Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Changes to Containment Cooling and Spent Fuel Pool Makeup Strategies, 55654-55657 [2017-25296]
Download as PDF
55654
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
asabaliauskas on DSKBBXCHB2PROD with NOTICES
circumstance is not necessary to serve
the underlying purpose of the rule;
E. the special circumstances outweigh
any decrease in safety that may result
from the reduction in standardization
caused by the exemption; and
F. the exemption will not result in a
significant decrease in the level of safety
otherwise provided by the design.
2. Accordingly, the licensee is granted
an exemption from the certified DCD
Tier 1 information, with corresponding
changes to Appendix C of the Facility
Combined License as described in the
request dated October 14, 2016, as
supplemented by letters dated February
23, 2017, and May 9, 2017. This
exemption is related to, and necessary
for the granting of License Amendment
No. 91 (Unit 3) and 90 (Unit 4), which
is being issued concurrently with this
exemption.
3. As explained in Section 5.0 of the
NRC staff’s Safety Evaluation (ADAMS
Accession No. ML17268A084), this
exemption meets the eligibility criteria
for categorical exclusion set forth in 10
CFR 51.22(c)(9). Therefore, pursuant to
10 CFR 51.22(b), no environmental
impact statement or environmental
assessment needs to be prepared in
connection with the issuance of the
exemption.
4. This exemption is effective as of the
date of its issuance.
III. License Amendment Request
By letter dated October 14, 2016
(ADAMS Accession No. ML16288A810),
as supplemented by letters dated
February 23, 2017 (ADAMS Accession
No. ML17054D204), and May 9, 2017
(ADAMS Accession No. ML17129A589),
the licensee requested that the NRC
amend the COLs for VEGP, Units 3 and
4, COLs NPF–91 and NPF–92. The
proposed amendment is described in
Section I of this Federal Register notice.
The Commission has determined for
these amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR Chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or COL, as applicable, proposed
no significant hazards consideration
determination, and opportunity for a
hearing in connection with these
actions, was published in the Federal
Register on December 20, 2016 (81 FR
92873). No comments were received
during the 30-day comment period.
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
The Commission has determined that
these amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments.
IV. Conclusion
Using the reasons set forth in the
combined safety evaluation, the staff
granted the exemption and issued the
amendment that the licensee requested
on October 14, 2016, as supplemented
by letters dated February 23, 2017, and
May 9, 2017.
The exemption and amendment were
issued on October 19, 2017, as part of
a combined package to the licensee
(ADAMS Accession No. ML17268A075).
Dated at Rockville, Maryland, this 17th day
of November, 2017.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. 2017–25297 Filed 11–21–17; 8:45 am]
BILLING CODE 7590–01–P
A. Obtaining Information
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc., Vogtle Electric Generating Plant,
Units 3 and 4, Changes to Containment
Cooling and Spent Fuel Pool Makeup
Strategies
Nuclear Regulatory
Commission.
ACTION: License amendment application;
opportunity to comment, request a
hearing, and petition for leave to
intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment and
exemption to Combined Licenses (NPF–
91 and NPF–92), issued to Southern
Nuclear Operating Company, Inc. (SNC),
and Georgia Power Company,
Oglethorpe Power Corporation, MEAG
Power SPVM, LLC, MEAG Power SPVJ,
LLC, MEAG Power SPVP, LLC,
Authority of Georgia, and the City of
Dalton, Georgia (together ‘‘the
licensees’’), for construction and
operation of the Vogtle Electric
Generating Plant (VEGP), Units 3 and 4,
located in Burke County, Georgia.
DATES: Comments must be filed by
December 22, 2017.
ADDRESSES: You may submit comments
by any of the following methods:
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
NUCLEAR REGULATORY
COMMISSION
SUMMARY:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: May Ma, Office
of Administration, Mail Stop: OWFN–2–
A13, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Peter C. Hearn, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–1189; email: Peter.Hearn@
nrc.gov.
Please refer to Docket ID NRC–2008–
0252 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS):You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
application for amendment, dated July
14, 2017, is available in ADAMS under
Accession No. ML17198A596.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2008–
0252 in your comment submission.
E:\FR\FM\22NON1.SGM
22NON1
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
asabaliauskas on DSKBBXCHB2PROD with NOTICES
II. Introduction
The NRC is considering issuance of an
amendment to Facility Operating
License Nos. NPF–91 and NPF–92,
issued to the licensees for operation of
the VEGP Units 3 and 4 located in Burke
County, Georgia.
