Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria
Document Number: 2017-25298
Type: Notice
Date: 2017-11-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; ADS and IRWST Injection Block
Document Number: 2017-25297
Type: Notice
Date: 2017-11-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 91 and 90 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Changes to Containment Cooling and Spent Fuel Pool Makeup Strategies
Document Number: 2017-25296
Type: Notice
Date: 2017-11-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment and exemption to Combined Licenses (NPF-91 and NPF-92), issued to Southern Nuclear Operating Company, Inc. (SNC), and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (together ``the licensees''), for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia.
Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance, Revision 1
Document Number: 2017-25271
Type: Notice
Date: 2017-11-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG), ``Clarification of Licensee Actions in Receipt of Enforcement Discretion per Enforcement Guidance Memorandum (EGM) 15-002, `Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance,' Revision 1.'' The revisions provide clarifying guidance to facilitate the NRC staff's consistent oversight associated with implementing enforcement discretion for tornado missile protection noncompliance(s) per EGM 15-002.