Mona South Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 60491 [2011-25057]

Download as PDF Federal Register / Vol. 76, No. 189 / Thursday, September 29, 2011 / Notices assistance, contact FERC Online Support. Dated: September 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–25056 Filed 9–28–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14240–000] tkelley on DSKG8SOYB1PROD with NOTICES Mona South Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 1, 2011, Mona South Pumped Storage Project, LLC, California, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Mona South Pumped Storage Project (Mona South Pumped Storage Project or Project) to be located within Wide Canyon, 4 miles southwest of Mona, Juab County, Utah. The project affects federal lands administered by the Bureau of Land Management. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An underground powerhouse containing the pumpturbines and motor-generators; (2) a waterway roughly 7,100 feet-long, including inlet/outlet structures at each reservoir, headrace tunnel, pressure shaft, buried penstock, and tailrace features connecting the upper reservoir, the underground powerhouse and the lower reservoir; (3) transmission line connecting the underground powerhouse to the proposed PacifiCorp/ Rocky Mountain Power Clover Substation; (4) a two reservoir construction (upper reservoir), a 370 feet-long by 3,000 feet-long concretefaced dam located within Wide Canyon bordered by Middle Ridge and Long Ridge having a storage capacity of about 20,400 acre-feet and a water surface area of 218 acres at full pool elevation of 6,480 above mean sea level (msl); (5) a 110 foot-high and 13,000 feet-high, earthfill ring dike (lower reservoir) with VerDate Mar<15>2010 15:29 Sep 28, 2011 Jkt 223001 a water surface area of about 261 acres Full pool elevation 5,880 feet msl; (6) location of lower reservoir and length of water-way connection will be determined later to ensure efficiency; (7) optimization of generation and energy storage ranging from a 4 unit, 500 megawatts (MW) (4 units × 125 MW unit) to a 4 unit, 1,000 MW (4 units × 250 MW unit) allowing for 8 to 10 hours of continuous output; (8) Project’s interconnection at this new substation would require roughly 5 mile-long transmission line connecting powerhouse to the substation, which my be one or two circuts. Interconnection voltage may be 230 or 500 kilovolts; and (9) annual generation would be within 1,800 to 4,500 gigawatthours depending on constructed option. Applicant Contact: Mr. Nathan Sandvig, Mona North Pumped Storage Project, LLC c/o enXco Development Corporation, 517 SW 4th Avenue, Suite 300, Portland, OR 97204; phone (503) 219–3166. FERC Contact: Brian Csernak; phone: (202) 502–6144. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14240–000) in the docket number field to access the PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 60491 document. For assistance, contact FERC Online Support. Dated: September 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–25057 Filed 9–28–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Records Governing Off-the-Record Communications; Public Notice This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file associated with, but not a part of, the decisional record of the proceeding. Unless the Commission determines that the prohibited communication and any responses thereto should become a part of the decisional record, the prohibited off-the-record communication will not be considered by the Commission in reaching its decision. Parties to a proceeding may seek the opportunity to respond to any facts or contentions made in a prohibited off-the-record communication, and may request that the Commission place the prohibited communication and responses thereto in the decisional record. The Commission will grant such a request only when it determines that fairness so requires. Any person identified below as having made a prohibited off-the-record communication shall serve the document on all parties listed on the official service list for the applicable proceeding in accordance with Rule 2010, 18 CFR 385.2010. Exempt off-the-record communications are included in the decisional record of the proceeding, unless the communication was with a cooperating agency as described by 40 CFR 1501.6, made under 18 CFR 385.2201(e)(1)(v). The following is a list of off-therecord communications recently E:\FR\FM\29SEN1.SGM 29SEN1

Agencies

[Federal Register Volume 76, Number 189 (Thursday, September 29, 2011)]
[Notices]
[Page 60491]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-25057]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14240-000]


Mona South Pumped Storage Project; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On August 1, 2011, Mona South Pumped Storage Project, LLC, 
California, filed an application for a preliminary permit, pursuant to 
section 4(f) of the Federal Power Act (FPA), proposing to study the 
feasibility of the Mona South Pumped Storage Project (Mona South Pumped 
Storage Project or Project) to be located within Wide Canyon, 4 miles 
southwest of Mona, Juab County, Utah. The project affects federal lands 
administered by the Bureau of Land Management. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) An 
underground powerhouse containing the pump-turbines and motor-
generators; (2) a waterway roughly 7,100 feet-long, including inlet/
outlet structures at each reservoir, headrace tunnel, pressure shaft, 
buried penstock, and tailrace features connecting the upper reservoir, 
the underground powerhouse and the lower reservoir; (3) transmission 
line connecting the underground powerhouse to the proposed PacifiCorp/
Rocky Mountain Power Clover Substation; (4) a two reservoir 
construction (upper reservoir), a 370 feet-long by 3,000 feet-long 
concrete-faced dam located within Wide Canyon bordered by Middle Ridge 
and Long Ridge having a storage capacity of about 20,400 acre-feet and 
a water surface area of 218 acres at full pool elevation of 6,480 above 
mean sea level (msl); (5) a 110 foot-high and 13,000 feet-high, 
earthfill ring dike (lower reservoir) with a water surface area of 
about 261 acres Full pool elevation 5,880 feet msl; (6) location of 
lower reservoir and length of water-way connection will be determined 
later to ensure efficiency; (7) optimization of generation and energy 
storage ranging from a 4 unit, 500 megawatts (MW) (4 units x 125 MW 
unit) to a 4 unit, 1,000 MW (4 units x 250 MW unit) allowing for 8 to 
10 hours of continuous output; (8) Project's interconnection at this 
new substation would require roughly 5 mile-long transmission line 
connecting powerhouse to the substation, which my be one or two 
circuts. Interconnection voltage may be 230 or 500 kilovolts; and (9) 
annual generation would be within 1,800 to 4,500 gigawatthours 
depending on constructed option.
    Applicant Contact: Mr. Nathan Sandvig, Mona North Pumped Storage 
Project, LLC c/o enXco Development Corporation, 517 SW 4th Avenue, 
Suite 300, Portland, OR 97204; phone (503) 219-3166.
    FERC Contact: Brian Csernak; phone: (202) 502-6144.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14240-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: September 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-25057 Filed 9-28-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.