The proposed amendment would
change the plant-specific Tier 1 (and
COL Appendix C) to revise the
inspected volume for the spent fuel pool
and cask loading pit, and make
corresponding changes to the minimum
volumes. A new Tier 1 inspection is
also added for the cask washdown pit
with appropriate acceptance criteria for
its volume. The requested amendment
also proposes changes to the Technical
Specification reactor decay heat limits
and spent fuel pool decay heat limits
which reflect when various safety-relate
makeup path are required to be
available for containment cooling or
spent fuel pool makeup.
Before any issuance of the proposed
license amendment, the NRC will need
to make the findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and NRC’s regulations.
The NRC has made a proposed
determination that the license
amendment request Involves no
significant hazards consideration. Under
the NRC’s regulations in 10 CFR 50.92,
this means that operation of the facility
in accordance with the proposed
amendment would not (1) involve a
significant increase in the probability or
consequences of an accident previously
evaluated; or (2) create the possibility of
a new or different kind of accident from
any accident previously evaluated; or
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
(3) involve a significant reduction in a
margin of safety.
As required by section 50.91(a) of title
10 of the Code of Federal Regulations
(10 CFR), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes ensure that
sufficient spent fuel cooling is provided
based on the revised analyses that properly
account for thermal expansion and voiding in
the Spent Fuel Pool (SFP). The containment
and spent fuel cooling capabilities remain
adequate to meet the design bases following
a seismic event and station blackout. The
proposed changes do not alter an accident
initiating component, nor do the proposed
changes create any new accident precursors,
and thus, the probabilities of the accidents
previously evaluated are not affected. The
plant response to previously evaluated
accidents or external events is not adversely
affected. Thus, the proposed changes would
not affect any safety-related accident
mitigating function. The radioactive material
source terms and release paths used in the
safety analyses are unchanged, thus the
radiological releases in the UFSAR accident
analyses are not affected.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes are supported by the
revised analyses that demonstrate the ability
of the affected systems to perform their
design function, and additionally, do not
introduce a new failure mechanism into the
design. The proposed changes do not involve
a new failure mechanism or malfunction,
which affects a system, structure, or
component (SSC) accident initiator, or
interface with any SSC accident initiator or
initiating sequence of events considered in
the design and licensing bases. There is no
adverse effect on radioisotope barriers or the
release of radioactive materials. The
proposed amendment does not adversely
affect any accident, including the possibility
of creating a new or different kind of accident
from any accident previously evaluated.
Therefore, the proposed changes do not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed changes ensure that
sufficient spent fuel cooling is provided
based on the revised analyses that properly
account for thermal expansion and voiding in
the SFP. The containment and spent fuel
cooling capabilities remain adequate to meet
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
55655
the design bases following a seismic event
and station blackout. The containment and
SFP cooling capabilities continue to comply
with the existing UFSAR regulatory
requirements and industry standards. The
proposed changes would not affect any
safety-related design code, function, design
analysis, safety analysis input or result, or
existing design/safety margin. No safety
analysis or design basis acceptance limit or
criterion is challenged or exceeded by the
requested changes.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the license
amendment request involves no
significant hazards consideration.
The NRC is seeking public comments
on this proposed determination that the
license amendment request involves no
significant hazards consideration. Any
comments received within 60 days after
the date of publication of this notice
will be considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day notice period if the Commission
concludes the amendment involves no
significant hazards consideration. In
addition, the Commission may issue the
amendment prior to the expiration of
the 60-day comment period should
circumstances change during the 60-day
comment period such that failure to act
in a timely way would result, for
example, in derating or shutdown of the
facility. Should the Commission take
action prior to the expiration of either
the comment period or the notice
period, the Commission will publish a
notice of issuance in the Federal
Register. Should the Commission make
a final no significant hazards
consideration determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur very
infrequently.
III. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
E:\FR\FM\22NON1.SGM
22NON1
asabaliauskas on DSKBBXCHB2PROD with NOTICES
55656
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s Web site at
https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of
the regulations is available at the NRC’s
Public Document Room, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. If a petition is filed,
the Commission or a presiding officer
will rule on the petition and, if
appropriate, a notice of a hearing will be
issued.
