which are intermingled with private lands, available
for use by commercial guides and transporters whose clients are big
game hunting. Alternative B proposed that a formal partnership be
created between the Refuge and local entities to jointly maintain a
shared facility of one or more buildings with capacity for office,
meeting, and storage space in a community within the refuge.
Alternative B proposed a study of traditional access for subsistence
purposes. Alternative B proposed that local public use and access needs
be addressed by creating formal partnerships between the Refuge and
various local entities.
Alternative C would have continued to follow management direction
described in Alternative A as modified by subsequent program-specific
plans. Alternative C would have identified any specific changes or
updates in management direction and adopted the new goals and
objectives for Refuge management. Alternative C proposed that the
Refuge manager could open or close some public lands, which are
intermingled with private lands, to use by commercial guides and
transporters whose clients are big game hunting. Alternative C proposed
that the Refuge independently maintain a facility of one or more
buildings with capacity for office, meeting, and storage space in a
community within the refuge. Alternative C proposed the same study of
traditional access for subsistence purposes. Alternative C would
address local public use and access needs slightly differently from
Alternative B by proposing to expand or improve some opportunities for
public use and access on Refuge lands.
Changes Between Draft and Final Plan
The preferred alternative (Alternative B) was slightly modified as
a result of public comments on the draft Plan. Use by commercial guides
and transporters for big game hunting is not authorized by permit
stipulation on refuge lands that are in close proximity to or
intermingled with private lands in the northwest portion of the refuge.
Alternative B was modified to authorize use by commercial guides and
transporters in an additional 68,000 acres of the refuge. In addition,
Alternative B was modified to indicate that, on a case-by-case basis,
the refuge manager may authorize commercial use by special use permit
for a part of the area where guiding is not authorized upon completion
of a compatibility determination and a subsistence evaluation as
required by ANILCA Section 810.
The management of shelter cabins on refuge lands in Alternative B
was modified to include the following management. A formal partnership
will be created among the Service, Selawik Refuge, Northwest Arctic
Borough, NANA regional corporation, and local search and rescue
organizations to formalize the roles and responsibilities of each
partner in performing regular maintenance and/or replacement of shelter
cabins on refuge lands. Members of the formal partnership will review
the need for additional shelter cabins and appropriate location(s) for
them, with the option of joint construction of an additional 1-2
shelter cabins or relocation of an existing shelter cabin on refuge
lands.
Compliance With the National Environmental Policy Act
We are furnishing this notice to advise other agencies and the
public of the availability of the final CCP and FONSI. Based on the
review and evaluation of the information contained in the draft CCP and
EA, we have determined that implementation of the final CCP does not
constitute a major Federal action that would significantly affect the
quality of the human environment within the meaning of Section
102(2)(c) of the National Environmental Policy Act (NEPA). Therefore,
an Environmental Impact Statement will not be prepared. Future site-
specific proposals discussed in the final CCP requiring additional NEPA
compliance will be addressed in separate planning efforts with full
public involvement.
Dated: September 22, 2011.
Geoffrey L. Haskett,
Regional Director, U.S. Fish and Wildlife Service, Anchorage, Alaska.
[FR Doc. 2011-25068 Filed 9-28-11; 8:45 am]
BILLING CODE 4310-55-P