Mona South Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 60491 [2011-25057]
Download as PDF
Federal Register / Vol. 76, No. 189 / Thursday, September 29, 2011 / Notices
assistance, contact FERC Online
Support.
Dated: September 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–25056 Filed 9–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14240–000]
tkelley on DSKG8SOYB1PROD with NOTICES
Mona South Pumped Storage Project;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 1, 2011, Mona South
Pumped Storage Project, LLC,
California, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Mona South Pumped Storage Project
(Mona South Pumped Storage Project or
Project) to be located within Wide
Canyon, 4 miles southwest of Mona,
Juab County, Utah. The project affects
federal lands administered by the
Bureau of Land Management. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An underground
powerhouse containing the pumpturbines and motor-generators; (2) a
waterway roughly 7,100 feet-long,
including inlet/outlet structures at each
reservoir, headrace tunnel, pressure
shaft, buried penstock, and tailrace
features connecting the upper reservoir,
the underground powerhouse and the
lower reservoir; (3) transmission line
connecting the underground
powerhouse to the proposed PacifiCorp/
Rocky Mountain Power Clover
Substation; (4) a two reservoir
construction (upper reservoir), a 370
feet-long by 3,000 feet-long concretefaced dam located within Wide Canyon
bordered by Middle Ridge and Long
Ridge having a storage capacity of about
20,400 acre-feet and a water surface area
of 218 acres at full pool elevation of
6,480 above mean sea level (msl); (5) a
110 foot-high and 13,000 feet-high,
earthfill ring dike (lower reservoir) with
VerDate Mar<15>2010
15:29 Sep 28, 2011
Jkt 223001
a water surface area of about 261 acres
Full pool elevation 5,880 feet msl; (6)
location of lower reservoir and length of
water-way connection will be
determined later to ensure efficiency; (7)
optimization of generation and energy
storage ranging from a 4 unit, 500
megawatts (MW) (4 units × 125 MW
unit) to a 4 unit, 1,000 MW (4 units ×
250 MW unit) allowing for 8 to 10 hours
of continuous output; (8) Project’s
interconnection at this new substation
would require roughly 5 mile-long
transmission line connecting
powerhouse to the substation, which my
be one or two circuts. Interconnection
voltage may be 230 or 500 kilovolts; and
(9) annual generation would be within
1,800 to 4,500 gigawatthours depending
on constructed option.
Applicant Contact: Mr. Nathan
Sandvig, Mona North Pumped Storage
Project, LLC c/o enXco Development
Corporation, 517 SW 4th Avenue, Suite
300, Portland, OR 97204; phone (503)
219–3166.
FERC Contact: Brian Csernak; phone:
(202) 502–6144.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at http:
//www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14240–000)
in the docket number field to access the
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
60491
document. For assistance, contact FERC
Online Support.
Dated: September 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–25057 Filed 9–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 76, Number 189 (Thursday, September 29, 2011)]
[Notices]
[Page 60491]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-25057]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14240-000]
Mona South Pumped Storage Project; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 1, 2011, Mona South Pumped Storage Project, LLC,
California, filed an application for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act (FPA), proposing to study the
feasibility of the Mona South Pumped Storage Project (Mona South Pumped
Storage Project or Project) to be located within Wide Canyon, 4 miles
southwest of Mona, Juab County, Utah. The project affects federal lands
administered by the Bureau of Land Management. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) An
underground powerhouse containing the pump-turbines and motor-
generators; (2) a waterway roughly 7,100 feet-long, including inlet/
outlet structures at each reservoir, headrace tunnel, pressure shaft,
buried penstock, and tailrace features connecting the upper reservoir,
the underground powerhouse and the lower reservoir; (3) transmission
line connecting the underground powerhouse to the proposed PacifiCorp/
Rocky Mountain Power Clover Substation; (4) a two reservoir
construction (upper reservoir), a 370 feet-long by 3,000 feet-long
concrete-faced dam located within Wide Canyon bordered by Middle Ridge
and Long Ridge having a storage capacity of about 20,400 acre-feet and
a water surface area of 218 acres at full pool elevation of 6,480 above
mean sea level (msl); (5) a 110 foot-high and 13,000 feet-high,
earthfill ring dike (lower reservoir) with a water surface area of
about 261 acres Full pool elevation 5,880 feet msl; (6) location of
lower reservoir and length of water-way connection will be determined
later to ensure efficiency; (7) optimization of generation and energy
storage ranging from a 4 unit, 500 megawatts (MW) (4 units x 125 MW
unit) to a 4 unit, 1,000 MW (4 units x 250 MW unit) allowing for 8 to
10 hours of continuous output; (8) Project's interconnection at this
new substation would require roughly 5 mile-long transmission line
connecting powerhouse to the substation, which my be one or two
circuts. Interconnection voltage may be 230 or 500 kilovolts; and (9)
annual generation would be within 1,800 to 4,500 gigawatthours
depending on constructed option.
Applicant Contact: Mr. Nathan Sandvig, Mona North Pumped Storage
Project, LLC c/o enXco Development Corporation, 517 SW 4th Avenue,
Suite 300, Portland, OR 97204; phone (503) 219-3166.
FERC Contact: Brian Csernak; phone: (202) 502-6144.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14240-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: September 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-25057 Filed 9-28-11; 8:45 am]
BILLING CODE 6717-01-P