As required by 10 CFR 2.309(d) the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to
establish when the hearing is held. If the
final determination is that the
amendment request involves no
significant hazards consideration, the
Commission may issue the amendment
and make it immediately effective,
notwithstanding the request for a
hearing. Any hearing would take place
after issuance of the amendment. If the
final determination is that the
amendment request involves a
significant hazards consideration, then
any hearing held would take place
before the issuance of the amendment
unless the Commission finds an
imminent danger to the health or safety
of the public, in which case it will issue
an appropriate order or rule under 10
CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission by January 22, 2018. The
petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
governmental body, or federally
recognized Indian Tribe, or agency
thereof does not need to address the
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. Alternatively, a State,
local governmental body, Federallyrecognized Indian Tribe, or agency
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
thereof may participate as a non-party
under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562, August 3, 2012). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the Internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the NRC
Web site at https://www.nrc.gov/sitehelp/e-submittals.html. Participants
may not submit paper copies of their
filings unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
E:\FR\FM\22NON1.SGM
22NON1
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public Web site at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the
E-Filing system time-stamps the
document and sends the submitter an
email notice confirming receipt of the
document. The E-Filing system also
distributes an email notice that provides
access to the document to the NRC’s
Office of the General Counsel and any
others who have advised the Office of
the Secretary that they wish to
participate in the proceeding, so that the
filer need not serve the document on
those participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
VerDate Sep<11>2014
18:57 Nov 21, 2017
Jkt 244001
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click cancel when
the link requests certificates and you
will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
For further details with respect to this
action, see the application for license
amendment dated July 14, 2017.
Attorney for licensee: Mr. M. Stanford
Blanton, Balch & Bingham LLP, 1710
Sixth Avenue North, Birmingham, AL
35203–2015.
NRC Branch Chief: Jennifer L. DixonHerrity.
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
55657
Dated at Rockville, Maryland, this 17th day
of November 2017.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. 2017–25296 Filed 11–21–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2017–0052]
Enforcement Discretion for TornadoGenerated Missile Protection
Noncompliance, Revision 1
Nuclear Regulatory
Commission.
ACTION: Interim staff guidance; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing Interim
Staff Guidance (ISG), ‘‘Clarification of
Licensee Actions in Receipt of
Enforcement Discretion per
Enforcement Guidance Memorandum
(EGM) 15–002, ‘Enforcement Discretion
for Tornado-Generated Missile
Protection Noncompliance,’ Revision
1.’’ The revisions provide clarifying
guidance to facilitate the NRC staff’s
consistent oversight associated with
implementing enforcement discretion
for tornado missile protection
noncompliance(s) per EGM 15–002.
DATES: The applicable date of the ISG is
November 22, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2017–0052 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0052. Address
questions about NRC dockets to Carol
Gallagher, telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
SUMMARY:
E:\FR\FM\22NON1.SGM
22NON1
Agencies
[Federal Register Volume 82, Number 224 (Wednesday, November 22, 2017)]
[Notices]
[Pages 55654-55657]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-25296]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc., Vogtle Electric
Generating Plant, Units 3 and 4, Changes to Containment Cooling and
Spent Fuel Pool Makeup Strategies
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; opportunity to comment, request
a hearing, and petition for leave to intervene.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment and exemption to Combined Licenses (NPF-91 and
NPF-92), issued to Southern Nuclear Operating Company, Inc. (SNC), and
Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM,
LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia,
and the City of Dalton, Georgia (together ``the licensees''), for
construction and operation of the Vogtle Electric Generating Plant
(VEGP), Units 3 and 4, located in Burke County, Georgia.
DATES: Comments must be filed by December 22, 2017.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: May Ma, Office of Administration, Mail
Stop: OWFN-2-A13, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Peter C. Hearn, Office of New
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-1189; email: Peter.Hearn@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2008-0252 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252.
NRC's Agencywide Documents Access and Management System
(ADAMS):You may obtain publicly-available documents online in the ADAMS
Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
application for amendment, dated July 14, 2017, is available in ADAMS
under Accession No. ML17198A596.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2008-0252 in your comment submission.
[[Page 55655]]
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Introduction
The NRC is considering issuance of an amendment to Facility
Operating License Nos. NPF-91 and NPF-92, issued to the licensees for
operation of the VEGP Units 3 and 4 located in Burke County, Georgia.
The proposed amendment would change the plant-specific Tier 1 (and
COL Appendix C) to revise the inspected volume for the spent fuel pool
and cask loading pit, and make corresponding changes to the minimum
volumes. A new Tier 1 inspection is also added for the cask washdown
pit with appropriate acceptance criteria for its volume. The requested
amendment also proposes changes to the Technical Specification reactor
decay heat limits and spent fuel pool decay heat limits which reflect
when various safety-relate makeup path are required to be available for
containment cooling or spent fuel pool makeup.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the Atomic Energy Act of 1954, as
amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request Involves no significant hazards consideration. Under
the NRC's regulations in 10 CFR 50.92, this means that operation of the
facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety.
