North Dakota Administrative Code
Title 43 - Industrial Commission
Article 43-02 - Mineral Exploration and Development
Chapter 43-02-02.2 - In Situ Leach Mining Rules
- Section 43-02-02.2-01 - Definitions
- Section 43-02-02.2-02 - Scope of chapter
- Section 43-02-02.2-03 - Permit required
- Section 43-02-02.2-04 - Submission of permit application
- Section 43-02-02.2-05 - Review for completeness
- Section 43-02-02.2-06 - Review period
- Section 43-02-02.2-07 - Permit applications and annual operating fees
- Section 43-02-02.2-08 - Notice of hearing
- Section 43-02-02.2-09 - Information added after filing date
- Section 43-02-02.2-10 - Notice to agencies
- Section 43-02-02.2-11 - Summary document
- Section 43-02-02.2-12 - Permit approval or denial
- Section 43-02-02.2-13 - Bond
- Section 43-02-02.2-14 - Permit application - General requirements
- Section 43-02-02.2-15 - Permit application - General contents
- Section 43-02-02.2-16 - Permit application - Additional baseline information
- Section 43-02-02.2-17 - Permit application - Mine operations plan
- Section 43-02-02.2-18 - Permit application - Reclamation plan
- Section 43-02-02.2-19 - Determination of ground water restoration demonstration
- Section 43-02-02.2-20 - Ground water restoration values
- Section 43-02-02.2-21 - Establishing baseline water quality and control parameters in new mining areas
- Section 43-02-02.2-22 - Technical revisions to an in situ leach mine permit
- Section 43-02-02.2-23 - Designation of exempted aquifers
- Section 43-02-02.2-24 - Injection wells subject to this chapter
- Section 43-02-02.2-25 - Well location and protection
- Section 43-02-02.2-26 - Well construction requirements - General
- Section 43-02-02.2-27 - Well construction requirements - Injection wells
- Section 43-02-02.2-28 - Monitoring wells - Minimum requirements
- Section 43-02-02.2-29 - Disposal of drill cuttings
- Section 43-02-02.2-30 - Mechanical integrity
- Section 43-02-02.2-31 - Supervision of well construction and testing
- Section 43-02-02.2-32 - Requirements for plugging drill holes and repair, conversion, and plugging wells
- Section 43-02-02.2-33 - Corrective actions for improperly sealed wells
- Section 43-02-02.2-34 - Authorizing new injection wells within permit area boundary
- Section 43-02-02.2-35 - Design and construction of surface facilities
- Section 43-02-02.2-36 - Construction quality assurance plan
- Section 43-02-02.2-37 - Pipeline design and construction requirements
- Section 43-02-02.2-38 - Radioactive element recovery plant and satellite facility design and construction requirements
- Section 43-02-02.2-39 - Radioactive element by product material handling and disposal systems
- Section 43-02-02.2-40 - Disposal of liquid waste
- Section 43-02-02.2-41 - Disposal of nonradioactive solid waste
- Section 43-02-02.2-42 - Prohibitions - Injection volumes and pressure
- Section 43-02-02.2-43 - Production area operational monitoring requirements
- Section 43-02-02.2-44 - Production area monitoring well location and spacing requirements
- Section 43-02-02.2-45 - Nonproduction zone monitoring
- Section 43-02-02.2-46 - Subsidence monitoring
- Section 43-02-02.2-47 - Confinement of recovery fluid
- Section 43-02-02.2-48 - Excursions - Reporting requirement
- Section 43-02-02.2-49 - Excursions - Verifying analysis
- Section 43-02-02.2-50 - Excursions - Sampling frequency
- Section 43-02-02.2-51 - Excursions - Remedial action
- Section 43-02-02.2-52 - Excursions - Controlled
- Section 43-02-02.2-53 - Excursions - Not controlled
- Section 43-02-02.2-54 - Criteria for determination of adequacy of remedial action plan
- Section 43-02-02.2-55 - General reporting requirements
- Section 43-02-02.2-56 - Well construction records
- Section 43-02-02.2-57 - Well plugging records
- Section 43-02-02.2-58 - Maintenance and retention of records
- Section 43-02-02.2-59 - Ground water restoration requirements
- Section 43-02-02.2-60 - Restoration sampling procedure
- Section 43-02-02.2-61 - Restoration progress reports
- Section 43-02-02.2-62 - Final restoration - Restoration values achieved
- Section 43-02-02.2-63 - Restoration values not achieved
- Section 43-02-02.2-64 - Closure of mine site following restoration
- Section 43-02-02.2-65 - Postclosure plan - Postclosure bond - Estimated costs for postclosure care
- Section 43-02-02.2-66 - Reclamation of surface facilities
- Section 43-02-02.2-67 - Radiation survey of surface facilities at mine closure
- Section 43-02-02.2-68 - Radiation standards for closure of surface facilities
- Section 43-02-02.2-69 - General postclosure inspection, annual report, and maintenance activities
- Section 43-02-02.2-70 - Postclosure operation of monitoring systems
- Section 43-02-02.2-71 - Ground water contamination during the postclosure period
- Section 43-02-02.2-72 - Approval of the end of the postclosure period
- Section 43-02-02.2-73 - Available information on in situ leach mines
- Section 43-02-02.2-74 - Final bond release
- Section 43-02-02.2-75 - Additional information may be required
- Section 43-02-02.2-76 - Application for hearing
- Section 43-02-02.2-77 - Hearing participants by telephone
- Section 43-02-02.2-78 - Hearings - Complaint proceedings - Emergency proceedings - Other proceedings
- Section 43-02-02.2-79 - Investigatory hearings
- Section 43-02-02.2-80 - Official notice
- Section 43-02-02.2-81 - Notice of order by mail
- Section 43-02-02.2-82 - Record of proceedings
- Section 43-02-02.2-83 - Designation of examiners
- Section 43-02-02.2-84 - Powers and duties of examiner
- Section 43-02-02.2-85 - Examiner's recommended findings, conclusions, and proposed order
- Section 43-02-02.2-86 - Commission order
- Section 43-02-02.2-87 - Prehearing motion practice
Disclaimer: These regulations may not be the most recent version. North Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.