As required by section 50.91(a) of title 10 of the Code of Federal
Regulations (10 CFR), the licensee has provided its analysis of the
issue of no significant hazards consideration, which is presented
below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes ensure that sufficient spent fuel cooling
is provided based on the revised analyses that properly account for
thermal expansion and voiding in the Spent Fuel Pool (SFP). The
containment and spent fuel cooling capabilities remain adequate to
meet the design bases following a seismic event and station
blackout. The proposed changes do not alter an accident initiating
component, nor do the proposed changes create any new accident
precursors, and thus, the probabilities of the accidents previously
evaluated are not affected. The plant response to previously
evaluated accidents or external events is not adversely affected.
Thus, the proposed changes would not affect any safety-related
accident mitigating function. The radioactive material source terms
and release paths used in the safety analyses are unchanged, thus
the radiological releases in the UFSAR accident analyses are not
affected.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes are supported by the revised analyses that
demonstrate the ability of the affected systems to perform their
design function, and additionally, do not introduce a new failure
mechanism into the design. The proposed changes do not involve a new
failure mechanism or malfunction, which affects a system, structure,
or component (SSC) accident initiator, or interface with any SSC
accident initiator or initiating sequence of events considered in
the design and licensing bases. There is no adverse effect on
radioisotope barriers or the release of radioactive materials. The
proposed amendment does not adversely affect any accident, including
the possibility of creating a new or different kind of accident from
any accident previously evaluated.
Therefore, the proposed changes do not create the possibility of
a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed changes ensure that sufficient spent fuel cooling
is provided based on the revised analyses that properly account for
thermal expansion and voiding in the SFP. The containment and spent
fuel cooling capabilities remain adequate to meet the design bases
following a seismic event and station blackout. The containment and
SFP cooling capabilities continue to comply with the existing UFSAR
regulatory requirements and industry standards. The proposed changes
would not affect any safety-related design code, function, design
analysis, safety analysis input or result, or existing design/safety
margin. No safety analysis or design basis acceptance limit or
criterion is challenged or exceeded by the requested changes.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves no significant hazards
consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 60 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 60-day comment
period should circumstances change during the 60-day comment period
such that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. Should the Commission take action
prior to the expiration of either the comment period or the notice
period, the Commission will publish a notice of issuance in the Federal
Register. Should the Commission make a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
III. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's
[[Page 55656]]
``Agency Rules of Practice and Procedure'' in 10 CFR part 2. Interested
persons should consult a current copy of 10 CFR 2.309. The NRC's
regulations are accessible electronically from the NRC Library on the
NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/.
Alternatively, a copy of the regulations is available at the NRC's
Public Document Room, located at One White Flint North, Room O1-F21,
11555 Rockville Pike (first floor), Rockville, Maryland 20852. If a
petition is filed, the Commission or a presiding officer will rule on
the petition and, if appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the Commission may issue the amendment and make it
immediately effective, notwithstanding the request for a hearing. Any
hearing would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of the amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission by
January 22, 2018. The petition must be filed in accordance with the
filing instructions in the ``Electronic Submissions (E-Filing)''
section of this document, and should meet the requirements for
petitions set forth in this section, except that under 10 CFR
2.309(h)(2) a State, local governmental body, or federally recognized
Indian Tribe, or agency thereof does not need to address the standing
requirements in 10 CFR 2.309(d) if the facility is located within its
boundaries. Alternatively, a State, local governmental body, Federally-
recognized Indian Tribe, or agency thereof may participate as a non-
party under 10 CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562, August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the Internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and advise the
Secretary that the participant will be submitting a petition or other
adjudicatory document (even in instances in which the participant, or
its
[[Page 55657]]
counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public Web site at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public Web site at https://www.nrc.gov/site-help/e-submittals.html, by
email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click cancel when the link
requests certificates and you will be automatically directed to the
NRC's electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
For further details with respect to this action, see the
application for license amendment dated July 14, 2017.
Attorney for licensee: Mr. M. Stanford Blanton, Balch & Bingham
LLP, 1710 Sixth Avenue North, Birmingham, AL 35203-2015.
NRC Branch Chief: Jennifer L. Dixon-Herrity.
Dated at Rockville, Maryland, this 17th day of November 2017.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of
New Reactors.